Loading...
HomeMy WebLinkAbout120122 - DRC Avenir Pod 18PALM BEACH MEMORANDUM CITY OF PALM BEACH GARDENS TO: Mark Hendrickson, City Forester Ross Gilmore, GIS Manager Todd Engle, City Engineer / Kathy Gilbert, Deputy City Engineer Scott Danielski, Building Official Jennifer Nelli, Community Services Operations Manager Jeneve Labossiere, Police Sergeant / Robert Seay, Police Officer Neil Rosenberger, Fire Marshal Bruce Gregg, Seacoast Utility Authority Andrea Troutman, Pinder Troutman Consulting Via PBG Email: Patty Snider, City Clerk Renata Schwedhelm, Agenda Coordinator Stephen Stepp, Deputy City Manager Lori Laverriere, Deputy City Manager John Boehm, Assistant to the City Manager David Reyes, Community Services Administrator Angela Brown, Deputy Community Services Administrator JR Evans, Neighborhood Services Director Bahareh Wolfs, Development Compliance and Zoning Manager Charlotte Presensky, Leisure Services Administrator Madelyn Marconi, Administrative Services Manager R. Max Lohman, City Attorney Janice Massie, Legal Administration Manager Barbara Chabre, Executive Legal Assistant Via Email: Daniel Turbet, Florida Power and Light Nicholas Ramos, Florida Power and Light Anthony Lozano, Florida Power and Light Vaughn Moncrieffe, Florida Power and Light Rick Kania, Waste Management Fred Harmon Jr., Waste Management Yash Nagal, Palm Tran Nina Verzosa, Palm Tran Bruce Guyton, Palm Tran Michael Owens, School District of Palm Beach County Joyell Shaw, School District of Palm Beach County Ken Roundtree, Northern Palm Beach County Improvement District DATE: November 15, 2022 FROM: Christopher Yerkes cyerkes@pbgfl.com 561-799-4253 (direct line) SUBJECT: SPLN-22-09-000062 — Avenir PCD — Avenir POD 18 DRC Transmittal Memo SPLN-22-09-00oo62 October 5, 2022 Revised November 15, 2022 Please provide your comments on the subject petitions no later than Wednesday, October 19, 2022. Your comments must be forwarded to my attention by that date and time so that written comments can be given to the applicant in accordance with the timeframes established in the City's Land Development Code. Should you have no comments, please indicate so in a memo. Additional copies of the complete application are available in the Planning & Zoning Department. MEETING DATE AND TIME: A Development Review Committee meeting will be held in the City Council Chambers on Thursday, December 1, 2022, at -yoopm to review the following development application: PETITION: SPLN-22-o9-000062- A petition from Avenir Development, LLC requesting Site Plan approval for a ioi-lot single family subdivision, known as Pod 18. Thank you for your ongoing cooperation and assistance. Please contact me at (561) 799-4253 or cyerkes@pbgfl.com should you have any questions or comments. Cc: Natalie M. Crowley, AICP, Director of Planning and Zoning Peter S. Hofheinz, AICP, Assistant Director of Planning and Zoning Ken Tuma, Urban Design Studio Marty Minor, Urban Design Studio Page 2 of 2 PALM BEACH MEMORANDUM CITY OF PALM BEACH GARDENS TO: Ken uma, all Design Studio Marty Minor, Urban Design Studio DATE: November 4, 2022 CC: Natalie M. Crowley, AICP, Director of Planning and Zoning Peter Hofheinz, AICP, Assistant Director of Planning and Zoning Martin Fitts, AICP, Planning Manager Brett Leone, Senior Planner FROM: Christopher Yerkes, Planner C. Y SUBJECT: SPLN-22-o9-000062 — Avenir Development, LLC requesting site plan approval for 1o1 single family homes (Pod 18) within the Avenir Planned Community Development (PCD) The following comments are based on the above referenced petition submitted to the City on September 26, 2022, found sufficient on October 5, 2022. Planning and Zoning 1. Please update all applicable plans with the petition number, SPLN-22-o9-000062. 2. Please provide an exhibit for all irregularly shaped lots for Staff s review of applicable setbacks and lot widths, pursuant to Code section 78-46(f), and driveway locations. 3. On all Development plans, please revise the viewports so they An not impact key site plan elements such as, the entry and the associated recreation tracts. 4. Please provide the width of the open space between Lots 13, 14, 15 and 16. 5. Staff does not support the sidewalk as shown in the rear of lots 98-101. Please revise accordingly. 6. idth of the Open Space between Lots 97 and 10o at the Please provide the w narrowest point. �. Please provide a color and materials board as well as color elevations for the mailbox center for Staffs review and comment pursuant to Code section 78-46(e). Avenir Pod 18 Site Plan SPLN-22-09-000062 Comment Memo November 4, 2022 8. Please advise of the proposed surface material at the mailbox center and identify on all applicable plan sheets, pursuant to Code section 78-46(f). 9. On sheet or-1, please provide rear elevations of the proposed mailbox center or label if the rear elevations will match the front, pursuant to Code section 78-46(e). 10. On sheet SP-/, please label the side elevation of the mailbox center as the right/left elevations. 11. Please provide details of the proposed vehicular gates for Staff to review and comment. 12. At the main entrance there does not appear to be a call box or other means to allow guest access through the gates. Please advise how access will be controlled and provide a detail of any type of proposed access control feature. 13. Please dimension the stacking distance from the edge of pavement to the call box at the entrance to the subject site per Code Section 78-490(b). (Planning and Zoning, Traffic, Engineering) 14. Please provide a dimension for the width of the open spaces and increase the widths on both sides of the main entrance pursuant to Code section 78-46(f). 15. At the main entrance driveway, please provide an 8-foot-wide sidewalk on both sides of the entry that will connect to the 12400t-wide multi -use path along the south side of Panther National Boulevard. 16.Onthe Landscape Plan, there is line work outside the boundary of the subject site associated with development projects not currently approved. Please remove this line work. 17. On Sheet SP-3, Staff recommends that the Applicant reconfigure the shape of Lot 64 to provide a larger open space tract and a more regular shaped lot. 18.On Sheet SP-3 and LP-6Staff recommends that the Applicant provide a future pedestrian connection to Parcel H (Agriculture) through the open space tract. 19. The approved 56-foot Right-of-way cross section indicates afive-foot sidewalk on both sides of the roadway. The residential street from lots 15-2o does not provide a sidewalk on both sides. Please provide a sidewalk on both sides of the road. 2o.On sheet LP-g, Staff strongly encourages the Applicant add street trees and reduce the amount of sod along the east side of the residential street pursuant to Code section 78-314(d). Page 2 of 7 Avenir Pod 18 Site Plan SPLN-22-o9-000062 Comment Memo November 4, 2022 21. On Sheet SP-2 and LP-io, please add a sidewalk connection adjacent to the crosswalk north of the resident egress/emergency access from Panther National Boulevard, 22.O1.1 Sheet SP-2 and LP-1o5 please indicate the stacking distance for the resident egress gate. 23.On Sheet C-19, Section C-C please change the side setback to 7.5 feet to be consistent with the proposed property development regulations. 24.On Sheets C-19 and LP-11, please provide a cross section between the road and Parcel H (Agriculture) at the narrowest point. (Engineering, Forestry) 25. Staff recommends the Site, Landscape and Civil plans show a 3-foot to 5-foot-wide retaining wall easement in the rear of all lots that require a retaining wall for Homeowner Owners Association (HOA) maintenance access. 26. Please identify the location of all the master irrigation system and ground mounted equipment (i.e., transformers) and provide screening pursuant to Code section 78- 195• 27. Staff recommends the Applicant incorporate an additional street tree species to provide diversity. 28.On Sheet C-2o, the Panther National Boulevard Entrance Detail is inconsistent with the Site Plan and Landscape Plan. Please update plans for consistency. 29. Please incorporate to provide a more curvilinear design or provide traffic calming measures on the section of the street from Lots 15 — 20. 30. Please provide a curvilinear street design from Lot 52 -Lot 63 to provide for natural traffic calming. 31. Staff strongly encourages the Applicant provide pedestrian bollards within the open space areas adjacent to residential lots instead of standard light poles. See also comment #57. 32. Staff strongly encourages the Applicant to provide on -street guest parking throughout the project. 339 It appears that there is additional linework shown on Lot 62. Please address. 34.On Sheet SP-3, it appears that the six -foot -tall post -and -panel concrete wall extends south of where the 446ot-tall aluminum fence ties in. Please advise how maintenance will be provided to the 8-foot-wide landscape buffer. (Forestry) 35• Please identify, Lots 61- 64 as having enhanced rear elevation. In addition to an enhanced rear elevation, please identify lot 64 as having enhanced side elevation. Page 3 of 7 Avenir Pod 18 Site Plan SPLN-22-09-O00062 Comment Memo November 4, 2022 Forestry 36.On Sheet LP-3 and any other affected sheets, please reposition a1118-foot-tall Live Oak trees so that the mature growth of the tree does not impact the adjacent lot side and/or rear yards. For example, Lots 77, 8o, 82, 83, and 84 all have Oak trees that immediately impact the adjacent lots. 37. Please provide a hedge along the rear yard of lot 93, as provided on the side of lot 92. 38.On Sheet LP-6, please redesign the open space area that is adjacent to Parcel H that the 1240ot-wide Utility Easement does not encumber the entire landscape buffer. 39. On Sheets SP-2, LP-9 and LP-1o, please add a fence and hedge along the retaining wall within the open space area between Lots 9 and 10 due to the proximity of the sidewalk and the grade change at the retaining wall. 40. On sheet LP -11 please update the cross-section lcey map for the area indicated as "existing farm" to be identified as Parcel H, Agriculture. Engineering Department 41. Please be advised prior to the issuance of the first Certificate of Occupancy related to this project, the Panther National Boulevard from the roundabout at Avenir Drive, shall connect to Northlake Boulevard and shall be completed and opened for public access 42. Please provide a typical detail for the parking stalls. 43• Please provide typical lot drainage details for the following areas: a. Lots adjacent to the conservation area b. Lots adjacent to the lake c. Lots adjacent to Parcel H, Agriculture d. Lots adjacent to Panther National Boulevard e. Lots adjacent to common areas 44• Please provide a drainage plan for all common areas showing swales and inlets. 45.On Sheets LP-11 and C-19, the details referencing the retaining wall are inconsistent. The wall is indicated off the property line on the civil drawings and the landscaping plans have the wall shown on the property line. Please make the plans consistent with the footer and fence shown correctly. Page 4 of 7 Avenir Pod 18 Site Plan SPLN-22-o9-000062 Comment Memo November 4, 2022 GIS Division 46. The amount of Open Space plan could not be verified. The CAD files shall contain drawings of the following: Property boundary, Impervious Areas, Pervious Areas, Total Open Space, Open space for landscape points, and Sod Areas. Each layer shall be clearly labeled using the drawing names outlined above. If a different naming convention is utilized, the Applicant shall provide a list that describes what layers pertain to each drawing. The drawings shall be defined as closed polygons and accurately reflect scale, area, and include text and annotation clearly labeled and legible. 47. The Applicant shall submit a request for a residential Address Plan. The Addressing Committee will not approve any request until the Site Plan for the associated petition has received approval. Please submit a letter requesting the development and review of an Addressing Plan along with a site plan and check in the amount of $200.00. During this review, the Addressing Committee shall assign all addresses, street names, and any additional items requested. 48.If the project is to be named, then the Applicant shall submit a request for a subdivision name approval. The Addressing Committee will not approve any request until the site plan for the associated petition has received approval. There is a $too fee to process the desired name. Fire -Rescue Department 49•Please be advised that all roadways shall meet the R2o' turning radius requirements. The Auto -turn analysis indicates that there are eight (8) areas where the fire truck will have to drive over curbs. Please consider widening the roadway or providing mountable curbs. In addition, please provide the auto -turn analysis in color for better legibility. 50. Please be advised, that both the primary and secondary electronic gates will be required to have Knox Gate Switches and C1ick2Enter Devices installed. (Police) 51. All roads shall be constructed and maintained with at least 20 feet in clear width and be constructed with the required all-weather driving surface to support emergency apparatus, prior to construction of any structures. 52. Fully functional fire hydrants with required fire flow, are required prior to, during, and after construction. Any fire hydrants not yet in service shall be indicated as such. 53• Fire hydrants in residential areas shall be connected to at least an 8-inch water main and shall not exceed 50o feet spacing per City Code �8-543• 54• Please be advised that landscape installations are not to interfere with access to any fire hydrants. Page 5 of 7 Avenir Pod 18 Site Plan SPLN-22-o9-000062 Comment Memo November 4, 2022 55.On Sheet SP-3 and LP-5, please provide a minimum 10-foot-wide fire access easement within the open space between Lots 34 and 35. (Fire Rescue, Forestry) 56.On sheet or-3 and LP- 6, please provide a minimum 10-foot-wide wide fire access easement between Lot 52 and Lot 6o for access to the fire break/ Conservation Area. (Fire Rescue, Forestry) 57. On Sheets SP-2 and LP-9, please provide a minimum 10-foot-wide fire break access easement through the open space area between Lots 19 and Lots 20. The access easement should allow the ability to get from the road through the retaining wall to the grade of the 10-foot-wide fire break. (Forestry) 58.On Sheets SP-2 and LP-1o, please show a 2o-foot-wide unencumbered fire break access from Panther National Boulevard to the end of the 1o400t-wide fire break area located northeast of Lot 7 as indicated on the Civil Plan, Sheet FA2. 59.On Sheets C-19 and LP-11, please provide a typical cross-section of the transition between the interior road through the open space areas that allows access to the io-foot fire break through the retaining wall with a grade that is no more than 3%. Please be aware that these accesses are also for maintenance of landscaping and the retaining wall. (Forestry, Engineering) Police Department 6o.The mail kiosks shall be illuminated to increase natural surveillance for residents. 61. All playgrounds equipped with fencing shall have auto -close hinge gates installed. 62. The Police Department strongly .suggests that the Applicant provides pedestrian scale lighting to activity generating common areas. The additional of lighting can afford residents the opportunity to use the space during evening hours, enhancing natural surveillance. (Planning and Zoning) 63. Fencing and gate design should be fully encompassing, designed to deter climbing, and equipped with a form of access control. Building Division 64. Two sets of signed and sealed plans required with permit submittals. 65. All product approvals shall be included with permit submittals. 66. Staff suggests the Applicant meets with the Building Division prior to Building permit submittal. Page 6 of 7 Avenir Pod 18 Site Plan SPLN-22-o9-000062 Comment Memo November 4, 2022 Seacoast Utility Authority (SUA) 67. Please advise if future homes will all be less than 5,000 square feet. If so, please note this limitation on the plans. 68.The Applicant will need to add a manual flushing station to the northwest of Lot 81. Please coordinate with SUA on the desired location. Pursuant to Code section 78-195, the flushing station will need to be screened. (Forestry) 69. The Applicant must show driveways to all lots. Many of the lots have water services that appear to be in the driveway and should be shifted to avoid driveways. All water services should be perpendicular to the water main. �o. Please relocate the water main within the intersection south of lots 22 and 23 for better maintenance. Once the driveway locations are show SUA can determine the best configuration. Please coordinate with driveway locations, landscaping, and photometric poles accordingly and propose a new configuration or coordinate with SUA. 71. The water main serving the `eye' to lots 32-34 needs to be reconfigured. Once the driveways are shown SUA can provide input. This may affect landscaping. The Medjool Date palm is too close to the sewer main at this location. 72. The trees at the north side of the entrance off Panther National Boulevard are too close to the proposed water main. Please show the water main clearly and move the location of the trees to meet SUA minimum setback requirements. Pinder-Troutman —Traffic 73. Please show the left turn lane storage length on Panther National Boulevard at the project driveway. (Traffic, Engineering) The Applicant shall provide a written response to all comments, indicating how each comment has been addressed and/or acknowledgement of each comment. Compliance with expedite subsequent review. It is suggested that the Ann licant clearly identify all changes to the plans by either "clouding", or otherwise highlighting, the location of all changes to further expedite the review. City staff reserves the right to make additional comments throughout the review process. Page 7 of 7