MEMORANDUM
TO: Officer Julius Barone, Police
Todd Engle, P.E., Engineering
Scott Fetterman, Deputy Chief
Bruce Gregg, Seacoast Utility Authority
Mark Hendrickson, Forestry
Scott Danielski, Chief Building Inspector
Via PBG Email:
David Reyes, Operations Director
Bahareh Wolfs, Development Compliance
Jack Doughney, Deputy City Manager
Charlotte Presensky, Public Facilities Director
Ray Ellis, City Clerk
Aries Page, GIS
Mike Morrow, Operations Director
Max Lohman, City Attorney
Angela Wong, Operations
Natalie M. Crowley, P & Z Director
Via Email:
Alan Boaz, Florida Power and Light
Rick Kania, Waste Management
Layle Knox, North Palm Beach Improvement District
Robert Lozano, Florida Power and Light
Booker T. Washington, Florida Power and Light
DATE: July 28, 2011
FROM: Richard Marrero, Senior Planner
rmarrerogpbgfl. com
561- 799 -4219 (direct line)
561- 799 -4281 (fax)
SUBJECT: Northcorp Corporate Center at the Gardens (f /k/a Wackenhut Center) — Requesting
approval of a PUD amendment to allow for the following modifications: (1) Increase
the number of parking spaces; (2) modify landscaping on -site; (3) Modify the existing
wall and ground signage. Northcorp Corporate Center at the Gardens is a 7.6 acre site
located at the intersection of RCA Boulevard and Northcorp Parkway, south of the
Marriott hotel.
I
Petition No. PUDA- 11 -07- 000032
MEETING DATE:
A Development Review Committee meeting will be held on Tuesday, August 9, 2011 at 11:00 a.m.
in the City Council Chambers to review the following development applications:
PALM BEACH GARDENS PETITION NUMBER: PUDA- 11 -07- 000032
Requesting approval of a PUD amendment to allow the following modifications: (1) Increase
the number of parking spaces; (2) modify landscaping on -site; (3) Modify the existing wall and
ground signage. Northcorp Corporate Center at the Gardens is a 7.6 acre site located at the
intersection of RCA Boulevard and Northcorp Parkway, south of the Marriott hotel.
** This request has been approved to qualify for the City's Targeted Expedited Permitting
Program (TEPP). Therefore, the City is required to provide review comments to the applicant
within 5 business days from transmittal of the plans. The petition has been submitted in order to
accommodate Oxford International, which is a firm specializing in information technology and
engineering. Oxford International will be leasing approximately 19,000 SF within the building.
**
Please provide your comments on the subject DRC petitions to the Planning & Zoning Department no
later than 5:00 p.m. on Thursday, August 4, 2011. Your comments must be forwarded to our office
(Attn: Richard Marrero (rmarrero @pbgfl.com) in order to provide written comments to the applicant
in accordance with the timeframes established in the City's Land Development Regulations. Should
you have no comments, please indicate so next to your name on the second page and forward this
memo to our office. Additional copies of the application are available in the Planning & Zoning
Department. Thank you for your attention to this matter.
The applicant will be in attendance at this meeting. Our office requests your participation in the
review of this project. Please review this request and attend the meeting if possible. Receiving your
comments prior to the meeting will provide staff with the ability to give proper direction to the
applicant.
Thank you for your ongoing cooperation and assistance. Please contact our office at (561) 799 -4219
should you have any questions or comments.
Officer Julius Barone, Police Department
Todd Engle, P.E., City Engineer
Scott Fetterman, Deputy Chief
Bruce Gregg, Seacoast Utility Authority
Mark Hendrickson, City Forester
Steven Kennedy, Building Official
Jack Doughney, Deputy City Manager
2
Petition No. PUDA- 11 -07- 000032
Charlotte Presensky, Public Facilities Director
David Reyes, Operations Director
R. Max Lohman, City Attorney
Angela Wong, Operations Manager
Alan Boaz, Florida Power and Light
Booker T. Washington, Florida Power & Light
Rick Kania, Waste Management
Layle Knox, North Palm Beach Improvement District
Robert Lozano, Florida Power and Light
Attachment: Complete Project Submittal by the applicant received by the City on July 26, 2011.
cc: Natalie M. Crowley, AICP, Director of Planning and Zoning
Anne Booth, Urban Design Kilday Studios
Corporate Center at the Gardens #r
aka West Park Center Lot 1 Aril 7, 2011 "
Planned Unit Development Amendment R 42�
�• -�-:
Palm Beach Gardens, FL T 42 = - -
S 01
IL
v -r
s s
L NEMM 0
All
r
,�#u s�J'1�4I- -. 7s 'c� ,ra•� B +.., , =^.-}' s.,.
i o _ ' A x..
�f f/ H � .1,:,... �. I F, � �,a:.!aL• +t!p�e.�.n>.� ��- t'- -�n::s '�s •�
�� ,x ' -yr � uAA:iMA:AV YIA:AY7J� IS • • -� � ,. _, � i� r't
t F k �o� .1 • p• p , r !. it. e 1 i r_ l:..lO�u
p A.t 0 0 0
@
Lo. OEO)g
e
F
r
' UUU .:
or-
t
t
:r urban
ki I day
12- . - *9410-t-n %=1 -%I;:
V STUDIOS
PROJECT NARRATIVE
Corporate Center
at the Gardens
(Lot 1, West Park Center,
Of the NorthCorp PCD)
PUD Amendment
July 25, 2011
REQUEST
urban
design
Urban Planning and Design
Landscape Architecture
Communication Graphics
This request is for a PUD Amendment to modify the approved plans for Lot 1 of West
Park Center, formally known as The Wackenhut Center, and hereafter to be known as
the Corporate Center at the Gardens. The proposed amendments include restriping a
portion of the parking lot to create 9' wide parking stalls, re- design, replacement and
relocation of the ground signs, replacement and relocation of the wall signs, the
upgrade of the entrance and foundation landscaping, approval of one waiver, and the
modification and clarification of the status of the previous conditions of approval.
The proposed parking lot modifications and the subsequent increased number of
parking spaces will require approval of a waiver to allow more spaces than allowed by
the Land Development Regulations.
HISTORY /LOCATION
Lot 1 of West Park Center is an approximate 7.6 acre tract located within the NorthCorp
Planned Community District ( Northcorp PCD). The site is more specifically located at
the intersection of RCA Boulevard and NorthCorp Parkway south of the Marriot hotel.
NorthCorp PCD was approved via Ordinance 1, 1990 on January 18, 1990. With the
approval of Ordinance 1, the individual parcels within NorthCorp were simultaneously
approved as Planned Unit Developments (Section 2). Ordinance 1, 1990 also
established development regulations for the individual PUD's which set forth the
requirements for setbacks, height, FAR, open space and uses allowed (Section 4) and
established that the review and approval of subsequent development on the individual
PUD's be by Resolution without public hearing or newspaper notice (Section 5). The
site was developed in accordance with these regulations and continues to meet them
with the proposed modifications in this application.
The site plan approval for the project was granted via Resolution 39, 1995, on March
16, 1995 and subsequently modified September 14t ", 1995 by Resolution 93, 1995 for
modifications to the elevations and landscape plans, October 5t ", 1995 by Resolution
105, 1995 for modifications to Building C and the signage, on January 11, 1996 by
Resolution 11, 1996 to allow covered parking structures, on March 18, 1996 by
Resolution 40, 1996 to amend the signage on Building A, on May 17, 1999 by an
Administrative Amendment (ADMIN- 99 -24) for a modification to the signage, and on
Corporate Center at the Gardens
Project Narrative
July 25, 2011
Page 2
December 5, 2002 by Administrative Amendment (ADMIN- 02 -65) for the Metes and
Bounds subdivision of Lot 1 into three (3) separate lots of record.
LAND USE AND ZONING
The site has a Future Land Use Plan designation of Industrial (1) with a Bioscience
Research Protection Overlay (BRPO), a zoning designation of Planned Community
District (PCD) with an Overlay zoning of Planned Unit Development (PUD) and an
underlying zoning designation of Research and Light Industrial (M -1). All modifications
proposed in this application are consistent with both the Future Land Use Plan and
Zoning designations.
Existing Zoning and Land Use Designations of Adjacent Sites
EXISTING USE
ZONING
FUTURE LAND USE PLAN
SUBJECT PROPERTY:
PCD /PUD /M -1
Industrial /BRPO
TO THE NORTH:
Marriott Hotel
PUD /Commercial
Commercial (C)
TO THE SOUTH:
1 -95 Road Right -of -way
N/A
N/A
Lake Tract (North Corp
PCD /PUD /M -1
Industrial /BRPO
PCD)
TO THE EAST.
Gardens Station
Mixed Use (MXD) /BRPO
MXD /BRPO
RCA Boulevard Center
(North Corp PCD)
PCD /PUD /M -1
Industrial /BRPO
NorthCorp Center
(North Corp PCD
PCD /PUD /M -1
Industrial /BRPO
TO THE WEST:
1 -95 Road Right -of -way
N/A
N/A
Targeted Expedited Permitting Program (TEPP)
This project has been approved to qualify for the Targeted Expedited Permitting
Program. Please see the attached letter from the Business Development Board.
Corporate Center at the Gardens July 25, 2011
Project Narrative Page 3
PROJECT DETAILS
Architectural Style and Special Features
There are no major modifications proposed to the exterior facade of the buildings. As
part of a multi - million dollar upgrade, the property owner is making major modifications
to the interior of Building A to convert the building from occupancy by a single tenant to
allow occupancy by multiple tenants, and to convert the building into Class A office
space. Some minor exterior maintenance and upgrades are being done to the front
entrance as part of the lobby renovations; there will be fresh paint to match the existing
colors, and new energy efficient air conditioning units with roof top screening as part of
the interior improvements. The interior improvements are permitted by code and are not
included in this application.
Landscaping /Buffers
Landscape improvements to the site include the replacement and upgrade of the
mature landscape treatments at the entrance and around the foundations of buildings A
and B. There are also a number of trees being replaced where they have been
damaged or lost through the years. The proposed replacement of the ground signs will
also include new landscape treatments at the base of the signs. Tree replacements
include the use of Spicy Jatropha, Japanese Privet and Purple Trumpet Tree which will
add color and texture to the parking lot and foundation of the buildings. The entrance
landscaping will also include splashes of color and the replacement of older shrubs and
ground covers. An extra loading space on the site is being removed and converted to
open space.
Signage
Ground Signs — The existing single tenant ground signs are proposed to be removed
and replaced with freshly designed signs that will allow display of multiple tenants. The
proposed sign design includes an internally illuminated central core in medium blue,
with an overlay in off white that will contain the tenant names in dark bronze. The sign
has been designed to incorporate characteristics similar to the NorthCorp PCD Master
Signage program. The code allows for the installation of three ground signs based on
the property having over 1700 linear feet of right -of -way frontage. Currently there are
two signs located at the northern and central entrances on NorthCorp Parkway, and one
sign along 1 -95. This application proposes to replace the two existing signs at the north
and central entrances, and remove the sign along 1 -95 to allow for the future installation
of a new sign at the southern entrance. The two signs at the northern and central
entrances are proposed to be 10' x 15' and the sign at the southern entrance which
maintains the same design, is proportionately smaller at 8' x 12'.
Wall Signs — Condition 17 of Resolution 39, 1995, allows for three signs on the
building, two facing 1 -95 and one over the canopy at the front entrance. With this
application we are requesting a modification of the sign plan and the condition, to allow
Corporate Center at the Gardens July 25, 2011
Project Narrative Page 4
for three signs facing 1 -95 and removing the sign over the canopy at the entrance. We
are also requesting that ground floor tenants be allowed to have signs, as permitted by
the code. The proximity of this building to 1 -95, and the tree canopy that exists around
the building make the visibility from 1 -95 critical for the effectiveness of the signage for
the tenants. Now that the building will have multiple tenants, it will be important to
identify major tenants as well as the building name. The sign plan includes limitations
on the size, locations and color pallet of the signs.
Directional Signs — With the relocation of the building sign from the front of the
building, it has been determined that directional signage is necessary to assist visitors
to the site to identify each building. The signs will be 4' x 5'x 8" with an off white
background and stem mounted bronze letters, strategically located to provide direction
for each building.
Pedestrian Connectivity
The site currently provides pedestrian connections to the adjacent properties and the
PCD sidewalk system. No changes are being proposed to the sidewalk system as a
result of this request.
Traffic
There are no traffic operational improvements being proposed as a result of this
request.
Access
The site has three (3) existing ingress and egress points, all located off the adjacent
NorthCorp Parkway. There are no modifications being proposed as a result of this
request.
Lighting
There are no modifications to the existing site lighting being proposed as a result of this
request.
Utilities /Drainage
There are no modifications to the site's existing configuration of utilities on the site. All
previous agreements for services will remain.
Parking
Required parking is calculated based on the code requirement of 1 space per 300
square feet of Professional Office space. Based on 121,229 feet of office space, the
total required parking for the site is 405 spaces. The previously approved site plan
provided 451 spaces. Existing parking includes 9 ' and 10' wide spaces, a parking
garage under Building A, and covered parking spaces at each building.
Corporate Center at the Gardens July 25, 2011
Project Narrative Page 5
To answer the demand for additional parking required by a Class A building, the
applicant is requesting to modify several parking bays by restriping the existing
pavement area and converting 10' wide parking spaces to 9' wide parking spaces. A
waiver will be required to address the code restriction of not allowing parking to exceed
10% of the required parking. A detailed explanation and justification of the waiver
request is included in this narrative.
Handicap parking has been provided adjacent to each building. Nine spaces are
required and nine spaces have been provided. Three loading spaces are required and
three spaces have been provided, one at each building. One extra existing loading
space is proposed to be removed and converted to open space.
Parking space width
Section 76 -344 allows the City Council to approve a reduction in the width of parking
spaces provided a corresponding increase in open space is provided.
There are 10 existing 9' wide spaces located under cover adjacent to Building C and 27
existing 9' spaces in the garage. The applicant is requesting that an additional 255
parking spaces be restriped and reduced to a width of 9' feet. There will be a net
increase of 32 spaces overall with the breakdown as follows: 292 - 9' spaces, 182 - 10'
spaces and 9 - 12' spaces providing for a total of 483 spaces. .
The criteria for approval for a reduction in the width of parking spaces requires
additional open space be provided at a ratio of 1.5 square feet for each square foot of
paved parking area that is reduced. The following formula demonstrates that the site
exceeds the current code requirement for open space and meets the criteria for
approval.
• There will be a total of 292 — 9' parking spaces.
• The area of the reduced pavement area is 5400 square feet (18.5' x 1' = 18.5
sf /space x 292 spaces).
• At a ratio of 1.5, we are required to provide 8103 additional square feet of open
space (5400 sf x 1.5).
• The 15% open space requirement is 1.15 acres (50,305.06 sf). The open space
provided on this site is 30 %, or 2.302 acres (100,275.12 sf).
• The site provides 1.152 acres (50,181.12 sf) more open space than is required by
code which exceeds the requirement for additional open space.
Land Develoament Reaulations Analvsis
SITE ANALYSIS:
NorthCorp — West Park Center, Lot 1
Comparison
Required by
in the Approved
n
Proposed/
Compliant
Waiver
PBG LDR
p PUD
Existing (e)
Requested
Open Space
15% min.
28%
30% (e)
Yes
(PUD)
Corporate Center at the Gardens
Project Narrative
July 25, 2011
Page 6
SITE ANALYSIS:
NorthCorp — West Park Center, Lot 1
Comparison
Required by
n Approved
n the
i the
Proposed/
Comp
Compliant
Waiver
PBG LDR
p
Existing (e)
Requested
Maximum Height
12- stories
54 -feet (e)
Yes
Limit
50 -feet
Setbacks
Front (NorthCorp
25
Bldg A -35
Bldg A- 125.2'
Yes
Parkwa y)
Bldg B - 25
Bldg B -60.3
Bld C - 25
Bld C — 27.4'
15
15
16' min (e)
Yes
Side (north /south)
20
20
64' min (e)
Yes
Rear (west - I -95)
Parking
1 space /300 sf of
Number
office space
451
483
Yes
Required
(405)
Spaces in
10% permitted
excess of
(41 additional
46
78
No
Yes
required
spaces)
368 sps at
182 sps at 10'
Yes
Stall Dimensions
10' x 18.5'
10'
292 sps at 9'
37 sps at 9'
Loading Spaces
3
4 (e)
3 (e)
Yes
Ground Signs
3 allowed. (1 for
Number
first 300 If of
3
3 (e)
Yes
Permitted
ROW and 1 for
each additional
700 If of ROW
Corporate Center at the Gardens
Project Narrative
July 25, 2011
Page 7
SITE ANALYSIS:
NorthCorp — West Park Center, Lot 1
Required by
Approved
Proposed/
Waiver
Comparison
PBG L DR
i the
n
n the
Existing (e)
Comp
Compliant
Requested
p
15 feet -from
15 feet from
15' from ROW
ROW line
ROW
line
Yes
360 +' from
61.9' from
Setbacks
50 feet -from
property
property line
property line
line
min.
Directional Sign
12 allowed
0
1
Yes
(1/10,000 sf)
Wall Signs
One (1) for parcel
with at least 100 If
2
3
of ROW; A
building with
frontage on I -95
may have a sign
Condition
facing I -95 in
Modification
addition to its sign
facing its primary
Building ID
street. The sign
Signs (Principal)
facing I -95 may
be located above
Sign for building and
the second floor
tenant identification
purposes. One (1)
90 sf c0 area
copy
n/a
90 sf ea
Yes
Face per sign
36 -inch letter
36" letters
36" letters
Yes
height
Max.
Cannot exceed
n/a
NMT 70% of
Yes
more than 70% of
surface
immediate
vertical /horizontal
surface area to
which attached
Ground Floor
NMT 5% of
n/a
NMT 5% or
Yes
Tenant Signs
elevation of
NTE 70 sf
One (1) Face per sign
tenant space NTE
and uniform type,
70 sf
color, material, shape
and style
Corporate Center at the Gardens
Project Narrative
July 25, 2011
Page 8
SITE ANALYSIS:
NorthCorp — West Park Center, Lot 1
Required by
Approved
Proposed/
Waiver
Comparison
PBG LDR
in the
n
Existing (e)
Compliant
Requested
p PUD
One (1) per
1 /tenant
1 /tenant
Yes
tenant w /over
5,000 gross
leasable sf
NMT 24" letters
24" letters
24" letters
Yes
Face ROW or
Over the
Relocate to I-
Yes
Condition
primary entrance
canopy
95 side
Modification
and be located
below 2nd floor
WAIVER
One of the general purposes and intentions of the Planned unit development overlay
district is to "establish and encourage efficient and creative development or re-
development of property, to provide maximum opportunity for application of innovative
concepts of development in the creation of aesthetically pleasing living, shopping and
working environments on properties of adequate size shape and location ... and to
ensure that development occurs according to limitations of use, design, density,
coverage, and planning as stipulated in an approved development plan ". As a result of
these concepts, the PUD Overlay District was created as a Flexible zoning district that
is intended to allow for deviations from the standard Land Development Regulations.
These deviations are accommodated through the Waiver approval process. The
granting of waivers allows innovative, and creative design concepts to be realized that
will be a benefit to the city.
The renovation of this property will provide the City with an updated and upgraded office
development which currently is vacant. The property owner is committed to making the
building an attractive Class A facility. However, one of the primary considerations of
potential tenants looking at relocating to this site is the adequacy of parking. To
address this concern, the proposed plan modifies the existing parking lot to re- stripe the
parking spaces allowing an efficient maximization of parking without creating any
additional pavement. The proposed design minimizes the impact to the landscape
islands and creates additional open space as well.
The applicant is therefore requesting a waiver from Section 78 -345, to allow an increase
in the total number of parking spaces greater than 10% of the required parking.
Section 78 -345 provides the opportunity to exceed the required number of parking
spaces up to a maximum of 10% over the required number of spaces. The previously
approved site plan exceeded the 10% threshold by 5 spaces. The proposed site plan
will exceed the 10% threshold by 37 spaces.
Corporate Center at the Gardens
Project Narrative
July 25, 2011
Page 9
The criteria for reducing the width of parking spaces to 9' requires additional open
space be provided. This site provides twice the open space required by the code which
helps to enhance the visual appearance of the site and to minimize any perceived
external visual impacts that may result from the additional parking. In addition, the
applicant will be making improvements to the landscaping to upgrade and enhance the
entrances and the foundation planting.
The proposed waiver meets the criteria established in the Land Development
Regulations under Section 78- 158(1).
We believe that the design of this project is consistent with previously approved projects
in the City, is consistent with the intent and purpose of the Planned Unit Development
Overlay District regulations, and is consistent with comparable development standards
within other office development. For these reasons we feel the requested waiver should
be approved and respectfully request your support.
Li
CITY OF PALM BEACH GARDENS
MEMORANDUM
TO: Anne Booth
DATE: August 5, 2011
L�
FROM: Richard Marrero, Senior Planner � l
SUBJECT: Corporate Center at the Gardens PUD Amendment
CC: Natalie M. Crowley, AICP, Director of Planning & Zoning
Petition PUDA- 11 -07- 000032: Requesting approval of a PUD amendment to
allow for the following modifications: (1) Increase the number of parking
spaces on the site; (2) modify the site and landscape plans; (3) relocate the
approved wall and ground signage for the site; and (4) amend the signage
plan for Building A.
The following comments are based on your project submittal received by the City
on July 26, 2011 and deemed sufficient on July 28, 2011:
Planning & Zoning
Site Plan Comments
Richard Marrero, Senior Planner
The site data table indicates 28 spaces proposed to be located within the
parking garage; however, the existing approved plan indicates 26 spaces
located within the parking garage. Please clarify if there are changes
within the parking garage proposed with this petition. If so, please
provide a site plan using clouding or bubbling to indicate the proposed
modifications.
2. The proposed plan indicates a location for Art In Public Places (AIPP);
however, no art exists in the location on -site. Please revise.
3. The proposed Building Signage Plan indicates four (4) letter colors for flat
wall signs. Please provide color chips or a graphic indicating the
proposed colors. Also, please provide a font type to utilize for all flat/wall
signage.
4. The applicant indicates a logo on the Building Signage Plan. Please
include a note on the Building Signage Plan that allows for corporate
logos.
According to the United States Patent and Trademark Office, the "O" in
Oxford International does not appear to be a registered service mark of
the corporation and is in fact a letter, which is subject to the maximum
36 -inch letter height allowed by City Code.
5. The applicant indicates in the Project Narrative that ground floor tenant
signage is requested with this petition. Is the applicant requesting
approval of ground floor tenant signage for all three (3) buildings on -site
or just Building A? Please clarify.
Due to the size and unique shape of Building A, there is the possibility
that multiple tenants could request ground floor tenant signs. In this
event, the 1St floor of the building could potentially become cluttered with
many tenant signs. Please address this concern with some potential
ideas (i.e. show future signage locations on building elevations, develop
criteria on granting ground floor tenants signage, etc.).
6. The applicant shall request a waiver for the additional sign on the west
elevation facing Interstate 95. As part of the waiver justification, the
elimination of the previously approved signage waiver for the east
elevation will be considered by staff.
Landscape Comments
Mark Hendrickson, City Forester
Staff has reviewed the Land Development Regulations for the above referenced
petition, and provides the following comments:
7. Please update the plant list to include quantities, sizes, and species of
plant material to be removed, relocated or added. Also include the point
value for each plant species. Please supply the total points to determine
the net loss or gain of points with the changes proposed.
8. Please supply the net square footage of open space proposed to be
changed with this petition.
9. There are many missing hedges along the 1 -95 buffer. Is it the intent of
the applicant to replace those plants at this time?
10. Staff anticipates a condition of approval setting a time when the applicant
would have all the landscaping approved with this petition completed for
2
inspection by the City. Staff would like to discuss this at the Development
Review Committee meeting.
GIS Department
Aries Page, GIS Manager
11. The applicant shall correct all documentation for signage to refer to the
correct approved address for the site: 4200 Northcorp Parkway. On the
sheet titled "S -1" it is incorrectly labeled as 4200 Wackenhut Drive in the
title bar. This is the former address for the site.
Building Department
Scott Danielski, building Official
12.The Building Division has reviewed the plans and offers the following
comments:
a. Building permit submittals will be required for the ground and wall
signs proposed with this petition.
b. It is difficult to determine which areas within the parking lot are
being modified with this petition. Please use clouding or shading on
the plans to identify the proposed modifications.
Fire Department
Deputy Chief Scott Fetterman
13. Fire Rescue has no adverse comments or concerns at this time.
Seacoast Utility Authority
Bruce Gregg, Director of Operations
14. We have the following comment on your transmittal dated July 20, 2011
concerning the referenced project. The applicant needs to coordinate the
location of the proposed sign and additional landscaping at the south
entrance with the three (3) existing private water lines and gas main
located in this area.
Engineering Department
Todd Engle, P.E.
Denise Alfonso, P.E.
15.The applicant shall label, dimension and cloud the site plan to clearly
identify all proposed site features including, but not limited to, curb
(noting type and extents), curb radii, parking stalls (standard and
handicap), signs, etc.
3
16. The applicant shall show the minimum required 12' x 35' maneuvering
aprons for the loading zones, as required by Section 78 -362 of the LDR.
17. For the handicap parking stall adjacent to building A (two story side),
please provide the 5 -foot passenger isle required. If a ramp is being
proposed at this location, please, show and label all ADA required
elements on the site plan.
18. Please note that since the exact locations for some of the proposed signs
are not provided due to possible future field utility conflicts, the exact
locations will have to be reviewed and approved by the Engineering
Department prior to the issuance of the Certificate of Completion for the
Miscellaneous Engineering Permit for compliance with the site visibility
triangles. Final locations may have to be adjusted to comply with this
requirement.
Police Department
Officer Julius Baron
19. The Police Department has reviewed the application requesting approval
of a PUD amendment to allow modifications to the approved plans. The
Police Department has concerns with the current lighting and access
control of the underground parking garage. Upon visiting the parking
garage, several areas were not illuminated and visibility was poor. The
Police Department recommends additional light fixtures be added to the
garage area to provide adequate lighting for vehicles and pedestrians.
Additionally, the Police Department requests the applicant submit a
security plan and narrative to address potential security concerns.
Further comments may be made after reviewing the applicant's
response.
DRAFT CONDITIONS OF APPROVAL
1. Approved civil design and architectural drawings, including floor plans,
shall be submitted prior to the issuance of the Certificate of Completion
for the site plan. (Planning & Zoning, GIS)
2. Any future tenant wall signage located on the east elevation of Building A
above the first floor line shall require a waiver. (Planning & Zoning)
3. Prior to the issuance of the Miscellaneous Engineering Permit for the
parking lot improvements, construction plans shall be submitted for review
and approval. (Engineering)
11
As additional information is provided, there may be additional comments or
conditions. The DRAFT conditions of approval may be modified or eliminated
based on subsequent project submittals.
If you have any questions or comments please feel free to contact me anytime at
561- 799 -4219 or email rmarrero @pbgfl.com.