Loading...
HomeMy WebLinkAboutDRC - Northcorp Corporate Center 080911CITY OF PALM BEACH GARDENS MEMORANDUM TO: Officer Julius Barone, Police Todd Engle, P.E., Engineering Scott Fetterman, Deputy Chief Bruce Gregg, Seacoast Utility Authority Mark Hendrickson, Forestry Scott Danielski, Chief Building Inspector Via PBG Email: David Reyes, Operations Director Bahareh Wolfs, Development Compliance Jack Doughney, Deputy City Manager Charlotte Presensky, Public Facilities Director Ray Ellis, City Clerk Aries Page, GIS Mike Morrow, Operations Director Max Lohman, City Attorney Angela Wong, Operations Natalie M. Crowley, P & Z Director Via Email: Alan Boaz, Florida Power and Light Rick Kania, Waste Management Layle Knox, North Palm Beach Improvement District Robert Lozano, Florida Power and Light Booker T. Washington, Florida Power and Light DATE: July 28, 2011 FROM: Richard Marrero, Senior Planner rmarrerogpbgfl. com 561- 799 -4219 (direct line) 561- 799 -4281 (fax) SUBJECT: Northcorp Corporate Center at the Gardens (f /k/a Wackenhut Center) — Requesting approval of a PUD amendment to allow for the following modifications: (1) Increase the number of parking spaces; (2) modify landscaping on -site; (3) Modify the existing wall and ground signage. Northcorp Corporate Center at the Gardens is a 7.6 acre site located at the intersection of RCA Boulevard and Northcorp Parkway, south of the Marriott hotel. I Petition No. PUDA- 11 -07- 000032 MEETING DATE: A Development Review Committee meeting will be held on Tuesday, August 9, 2011 at 11:00 a.m. in the City Council Chambers to review the following development applications: PALM BEACH GARDENS PETITION NUMBER: PUDA- 11 -07- 000032 Requesting approval of a PUD amendment to allow the following modifications: (1) Increase the number of parking spaces; (2) modify landscaping on -site; (3) Modify the existing wall and ground signage. Northcorp Corporate Center at the Gardens is a 7.6 acre site located at the intersection of RCA Boulevard and Northcorp Parkway, south of the Marriott hotel. ** This request has been approved to qualify for the City's Targeted Expedited Permitting Program (TEPP). Therefore, the City is required to provide review comments to the applicant within 5 business days from transmittal of the plans. The petition has been submitted in order to accommodate Oxford International, which is a firm specializing in information technology and engineering. Oxford International will be leasing approximately 19,000 SF within the building. ** Please provide your comments on the subject DRC petitions to the Planning & Zoning Department no later than 5:00 p.m. on Thursday, August 4, 2011. Your comments must be forwarded to our office (Attn: Richard Marrero (rmarrero @pbgfl.com) in order to provide written comments to the applicant in accordance with the timeframes established in the City's Land Development Regulations. Should you have no comments, please indicate so next to your name on the second page and forward this memo to our office. Additional copies of the application are available in the Planning & Zoning Department. Thank you for your attention to this matter. The applicant will be in attendance at this meeting. Our office requests your participation in the review of this project. Please review this request and attend the meeting if possible. Receiving your comments prior to the meeting will provide staff with the ability to give proper direction to the applicant. Thank you for your ongoing cooperation and assistance. Please contact our office at (561) 799 -4219 should you have any questions or comments. Officer Julius Barone, Police Department Todd Engle, P.E., City Engineer Scott Fetterman, Deputy Chief Bruce Gregg, Seacoast Utility Authority Mark Hendrickson, City Forester Steven Kennedy, Building Official Jack Doughney, Deputy City Manager 2 Petition No. PUDA- 11 -07- 000032 Charlotte Presensky, Public Facilities Director David Reyes, Operations Director R. Max Lohman, City Attorney Angela Wong, Operations Manager Alan Boaz, Florida Power and Light Booker T. Washington, Florida Power & Light Rick Kania, Waste Management Layle Knox, North Palm Beach Improvement District Robert Lozano, Florida Power and Light Attachment: Complete Project Submittal by the applicant received by the City on July 26, 2011. cc: Natalie M. Crowley, AICP, Director of Planning and Zoning Anne Booth, Urban Design Kilday Studios Corporate Center at the Gardens #r aka West Park Center Lot 1 Aril 7, 2011 " Planned Unit Development Amendment R 42� �• -�-: Palm Beach Gardens, FL T 42 = - - S 01 IL v -r s s L NEMM 0 All r ,�#u s�J'1�4I- -. 7s 'c� ,ra•� B +.., , =^.-}' s.,. i o _ ' A x.. �f f/ H � .1,:,... �. I F, � �,a:.!aL• +t!p�e.�.n>.� ��- t'- -�n::s '�s •� �� ,x ' -yr � uAA:iMA:AV YIA:AY7J� IS • • -� � ,. _, � i� r't t F k �o� .1 • p• p , r !. it. e 1 i r_ l:..lO�u p A.t 0 0 0 @ Lo. OEO)g e F r ' UUU .: or- t t :r urban ki I day 12- . - *9410-t-n %=1 -%I;: V STUDIOS PROJECT NARRATIVE Corporate Center at the Gardens (Lot 1, West Park Center, Of the NorthCorp PCD) PUD Amendment July 25, 2011 REQUEST urban design Urban Planning and Design Landscape Architecture Communication Graphics This request is for a PUD Amendment to modify the approved plans for Lot 1 of West Park Center, formally known as The Wackenhut Center, and hereafter to be known as the Corporate Center at the Gardens. The proposed amendments include restriping a portion of the parking lot to create 9' wide parking stalls, re- design, replacement and relocation of the ground signs, replacement and relocation of the wall signs, the upgrade of the entrance and foundation landscaping, approval of one waiver, and the modification and clarification of the status of the previous conditions of approval. The proposed parking lot modifications and the subsequent increased number of parking spaces will require approval of a waiver to allow more spaces than allowed by the Land Development Regulations. HISTORY /LOCATION Lot 1 of West Park Center is an approximate 7.6 acre tract located within the NorthCorp Planned Community District ( Northcorp PCD). The site is more specifically located at the intersection of RCA Boulevard and NorthCorp Parkway south of the Marriot hotel. NorthCorp PCD was approved via Ordinance 1, 1990 on January 18, 1990. With the approval of Ordinance 1, the individual parcels within NorthCorp were simultaneously approved as Planned Unit Developments (Section 2). Ordinance 1, 1990 also established development regulations for the individual PUD's which set forth the requirements for setbacks, height, FAR, open space and uses allowed (Section 4) and established that the review and approval of subsequent development on the individual PUD's be by Resolution without public hearing or newspaper notice (Section 5). The site was developed in accordance with these regulations and continues to meet them with the proposed modifications in this application. The site plan approval for the project was granted via Resolution 39, 1995, on March 16, 1995 and subsequently modified September 14t ", 1995 by Resolution 93, 1995 for modifications to the elevations and landscape plans, October 5t ", 1995 by Resolution 105, 1995 for modifications to Building C and the signage, on January 11, 1996 by Resolution 11, 1996 to allow covered parking structures, on March 18, 1996 by Resolution 40, 1996 to amend the signage on Building A, on May 17, 1999 by an Administrative Amendment (ADMIN- 99 -24) for a modification to the signage, and on Corporate Center at the Gardens Project Narrative July 25, 2011 Page 2 December 5, 2002 by Administrative Amendment (ADMIN- 02 -65) for the Metes and Bounds subdivision of Lot 1 into three (3) separate lots of record. LAND USE AND ZONING The site has a Future Land Use Plan designation of Industrial (1) with a Bioscience Research Protection Overlay (BRPO), a zoning designation of Planned Community District (PCD) with an Overlay zoning of Planned Unit Development (PUD) and an underlying zoning designation of Research and Light Industrial (M -1). All modifications proposed in this application are consistent with both the Future Land Use Plan and Zoning designations. Existing Zoning and Land Use Designations of Adjacent Sites EXISTING USE ZONING FUTURE LAND USE PLAN SUBJECT PROPERTY: PCD /PUD /M -1 Industrial /BRPO TO THE NORTH: Marriott Hotel PUD /Commercial Commercial (C) TO THE SOUTH: 1 -95 Road Right -of -way N/A N/A Lake Tract (North Corp PCD /PUD /M -1 Industrial /BRPO PCD) TO THE EAST. Gardens Station Mixed Use (MXD) /BRPO MXD /BRPO RCA Boulevard Center (North Corp PCD) PCD /PUD /M -1 Industrial /BRPO NorthCorp Center (North Corp PCD PCD /PUD /M -1 Industrial /BRPO TO THE WEST: 1 -95 Road Right -of -way N/A N/A Targeted Expedited Permitting Program (TEPP) This project has been approved to qualify for the Targeted Expedited Permitting Program. Please see the attached letter from the Business Development Board. Corporate Center at the Gardens July 25, 2011 Project Narrative Page 3 PROJECT DETAILS Architectural Style and Special Features There are no major modifications proposed to the exterior facade of the buildings. As part of a multi - million dollar upgrade, the property owner is making major modifications to the interior of Building A to convert the building from occupancy by a single tenant to allow occupancy by multiple tenants, and to convert the building into Class A office space. Some minor exterior maintenance and upgrades are being done to the front entrance as part of the lobby renovations; there will be fresh paint to match the existing colors, and new energy efficient air conditioning units with roof top screening as part of the interior improvements. The interior improvements are permitted by code and are not included in this application. Landscaping /Buffers Landscape improvements to the site include the replacement and upgrade of the mature landscape treatments at the entrance and around the foundations of buildings A and B. There are also a number of trees being replaced where they have been damaged or lost through the years. The proposed replacement of the ground signs will also include new landscape treatments at the base of the signs. Tree replacements include the use of Spicy Jatropha, Japanese Privet and Purple Trumpet Tree which will add color and texture to the parking lot and foundation of the buildings. The entrance landscaping will also include splashes of color and the replacement of older shrubs and ground covers. An extra loading space on the site is being removed and converted to open space. Signage Ground Signs — The existing single tenant ground signs are proposed to be removed and replaced with freshly designed signs that will allow display of multiple tenants. The proposed sign design includes an internally illuminated central core in medium blue, with an overlay in off white that will contain the tenant names in dark bronze. The sign has been designed to incorporate characteristics similar to the NorthCorp PCD Master Signage program. The code allows for the installation of three ground signs based on the property having over 1700 linear feet of right -of -way frontage. Currently there are two signs located at the northern and central entrances on NorthCorp Parkway, and one sign along 1 -95. This application proposes to replace the two existing signs at the north and central entrances, and remove the sign along 1 -95 to allow for the future installation of a new sign at the southern entrance. The two signs at the northern and central entrances are proposed to be 10' x 15' and the sign at the southern entrance which maintains the same design, is proportionately smaller at 8' x 12'. Wall Signs — Condition 17 of Resolution 39, 1995, allows for three signs on the building, two facing 1 -95 and one over the canopy at the front entrance. With this application we are requesting a modification of the sign plan and the condition, to allow Corporate Center at the Gardens July 25, 2011 Project Narrative Page 4 for three signs facing 1 -95 and removing the sign over the canopy at the entrance. We are also requesting that ground floor tenants be allowed to have signs, as permitted by the code. The proximity of this building to 1 -95, and the tree canopy that exists around the building make the visibility from 1 -95 critical for the effectiveness of the signage for the tenants. Now that the building will have multiple tenants, it will be important to identify major tenants as well as the building name. The sign plan includes limitations on the size, locations and color pallet of the signs. Directional Signs — With the relocation of the building sign from the front of the building, it has been determined that directional signage is necessary to assist visitors to the site to identify each building. The signs will be 4' x 5'x 8" with an off white background and stem mounted bronze letters, strategically located to provide direction for each building. Pedestrian Connectivity The site currently provides pedestrian connections to the adjacent properties and the PCD sidewalk system. No changes are being proposed to the sidewalk system as a result of this request. Traffic There are no traffic operational improvements being proposed as a result of this request. Access The site has three (3) existing ingress and egress points, all located off the adjacent NorthCorp Parkway. There are no modifications being proposed as a result of this request. Lighting There are no modifications to the existing site lighting being proposed as a result of this request. Utilities /Drainage There are no modifications to the site's existing configuration of utilities on the site. All previous agreements for services will remain. Parking Required parking is calculated based on the code requirement of 1 space per 300 square feet of Professional Office space. Based on 121,229 feet of office space, the total required parking for the site is 405 spaces. The previously approved site plan provided 451 spaces. Existing parking includes 9 ' and 10' wide spaces, a parking garage under Building A, and covered parking spaces at each building. Corporate Center at the Gardens July 25, 2011 Project Narrative Page 5 To answer the demand for additional parking required by a Class A building, the applicant is requesting to modify several parking bays by restriping the existing pavement area and converting 10' wide parking spaces to 9' wide parking spaces. A waiver will be required to address the code restriction of not allowing parking to exceed 10% of the required parking. A detailed explanation and justification of the waiver request is included in this narrative. Handicap parking has been provided adjacent to each building. Nine spaces are required and nine spaces have been provided. Three loading spaces are required and three spaces have been provided, one at each building. One extra existing loading space is proposed to be removed and converted to open space. Parking space width Section 76 -344 allows the City Council to approve a reduction in the width of parking spaces provided a corresponding increase in open space is provided. There are 10 existing 9' wide spaces located under cover adjacent to Building C and 27 existing 9' spaces in the garage. The applicant is requesting that an additional 255 parking spaces be restriped and reduced to a width of 9' feet. There will be a net increase of 32 spaces overall with the breakdown as follows: 292 - 9' spaces, 182 - 10' spaces and 9 - 12' spaces providing for a total of 483 spaces. . The criteria for approval for a reduction in the width of parking spaces requires additional open space be provided at a ratio of 1.5 square feet for each square foot of paved parking area that is reduced. The following formula demonstrates that the site exceeds the current code requirement for open space and meets the criteria for approval. • There will be a total of 292 — 9' parking spaces. • The area of the reduced pavement area is 5400 square feet (18.5' x 1' = 18.5 sf /space x 292 spaces). • At a ratio of 1.5, we are required to provide 8103 additional square feet of open space (5400 sf x 1.5). • The 15% open space requirement is 1.15 acres (50,305.06 sf). The open space provided on this site is 30 %, or 2.302 acres (100,275.12 sf). • The site provides 1.152 acres (50,181.12 sf) more open space than is required by code which exceeds the requirement for additional open space. Land Develoament Reaulations Analvsis SITE ANALYSIS: NorthCorp — West Park Center, Lot 1 Comparison Required by in the Approved n Proposed/ Compliant Waiver PBG LDR p PUD Existing (e) Requested Open Space 15% min. 28% 30% (e) Yes (PUD) Corporate Center at the Gardens Project Narrative July 25, 2011 Page 6 SITE ANALYSIS: NorthCorp — West Park Center, Lot 1 Comparison Required by n Approved n the i the Proposed/ Comp Compliant Waiver PBG LDR p Existing (e) Requested Maximum Height 12- stories 54 -feet (e) Yes Limit 50 -feet Setbacks Front (NorthCorp 25 Bldg A -35 Bldg A- 125.2' Yes Parkwa y) Bldg B - 25 Bldg B -60.3 Bld C - 25 Bld C — 27.4' 15 15 16' min (e) Yes Side (north /south) 20 20 64' min (e) Yes Rear (west - I -95) Parking 1 space /300 sf of Number office space 451 483 Yes Required (405) Spaces in 10% permitted excess of (41 additional 46 78 No Yes required spaces) 368 sps at 182 sps at 10' Yes Stall Dimensions 10' x 18.5' 10' 292 sps at 9' 37 sps at 9' Loading Spaces 3 4 (e) 3 (e) Yes Ground Signs 3 allowed. (1 for Number first 300 If of 3 3 (e) Yes Permitted ROW and 1 for each additional 700 If of ROW Corporate Center at the Gardens Project Narrative July 25, 2011 Page 7 SITE ANALYSIS: NorthCorp — West Park Center, Lot 1 Required by Approved Proposed/ Waiver Comparison PBG L DR i the n n the Existing (e) Comp Compliant Requested p 15 feet -from 15 feet from 15' from ROW ROW line ROW line Yes 360 +' from 61.9' from Setbacks 50 feet -from property property line property line line min. Directional Sign 12 allowed 0 1 Yes (1/10,000 sf) Wall Signs One (1) for parcel with at least 100 If 2 3 of ROW; A building with frontage on I -95 may have a sign Condition facing I -95 in Modification addition to its sign facing its primary Building ID street. The sign Signs (Principal) facing I -95 may be located above Sign for building and the second floor tenant identification purposes. One (1) 90 sf c0 area copy n/a 90 sf ea Yes Face per sign 36 -inch letter 36" letters 36" letters Yes height Max. Cannot exceed n/a NMT 70% of Yes more than 70% of surface immediate vertical /horizontal surface area to which attached Ground Floor NMT 5% of n/a NMT 5% or Yes Tenant Signs elevation of NTE 70 sf One (1) Face per sign tenant space NTE and uniform type, 70 sf color, material, shape and style Corporate Center at the Gardens Project Narrative July 25, 2011 Page 8 SITE ANALYSIS: NorthCorp — West Park Center, Lot 1 Required by Approved Proposed/ Waiver Comparison PBG LDR in the n Existing (e) Compliant Requested p PUD One (1) per 1 /tenant 1 /tenant Yes tenant w /over 5,000 gross leasable sf NMT 24" letters 24" letters 24" letters Yes Face ROW or Over the Relocate to I- Yes Condition primary entrance canopy 95 side Modification and be located below 2nd floor WAIVER One of the general purposes and intentions of the Planned unit development overlay district is to "establish and encourage efficient and creative development or re- development of property, to provide maximum opportunity for application of innovative concepts of development in the creation of aesthetically pleasing living, shopping and working environments on properties of adequate size shape and location ... and to ensure that development occurs according to limitations of use, design, density, coverage, and planning as stipulated in an approved development plan ". As a result of these concepts, the PUD Overlay District was created as a Flexible zoning district that is intended to allow for deviations from the standard Land Development Regulations. These deviations are accommodated through the Waiver approval process. The granting of waivers allows innovative, and creative design concepts to be realized that will be a benefit to the city. The renovation of this property will provide the City with an updated and upgraded office development which currently is vacant. The property owner is committed to making the building an attractive Class A facility. However, one of the primary considerations of potential tenants looking at relocating to this site is the adequacy of parking. To address this concern, the proposed plan modifies the existing parking lot to re- stripe the parking spaces allowing an efficient maximization of parking without creating any additional pavement. The proposed design minimizes the impact to the landscape islands and creates additional open space as well. The applicant is therefore requesting a waiver from Section 78 -345, to allow an increase in the total number of parking spaces greater than 10% of the required parking. Section 78 -345 provides the opportunity to exceed the required number of parking spaces up to a maximum of 10% over the required number of spaces. The previously approved site plan exceeded the 10% threshold by 5 spaces. The proposed site plan will exceed the 10% threshold by 37 spaces. Corporate Center at the Gardens Project Narrative July 25, 2011 Page 9 The criteria for reducing the width of parking spaces to 9' requires additional open space be provided. This site provides twice the open space required by the code which helps to enhance the visual appearance of the site and to minimize any perceived external visual impacts that may result from the additional parking. In addition, the applicant will be making improvements to the landscaping to upgrade and enhance the entrances and the foundation planting. The proposed waiver meets the criteria established in the Land Development Regulations under Section 78- 158(1). We believe that the design of this project is consistent with previously approved projects in the City, is consistent with the intent and purpose of the Planned Unit Development Overlay District regulations, and is consistent with comparable development standards within other office development. For these reasons we feel the requested waiver should be approved and respectfully request your support. Li CITY OF PALM BEACH GARDENS MEMORANDUM TO: Anne Booth DATE: August 5, 2011 L� FROM: Richard Marrero, Senior Planner � l SUBJECT: Corporate Center at the Gardens PUD Amendment CC: Natalie M. Crowley, AICP, Director of Planning & Zoning Petition PUDA- 11 -07- 000032: Requesting approval of a PUD amendment to allow for the following modifications: (1) Increase the number of parking spaces on the site; (2) modify the site and landscape plans; (3) relocate the approved wall and ground signage for the site; and (4) amend the signage plan for Building A. The following comments are based on your project submittal received by the City on July 26, 2011 and deemed sufficient on July 28, 2011: Planning & Zoning Site Plan Comments Richard Marrero, Senior Planner The site data table indicates 28 spaces proposed to be located within the parking garage; however, the existing approved plan indicates 26 spaces located within the parking garage. Please clarify if there are changes within the parking garage proposed with this petition. If so, please provide a site plan using clouding or bubbling to indicate the proposed modifications. 2. The proposed plan indicates a location for Art In Public Places (AIPP); however, no art exists in the location on -site. Please revise. 3. The proposed Building Signage Plan indicates four (4) letter colors for flat wall signs. Please provide color chips or a graphic indicating the proposed colors. Also, please provide a font type to utilize for all flat/wall signage. 4. The applicant indicates a logo on the Building Signage Plan. Please include a note on the Building Signage Plan that allows for corporate logos. According to the United States Patent and Trademark Office, the "O" in Oxford International does not appear to be a registered service mark of the corporation and is in fact a letter, which is subject to the maximum 36 -inch letter height allowed by City Code. 5. The applicant indicates in the Project Narrative that ground floor tenant signage is requested with this petition. Is the applicant requesting approval of ground floor tenant signage for all three (3) buildings on -site or just Building A? Please clarify. Due to the size and unique shape of Building A, there is the possibility that multiple tenants could request ground floor tenant signs. In this event, the 1St floor of the building could potentially become cluttered with many tenant signs. Please address this concern with some potential ideas (i.e. show future signage locations on building elevations, develop criteria on granting ground floor tenants signage, etc.). 6. The applicant shall request a waiver for the additional sign on the west elevation facing Interstate 95. As part of the waiver justification, the elimination of the previously approved signage waiver for the east elevation will be considered by staff. Landscape Comments Mark Hendrickson, City Forester Staff has reviewed the Land Development Regulations for the above referenced petition, and provides the following comments: 7. Please update the plant list to include quantities, sizes, and species of plant material to be removed, relocated or added. Also include the point value for each plant species. Please supply the total points to determine the net loss or gain of points with the changes proposed. 8. Please supply the net square footage of open space proposed to be changed with this petition. 9. There are many missing hedges along the 1 -95 buffer. Is it the intent of the applicant to replace those plants at this time? 10. Staff anticipates a condition of approval setting a time when the applicant would have all the landscaping approved with this petition completed for 2 inspection by the City. Staff would like to discuss this at the Development Review Committee meeting. GIS Department Aries Page, GIS Manager 11. The applicant shall correct all documentation for signage to refer to the correct approved address for the site: 4200 Northcorp Parkway. On the sheet titled "S -1" it is incorrectly labeled as 4200 Wackenhut Drive in the title bar. This is the former address for the site. Building Department Scott Danielski, building Official 12.The Building Division has reviewed the plans and offers the following comments: a. Building permit submittals will be required for the ground and wall signs proposed with this petition. b. It is difficult to determine which areas within the parking lot are being modified with this petition. Please use clouding or shading on the plans to identify the proposed modifications. Fire Department Deputy Chief Scott Fetterman 13. Fire Rescue has no adverse comments or concerns at this time. Seacoast Utility Authority Bruce Gregg, Director of Operations 14. We have the following comment on your transmittal dated July 20, 2011 concerning the referenced project. The applicant needs to coordinate the location of the proposed sign and additional landscaping at the south entrance with the three (3) existing private water lines and gas main located in this area. Engineering Department Todd Engle, P.E. Denise Alfonso, P.E. 15.The applicant shall label, dimension and cloud the site plan to clearly identify all proposed site features including, but not limited to, curb (noting type and extents), curb radii, parking stalls (standard and handicap), signs, etc. 3 16. The applicant shall show the minimum required 12' x 35' maneuvering aprons for the loading zones, as required by Section 78 -362 of the LDR. 17. For the handicap parking stall adjacent to building A (two story side), please provide the 5 -foot passenger isle required. If a ramp is being proposed at this location, please, show and label all ADA required elements on the site plan. 18. Please note that since the exact locations for some of the proposed signs are not provided due to possible future field utility conflicts, the exact locations will have to be reviewed and approved by the Engineering Department prior to the issuance of the Certificate of Completion for the Miscellaneous Engineering Permit for compliance with the site visibility triangles. Final locations may have to be adjusted to comply with this requirement. Police Department Officer Julius Baron 19. The Police Department has reviewed the application requesting approval of a PUD amendment to allow modifications to the approved plans. The Police Department has concerns with the current lighting and access control of the underground parking garage. Upon visiting the parking garage, several areas were not illuminated and visibility was poor. The Police Department recommends additional light fixtures be added to the garage area to provide adequate lighting for vehicles and pedestrians. Additionally, the Police Department requests the applicant submit a security plan and narrative to address potential security concerns. Further comments may be made after reviewing the applicant's response. DRAFT CONDITIONS OF APPROVAL 1. Approved civil design and architectural drawings, including floor plans, shall be submitted prior to the issuance of the Certificate of Completion for the site plan. (Planning & Zoning, GIS) 2. Any future tenant wall signage located on the east elevation of Building A above the first floor line shall require a waiver. (Planning & Zoning) 3. Prior to the issuance of the Miscellaneous Engineering Permit for the parking lot improvements, construction plans shall be submitted for review and approval. (Engineering) 11 As additional information is provided, there may be additional comments or conditions. The DRAFT conditions of approval may be modified or eliminated based on subsequent project submittals. If you have any questions or comments please feel free to contact me anytime at 561- 799 -4219 or email rmarrero @pbgfl.com. 5