Loading...
HomeMy WebLinkAboutAgenda RAB 092302CITY OF PALM BEACH GARDENS • RECREATION ADVISORY BOARD AGENDA September 23, 2002 7:00 PM Council Chambers — City Hall. 1. Call To Order 2. Roll Call 3. Introduction by Sheryl Stewart, Assistant to the City Manager — Linda Monroe, Blue Ribbon Panel Chairperson a. Committee Status Report b. Joint Bond Issue Plan for March 2003 — Request for coordination of the two bond issues and campaigns • 4. Park Enhancements Project a. Consider — Parcel Purchase Along Mac Arthur Blvd. b. Public Forum — Saturday, October 19, 2002 5. District Park Feasibility Study — Glatting Jackson Presentation 6. Parks Division Update 7. Recreation Division Update 8. Comments By The Public 9. Comments By Board Members . 10.Adjourn ow C CONSULTANT SERVICES AUTHORIZATION City of Palm Beach Gardens Park Planning and Design Continuing Services DATE: September 11, 2002 Revised September 16, 2002 Revised September 20, 2002 SERVICE AUTHORIZATION: 2 CITY PROJECT NO.: 2002 -022 GJ PROJECT NO: 17055 PROJECT TITLE: DISTRICT PARK DEVELOPMENT PROGRAM INTRODUCTION The City of Palm Beach Gardens (the "City") entered into an agreement entitled Agreement for Professional Services (the "Agreement ") with Glatting Jackson Kercher Anglin Lopez Rinehart, Inc., ( "Consultant ") on the 4"' day of September, 2002. This Consultant Services Authorization ( "CSA "), when executed, shall be incorporated in and become an integral part of the Agreement. All services provided shall be performed under the terms and conditions described in the Agreement. 1.0 PROJECT DESCRIPTION 1.1 The project is to analyze and verify the development program for the development of the District Park site, as well as associated costs and projected revenue. 1.2 Additional Professionals working on the project as subconsultants to Glatting Jackson include: Architecture: Thaddeus Cohen Architects, P.A. Civil Engineering: Williams Hatfield & Stoner, Inc 2.0 SCOPE OF SERVICES PART I — Site Program and Feasibility Study 2.1 Project Management — In addition to the specific services detailed below, Glatting Jackson shall coordinate our work with the Client's representative and the Client's • project team, monitor the project schedule as it relates to this scope, and provide timely invoicing and reporting of project progress. Glatting Jackson Kercher Anglin Lopez Rinehart, Inc. Pagel of 4 • 2.2 Coordination of the Work of Subconsultants to Glatting Jackson — The Client hereby acknowledges and agrees that Glatting Jackson will assume responsibility for the coordination of work produced by any subconsultants to Glatting Jackson as Project Manager for the project. However, the Client agrees that Glatting Jackson does not bear any liability for the technical accuracy of work prepared by others. All professional firms working on the project shall bear separate responsibility and liability for the work prepared by them. 2.3 Existing Data — The Client will provide Glatting Jackson with the following data for the site: • Aerial photograph • Boundary, topography, site and tree surveys • Architectural and civil plans completed under previous studies of the District Park site • Site plan of the existing Tennis Center • FRDAP grant application prepared for the expansion of the Tennis Center • Space requirements / development program for the Municipal Annex Glatting Jackson will consider all information supplied by the Client as accurate and • correct. Additional work required due to inaccurate, incorrect, or incomplete information supplied by the Client shall be completed as an Additional Service, 2.4 Kick -off Meeting— Glatting Jackson and the Client will attend one (1) meeting to review the existing data, discuss project objectives, review the proposed development program requirements for the Municipal Annex and generally kick off the project. 2.5 Development Program Memorandum— Glatting Jackson shall review the existing interlocal agreement with Palm Beach County regarding the development of the District Park site, the results of the completed needs survey and previous development plans for the site and prepare a memorandum summarizing a development program for the site. In addition, Glatting Jackson shall propose a definition for the Park's service area based on population figures for the City of Palm Beach Gardens. Glatting Jackson shall submit this memorandum to the Client one (1) time for review. Glatting Jackson shall revise the memorandum one(1) time. 2.6 Draft Feasibility Study for the Development of the District Park — Based on the approved development program memorandum, Glatting Jackson shall analyze the development program for the following: • Order of magnitude development costs • Order of magnitude maintenance costs • Potential for development assistance (grants, partnerships, etc) • Potential for revenue generators and expected income stream • Potential for project phasing • Glatting Jackson Kercher Anglin Lopez Rinehart, Inc. Page 2 of 4 L' C] Glatting Jackson shall submit the Draft Feasibility Study to the Client one (1) time for review. Glatting Jackson shall revise the Draft one (1) time. 2.7 Presentations - Glatting Jackson shall present the Development Program and Feasibility Study, and an accompanying PowerPoint slide presentation, at one (1) Recreation Advisory Board meeting and one (1) City Council meeting. If necessary, Glatting Jackson shall revise the Development Program and Feasibility Study one (1) time based on the Client's written review comments. Deliverables — As a result of these tasks, Glatting Jackson shall produce the following: • One (1) digital copy and one (1) hard copy of the Draft Development Program Memorandum • One (1) digital copy and one (1) hard copy of the Draft Feasibility Study Memorandum • Up to two (2) revisions of the Development Program Memo and Feasibility Study Memo • Memoranda summarizing comments received at the Public Workshop • One (1) digital copy and one (1) color copy of a PowerPoint Presentation 3.0 PROJECT SCHEDULE Glatting Jackson is prepared to begin work on the project immediately upon receipt of this executed Letter of Agreement and a retainer if required under Compensation. Glatting Jackson, in consultation with the Client, shall perform its work in such a manner as to comply with an agreed upon schedule. 4.0 ASSIGNED PERSONNEL The following personnel from Glatting Jackson will be assigned to this project, and will have the responsibilities described: David Barth - Principal- In- Charge/Principal 3 Richard Durr - Project Manager /Landscape Architect 4 Mike Sobczak - Landscape Architect 4 Chad Atkins - Landscape Designer 1 Glatting Jackson Kercher Anglin Lopez Rinehart, Inc. Page 3 of 4 I :rm The City of Palm Reach Gardend Prerentr The Rlesander U. Dregfoos school of the flrti 3`d (lnnual "One -of -a Kind" Student Banner Exhibition Friday. September 27th 6:00prn - 8:00pm Performances by the Dance & Mwic Departments flward Ceremony for 'Belt' Rannerl Refreihmenti City flail lobby & Plaza 10500 A. Military Trail. Palm Reach Gardena. fl Bannerr are juried by The City iiall nrt Tarlc force & nrt P(oferAonalr From The Dreyfoor School of the nrtr & The Middle School of the nrtr Palm Beach Gardens Parks g p Programming Workshop Fr g Draft Workshop Agenda October 19, 2002 9:00 am Coffee / Refreshments 9:30 am Introductions / Project Background / Project Objectives / Summary of Previous Findings 10:00 am Session One Breakout Planning Groups: 1. Oaks Park 2. Municipal Pool 3. Lake Catherine Sports Complex, including Lakeside Park and McArthur Blvd. 4. Riverside Community Center 11:30 am Lunch 12:15 pm Session Two Breakout Planning Groups: • 1. Burns Road Community Center 2. Municipal Plaza, Amphitheater and Park 3. District Tennis Center 4. Gardens Park 1:30 pm Break 1:45 pm Session Three Breakout Planning Groups: 1. Plant Drive Park, Teen Center and Dog Park 2. PGA Park 3. Sandhill Crane Access Park and Trail 3:15 pm Next Steps and Wrap up Throughout the Day — Public is welcome to review exhibits and leave behind comment cards CITY OF PALM BEACH GARDENS MEMORANDUM TO: Mayor and Council DATE: September 4, 2002 THROUGH: Ron Ferris, City Manag ..#."- r FROM: Sheryl Stewart, Assistant to the City Manager SUBJECT: Report regarding MacArthur Boulevard To coincide with the City Council meeting Agenda item on the proposed conceptual plan for traffic calming/roadway improvements along MacArthur Boulevard, this is to provide you with the attached three documents: Attachment 1: overview regarding the neighborhood meeting held on August 27, 2002 regarding the proposed conceptual plan. Attachment 2: Mr. Michael Martin's letter dated August 15, 2002. • Attachment 3: Staffs preliminary analysis of the issues that would need to be considered and addressed regarding the impact of the requests outlined in Mr. Martin's letter. Staff identified some of the benefits of developing the northeast comer of Northlake Boulevard and MacArthur Boulevard, as well as the benefits of City ownership. Should you have any questions, please advise. Attachments C • CITY OF PALM BEACH GARDENS . MEMORANDUM Ao ATTACHMENT TO: Mayor and Council DATE: August 30, 2002 THROUGH: Ron Ferris, City Manager FROM: Sheryl Stewart, Assistant to the City Manager SUBJECT: Plan for MacArthur Blvd. On Tuesday evening, August 27, 2002, staff attended a neighborhood meeting held at 340 Riverside Drive. The main purpose of the meeting, facilitated and coordinated by Carol Estrada, was to discuss the proposed conceptual plan for roadway improvements and traffic calming along MacArthur Boulevard. The residents at the meeting expressed the following points regarding the proposed plan that is being presented to City Council on September 4h: • Do away with the stamped concrete around the Banyan tree. • They object to any on -street parking. • • Do not have ingress and egress onto MacArthur Boulevard from the Banyan PUD developments. • Concerned about truck traffic caused by the PUD. • One resident asked for speed bumps, another resident asked for raised brick pavers rather than stamped concrete. The main focus of discussion, as a solution to the traffic concerns, was that the City should purchase the two parcels of property located at the northeast corner of MacArthur Boulevard and Northlake Boulevard, south of the Lake Catherine Sports Complex. The goal would be to concentrate on creating a significant entry feature into Plat 1, as well as to improve the parks and recreation facilities in this area. The main desire of the residents is to maintain the neighborhood character of the area In addition, the suggestion was made that the City also needs to concentrate on entryway features and beautification at Lighthouse Drive and Holly Drive, just west of Alternate Al A over the FEC railroad tracks. Overall, there was consensus that the residents at the meeting did not like the current conceptual plan They would like to see more done, as outlined in the attached letter. • Attachment Michael Martino 320 Balsam Street Palm Beach Gardens, Florida 33410 Phone: 622 -5862 or 845 -3158 8/15/02 Mayor /City Council City of Palm Beach Gardens 10500 North Military Trail Palm Beach Gardens, Florida 33410 Dear Mayor /City Council, ATTACHMENT: 2 I would like to take this opportunity to strongly suggest that the City Council begin immediate and aggressive negotiations to purchase the property located at the northeast corner of Northlake Blvd. and MacArthur Blvd., just south of the Lake Catherine Sports Complex. The benefits to the City and our existing residents in perpetuating, our quality of life by purchase of this property far outweigh any cost considerations or negative conversation that can be imagined Purchase of this property would put the entire eastern length of MacArthur Blvd. from Riverside Dr. to Northlake Blvd. in the public domain. It would enhance opportunities to improve the Lake Catherine Sports Complex, as well as, the possibly of joining with the School Board in an interlocal agreement to create a recreational complex that would satisfy both governments' needs. It may even give more credence to the recreational facilities bond referendum that was reported to being considered by the city. Purchase of this property would significantly improve the traffic problems and concerns in our Plat #1 neighborhood by reducing the commercial densities and intensities intended to be developed on this property. Ingress and egress to this property is very confined and difficult while posing significant traffic problems to Northlake Blvd., MacArthur Blvd., Lighthouse Dr., and the Plat #1 neighborhood in general. It would provide an opportunity to create a significant entrance feature into one of the original and first areas* of the City to be developed, such as,.,the waterfall, that long graced this property. The property could abo be home to a future mini -Fire Rescue/ Police facility and passive park. The discussion of benefits to the City by purchase of this property go on and on. Funding sources should be of little concern. With all the new development, impact fees for recreation should be swelling the Recreation Land and Facilities Account. Funds from the recent sale of the Cultural and Recreation lands in the Regional Center could be used. Some of our tax money could be allotted to this endeavor. There may be some grant money available. County Commissioner Marcus could be convinced thpt her discretionary funds are viable for this purchase. With imagination, creativity, and the will to succe,qd, purchase of this property for the residents of Palm Beach Gardens should be a "no brace. In conclusion, I would urge the City Council to give the highest priority to this suggestion. There is no need for a committee, or delegation to staff for study. It requires the City Council to make a decision to proceed. As a longtime reident and past Mayor and Councilman I would suggest a publicly advertised workshop meeting followed by a regular meeting to make your decision. Thank you for consideration of this important City matter. S' cere 1 Martino • • ATTACHMENT 3 Banyan Tree PUD — Parcel 12.04 & 12.05 Other considerations: ➢ Estimated Recreation Impact Fee balance @ 9/30/02 is $1,900,000 ➢ $745,000 has been allocated in FY 2003 and 2004 CIP budgets ➢ Possible grant sources — development: FRDAP ($200,000 matching grant); Recreational Trails Program ($100,000 matching grant); Keep Palm Beach County Beautiful (beautification dollars for use along Northlake Boulevard — requires 50/50 match) ➢ Possible grant sources — acquisition: Florida Communities Trust/Florida Forever Program (municipalities must provide a minimum 25% cash match); Florida Greenways and Trails • Acquisition Program (match may be required) East (5.21 acres) West (3.9 acres) Total Market Value of Land $1,453,100 $1,089,733 $2,542,833 $278,000 per acre Construction Value- $2,375,000 $2,375,000 Office Construction Value- $2,295,000 $3,272,500 $5,567,500 Retail Construction- $291,984 $208,016 $500,000 horizontal Total Value of Land- $6,415,084 $4,570,249 $10,985,333 If Developed Loss in Ad Valorem ($38,490) ($27,421) ($65,911) revenue if taken off tax rolls and not developed Annual Debt if Land ($116,248) ($87,179) ($203,427) was purchased and financed for 20 yrs. Millage required to .0291 .0218 .0509 fund debt service Loss of permit fee ($35,264) ($24,736) ($60,000) revenue Loss of impact fee ($357,097) ($258,587 ) ($6151684 Development Costs $182,350 $136,500 $318,850 (Passive Design) @ $35,000 /acre Design & A &E fees: $18,235 $13,650 $31,885 10% of construction costs Operating Costs: - Salaries $21,673 $16,224 $37,897 -Operating Supplies $12,480 $9,360 $21,840 -Capital Equipment $50,000 $50,000 $100,000 -Water Feature Costs $100,000 $100,000 $200,000 Other considerations: ➢ Estimated Recreation Impact Fee balance @ 9/30/02 is $1,900,000 ➢ $745,000 has been allocated in FY 2003 and 2004 CIP budgets ➢ Possible grant sources — development: FRDAP ($200,000 matching grant); Recreational Trails Program ($100,000 matching grant); Keep Palm Beach County Beautiful (beautification dollars for use along Northlake Boulevard — requires 50/50 match) ➢ Possible grant sources — acquisition: Florida Communities Trust/Florida Forever Program (municipalities must provide a minimum 25% cash match); Florida Greenways and Trails • Acquisition Program (match may be required) • 1.) Substantial revenue would be lost (both fees and tax base) under city ownership. 2.) The attached traffic study indicates no additional traffic. trip generation imposed on the properties to the north beyond the concurrency analysis. 3.) The proposed development would enhance the traffic patterns at the intersection and beautify the immediate areas around the namesake Banyan Tree at the developers expense. 4.) The purchase price of this property is substantial and may require a referendum. 5.) Drainage would be improved in the entire area at developers cost by a condition of approval in the P.U.D. 6.) Any and all maintenance of the total properties would be borne by the developer, this would include both on and off -site features. 7.) The northerly extension of Congress Avenue is still being debated by the County Commission and the impact on this property is unknown. L • 1.) If developed the property may be used for cut - through traffic by lightweight vehicles west bound on Northlake Boulevard due to the ingress- egress on the south properties. 2.) A passive park would retain line of sight and eliminate vertical construction. . 3.) The existing recreational complex could be enhanced or enlarged. 4.) The City would have a parcel(s) that could be used to make an entrance statement with signage and landscaping. 5.) The City would have a "people place" to gather for baseball/softball tournaments and other events on an interim basis. 6.) A portion of the parcel could be used for spill over grass parking -as needed. • • • 02/08/2002 11:36 56162490db ,•� ,... , ' Vf E t t d. I YVONNE ZIEL TRAFFIC CONSULT4NTS, INC. 11440 86th St. Nonh, Wsst Palm Bach, Florid& 33412 February 7, 2002 Mr. Stephen S. Mathison PA 5606 PGA Boulevard Suite 211 Palm Beach Gardens, Florida 33410 Re: South Florida Blood Bank Dear Mr. Mathison: r•� (561) 824.7262 • Faoimile (561) 624.9518 This letter is in response to your concern regarding the trafire bomlthe above referenced project. The only traffic expected to access the site through MacArthur Boulevard from the north are those residents living north of the site, These residents currently utilize this road. They may make a few extra trips when they access the site, or stop at the site bn the way out or back to their homes. Otherwise the project has no significant impact on tbelneighborhood to the north. if you need any additional Information, please call me. I Sincerely, i �101111E ZIEL SULTANS, INC. a Ziel, P.E. President y i r t I i Traffic Enginearing and Planning i i I i CITY OF PAUd 05-:11-CH GARCFN S PLANNING & 4,4ING DEPT, I I t I .sari -L4 -U2 11:12A • • .7 ROUGH DRAFT CONDITION LANGUAGE Applicant w411 monitor turning movements at the ingress and egress point and median opening at Phase Two twice a year (peak season and off season) for a period of two years after completion of the Blood Bank and Phase 2 to assure there are no substantial detrimental impacts to traffic in Plat 1. The monitoring reports will be delivered to the city engineer and Ms, Carol Estrada as representative of Plat 1. P.02 If the monitoring reports indicate such substantial detrimental impacts, Applicant will under take such efforts, applications and approvals to modify the ingress and egress point (i.e., to a right turn out only from Phase 2 to Northlake Boulevard) are a means of mitigating same. Any such revision to the ingress and egress point at Phase 2 shall require the Applicant to provide a revised .T TIA to the city engineer for review and approval as to traffic impacts. RECEIVEU: i o /Ue 07/.6/2002 15:20 5614341663 PINDER TROUTMAN • #01 FINDER TROUTMAN CONSULTING, INC. PAGE 02 Transportation Planners and Engineers 2324 South Congress Avenue, Suite 1H West Palm Beach, FL 33406 (561) 434 -1644 Fax 434 -1663 www.pindertroutman.com July 16, 2002 Mr. Talal Benothman City of Palm Beach Gardens Planning & Zoning 10500 North Military Trail Palm Beach Gardens, FL 33410 Re: Banyan Tree PUD - #PTCO2 -29 Dear Mr. Benothman: The purpose of this letter is to address condition 19 of Ordinance 41, 2001. This condition requires a traffic analysis for Phases 2 and 3 of the Banyan Tree PUD. The Banyan Tree PUD received traffic concurrency based on the traffic analyses prepared for Parcel 12.04 (Phase 3) and Parcel 12.05 (Phases 1 and 2). Both sites were approved with right -in /right -out movements on Northlake Boulevard and driveway connections on McArthur Boulevard allowing a full complement of left and right turn movements. Parcel 12.04 was originally approved for 27,000 SF of Retail use and 25,000 SF of Office use. A traffic equivalency analysis has been submitted for a proposed development including 24,700 SF of Retail use, a 5,000 SF Quality Restaurant and a 3,900 SF Drive -in Bank. This proposed development program will generate less net new external daily and less AM peak hour trips than the approved development program. During the PM peak hour, the number of net new external trips is estimated to be the same for both the approved and proposed development programs, Parcel 12.05 was originally approved for 29,000 SF of Retail use, 25,000 SF of Office use and a 3,500 SF Drive -in Bank. A traffic equivalency analysis dated August 21, 2001 proposed 38,500 SF of Retail and 41,000 SF of Office use, This traffic equivalency analysis, which as been approved, also showed a decrease in net new external daily trips as well as a decrease in net new external PM peak hour trips. As currendy proposed, the traffic from both Parcel 12.04 and Parcel 12.05 has been reduced. Thus the traffic impacts on MacArthur Boulevard, from the neighborhoods north of the site, will be reduced. If you require additional information please contact this office. VerWPinder,AICP h Principal KM P /ld r cc: Jim Helm Sean Donahue [enetsenorhman0 ? -?9 7.16 -0.2 FTC, • • • BANYAN TREE PUD TRAFFIC ANALYSIS Introduction Banyan Tree is an approved PUD located both east and west of MacArthur Boulevard and north of .. Northlake Boulevard in the City of Palm Beach Gardens. The sites have traffic concurrency approval F for a combination of retail and office uses. Ordinance 41, 2001 (February 21, 2001) of the City approved the rezoning of the sites to Planned Unit Development and also approved a site plan for a 40,900 SF office building on Phase 1. Phases 1 and 2 are located on the west side of MacArthur Boulevard and Phase 3 is located on the east side of MacArthur Boulevard. The subject ordinance also restricted certain ingress and egress movements. Trip Generation Trip generation for the approved uses on Phases 1 and 2 and the proposed uses on Phase 3 are shown on Exhibits 1A, 1 B and 1C for the Daily, AM peak hour and PM peak hour respectively. The current development programs for the PUD are less intense than the traffic concurrency approval. On a daily basis the trip generation is 23% less than the concurrency approval and during the PM peak hour the trip reduction is 15 %. Traffic Assignment A trip distribution and assignment was developed based on proposed driveway configuration, previous traffic study approvals and knowledge of traffic patterns in the area. The assignment of traffic to project driveways and adjacent roadway links is provided on Exhibit 2. As a result of the revised driveway geometrics and a reduction in new external project traffic, the impacts on all roadways is less than that of previous approvals. Report 02 -29 7 -25 -02 1 • • • Conclusion Banyan Tree PUD traffic impacts on MacArthur Boulevard will be less than that shown and approved in the concurrency traffic analysis. Report 02 -29 7 -2S-02