HomeMy WebLinkAboutMinutes RAB 032706PARKS AND RECREATION ADVISORY BOARD March 27, 2006 The Parks and Recreation Advisory Board met on March 27, 2006 in the Council Chambers located at 10500 N. Military Trail, Palm Beach Gardens, Florida. The meeting was called to order at 6:09 P.M. and opened with the Pledge of Allegiance. L ROLL CALL Members Present: Tory Buckley Maryanne Hedrick Philip Milton Bert Permuroso Carolyn Chaplik Ernest Volonte Members Absent: Wendy Walker Additional Attendees: Council Liaison David Levy, Charlotte Presensky, Recreation Director, Jack Doughney, Community Services Administrator, Mike Kelly, Parks Director, and Dan Reidy, Operations Director U. APPROVAL OF MINUTES The Board approved the Minutes from the February 27, 2006 meeting in a 6 -0 Vote. III. ITEMS BY STAFF LIAISON Recreation Loan Charlotte stated that the recreation loan is coming before City Council on April 6, 2006. Charlotte asked the Board to take a few minutes to read the draft memo to City Council showing their support of the loan that will be used for recreation improvement. The Board read over the memo and Tory Buckley suggested that information about hurricane damage and repairs should be included in the memo. Charlotte is going to make the changes and Bert will sign the memo. Charlotte announced that Allan Owens will be recommending Wachovia Bank for the loan and the interest rate will be 3.74 %. Open Seats on Recreation Advisory Board Charlotte reminded the Board that there are two alternate positions open on this Board and asked them to spread the word to people who might be interested in serving. Upcoming Activities Charlotte announced that the following events are scheduled in next month and invited the Board to attend. They are: Town Hall Meeting on March 30, Concert Series at Eissey Hall that is sponsored by Frenchman's Creek on April 2, Pitch, Hit and Run Competition on April 15, the annual Egg Hunt on April 15, and the last day of the Green Market is April 16. On April 27 the City will be presenting "Weather the Storm" which is a program that will be held at Burns Road Community Center. Meteorologist Steve Weagle along with vendors and other municipalities will be attending the event. Charlotte also announced that May 5, 2006 is the tentative date for the Sand Hill Crane Ground Breaking. Charlotte stated that in the packet that the Board received is a memo from Operations Director, Mike Morrow with an update of the gate at Ilex Circle. The gate is up and running but has already been vandalized. There was discussion regarding the vandalism and it was suggested that the City use cameras or even fake cameras to deter the vandals at Ilex Circle. Charlotte will do some research and get back to the Board at the next meeting. IV. OLD BUSINESS Mike Kelly gave the Board an update of the repairs from the hurricane damage. Mike stated that nearly all the repairs are completed. The lighting at Garden's Park is still being repaired and poles have been ordered for PGA Basketball and Tennis. The work should be completed in the next few weeks. 85 -90•/o of the work is completed throughout the City and the remainder will be done in the near future. Dan Reidy reported on the renovation updates of the Golf Course. The Council approved the bid award for the greens restoration and replacement of the master pump station. The construction will begin on May 1 t and will last approximately 92 days depending on the weather and conditions. The Golf Course will be closed during the construction. The bridges portion of the project is going to City Council on April 2& for the bid award. The bridges are sagging and piles need to be replaced. The septic tank is in the initial permitting stages and will start in the middle of the summer. They are also adding floating target greens and ordered new tee box markers. He also talked about the possibility of lighting the driving range in the future. They are planning a ground breaking ceremony for the golf course on May 1, 2006. V. NEW BUSINESS PGA Park- Outcome of Walking Tour Charlotte showed the Board a schematic plan of PGA Park and a list of all items that need to be repaired that are not included in impact fees. The request for a bid is already out on Demand Star and hopefully, by June, she will have a master plan put together. The repairs are all within the loan funding. There was discussion about what the Board's thoughts were after they had toured the park. Some of the suggestions included: a volleyball court, additional picnic areas, parking areas closer to the picnic area, and a tot 2 lot. They talked about redesigning the entrance and parking. They agreed that there is a need for a professional to come in and give suggestions including costs and an analysis of what services are actually needed at the park. Jack Doughney suggested getting an idea of what they would like to be done in the park prior to additional repairs being done. Charlotte went over what can be included in impact fees and what is included in the loan. She explained that in her budget for next year, she added master park planning. Master planning will look into the future for at least 10 years and give a good outlook of what is going to be needed with the growing population. The Board agreed that PGA Park needs a lot of work and they like the idea of bringing in a professional. Capital Planning Priorities Charlotte went through the list of the capital planning priorities that have been completed. 1) Burns Road Community Center Staff will be moving back into building in approximately 10 days. The locker room will be will open the end of April. The new gym and kitchen should be open around July 15. They are behind schedule because of the hurricanes and lack of available labor. The parts of the plan that have been accomplished are a new gym, new locker room, expanded storage, new pool and staff offices. 2) Lake Catherine Passive Area An RC Boat launch has been added and ramp repairs were completed. The irrigation is not yet completed. There have also been new trees planted. 3) Lake Catherine Softball Complex New concession and some dug -out renovations have been completed. Parking enhancements are in place. Shade structures completed. A small bathroom and pavilion down by the single field is also complete in addition to the streetscape along McArthur Blvd. 4) Pool A new competition pool and spray playground have been completed. Attendance has been phenomenal. It has collected $75,000 in admission that went to the general fund last season. The old pool was improved by adding slides, shade structures and a large picnic area. Charlotte added that in this year's budget she would like to add a playground for ages 5 and under. 5) Riverside Community Center The facility was renovated to make Riverside a licensed Childcare Center which is completed and the loan is going to start being paid back this year. The outside play areas need to be enhanced and there needs to be safe decking on the ground. 6) Plant Drive Park Skate Park is getting the lights and should be installed in 2 weeks and they would like to add the streetscape element to the park. The parking and playground needs to be installed. 7) PGA National Park Other than new roofs on the bathrooms and some work done on the tennis and basketball courts, most of the work is included in the new loan and will be put in the new master plan. 8) Oaks Parks This project has not been completed. Charlotte feels there needs to be much more discussion on the park before committing to any improvements because the people in the area are not open to enhancing the park. The tennis courts were recently resurfaced and there are a lot of players using the courts. 9) Lilac Activity Center This is a visionary project that will be included in the system master plan. 10) Gardens Park Shade awnings and expansion of the parking are both in the funding stream. The Shade awnings will be completed in April. 11) Art Park and Plaza Staff would like to enhance the plaza for future events. 12) District Park Charlotte stated that every year $400,000 is earmarked for the District Park. City Park has been an evolution from that money. There have been two grants received over the past few years. There are now basketball, playground, handball, and a pavilion with restrooms. The expansion will include racquetball, shade over playground, lightning for basketball courts, two hard -court tennis courts, and extending the trail. 13) Tennis Center The Tennis Center is now under construction for four additional courts and one center court with lights being added. The new lighting for the other courts is going before City Council on April 6, 2006 to be funded via FEMA and Impact fees to replace/upgrade the lighting system due to hurricane damage. In the future they will look at expanding the clubhouse at the Tennis Center. 14) Howell Lane Park This park is located behind the fire station on North Lake Blvd. The land use is undecided at this time. They thought about adding a playground park but they are not sure if this is going to move forward. 4 General Fund Projects — 5 -Year Projections Charlotte went through the list of the projects that she has planned on the General Fund list. Community Center Equipment The Community Center goes through tables, chairs, curtains, PA systems, lightings about every three —four years. A few years ago they added this as a line item so they could keep the equipment refurbished. Aquatic Complex There is going to be outlay for deck furniture. Oaks Park Pavilion Replacement This element is still left over from planning years ago. Charlotte suggests talking about this project to see how it should be approached before making any decisions. Playground Replacement Program Charlotte stated that every five years they are going to evaluate the playgrounds to make sure they are meeting current ADA and safety codes. In the recreation loan there is money set aside to replace the playground equipment at Burns Road. Burns Road Community Center The Center is in need of an internal PA system. Charlotte talked about future projects. She stated that the old pool is going to need work and they have put this in the budget. They would like to look at making changes to the pool before moving forward with any repairs. There were questions about some of the projects. Ernest Volonte asked about the item that says "stage equipment replacement ". Charlotte stated that a few years ago there was a group called the Spot Light Players that used the community center. When Spot Light left they took all the stage equipment. She would like to bring to the level where community performances can be held. Capital Projects — 5 Year Projections 1) District Park/City Park As Charlotte explained earlier, there is $400.000 kept in the budget for these parks. Bert Permuroso asked what happens to the money for the District Park if it is not used. Charlotte stated that the money will continue to stay in the fund if they are not used. Some of the money has been used on City Park and Tennis. She pointed out there are still 35 acres left to develop. She also pointed out that if, in the future, the County comes back and wants to partner on District Park there will be money set aside for the development. 2) Skate Park Phase H The streetscape will be installed and Charlotte feels this park will be a popular spot once the lights are installed. 3) PGA National Park They are going to work with a professional regarding the construction at PGA National Park. They are planning on applying for grants for this project. In order to apply for the grants you have to show the state that you have the matching funds. If they don't apply for a grant then the money stays there until they can use it. 4) Plant Drive Park Expansion There is $225,000 to expand the park and build a pavilion. This small project will help the park tremendously. 5) Garden's Park Parking Expansion This is proposed for next year to enhance the over -flow parking at Garden's Park. 6) Activity Center Planning and Construction There is $30,000 for decision making and construction drawings. The next year there is 2.7 million to build a facility. The planning should come up during the system master planning. 7) Garden's Park Shade Pavilions There are some areas within Garden's Park where they can add more pavilions. C40rrxai�l'8) Pock Fields Pavilions ,--,7 This project is 4 years out. This will provide a shelter within the soccer field area. 9) Aquatic Complex Deck Expansion and Restrooms The restroom and shower facility needs to be expanded. 10) Pro -Shop Expansion and turn amid Pavilion These repairs and editions are eligible for impact fees. By improving the Pro Shop and adding new pavilions this will hopefully bring more people out to the golf course. 11) Master Planning for Parks System This will be started in two fiscal years. This will include shuffleboard and lights. This will allow people to play shuffleboard at night when it's not so hot. These improvements are also eligible for impact fees because it helps you to expand the capacity. 12) Mirasol Tot Lot Since the Honda Classic is moving to PGA Staff is hoping to take over the recreation center at Mirasol Park. They would like to bring in programs for younger children in the morning, teenagers in the afternoon, and hold adult classes in the evenings. 31 13) Tot Lot Expansion and Equipment Charlotte stated they would like to build a new tot lot behind the Burns Road Community Center located near the pool. She would also like to be able to rent out the space for birthday parties and family events. 14) Projects Identified in the Master plan Charlotte has placed marks $2 million for future land for future land purchases. VL Comments by the Public Tim Frohling from Euphrates Circle commented on the District Park and acknowledged that if the District Park is going to have certain elements than maybe it should consider putting different element at PGA Park. Tim also commented on the funding that is being brought before Council on April b and asked if there is the capability in the city to do models of economic impact for events that are held at the city. Charlotte stated that there are some standards that she can use that are put up at the National Recreation Park Association and she will put some of the information together and bring it back to the Board. Tory Buckley asked if he can get a list of the numbers for economic impact that the sports commission recently came out with. VII. Comments by the Board Philip Milton asked Charlotte if there has been any consideration given to giving space for the PBGYAA once the Burns Road facility is completed. Charlotte stated that she is considering this, and has ideas on how this may work and we'll get back to the Board in the near future with more information. Carolyn Chaplik asked if there is going to be a ribbon cutting ceremony when Burns Road Community Center reopens. Charlotte stated there will be a ribbon cutting and would like to bury a new time capsule. Since the building is being done in different phases they will probably wait until the end of the project and hold celebration. Philip Milton asked about the youth festival and Charlotte said that that will be done in the fall because of the construction at Burns Road community Center. VIII. ADJOURNMENT With no further business to discuss the meeting adjourned at 7:49 P.M. Approve: Bert Permuroso ttt Wendy Walker 7 Carolyn Philip Milton Attest: Susan Bell Public Information/Recording Coordinator ... ~--- T. . r· "'" ----J .. ~11 ·~r. -;_ -= r:;..---~ -.}, I ·. . . • .. ..~ I '. --__ , ,.._ ------.. ~-=---==~ -~---== -=---:.. ::-=-,-,. fl i:-= /t Y ,-..J ,-, ,..,._ j: ~~ L ·k,"' it-" ---____ ,......._ ------ ------· -----· 10. P! Park Priority Issues: • Restore 0 Parking -Multipurpose and Baseball 0 Irrigation • Lighting at Sports Fields a Walled Pavilions are a Problem • Storage for Athletics and Maintenance 9 General Field Renovation e Resolve Drainage Issues Conceptual Improvements: • Enhance Open Space Areas and Trails • Playground & Pavilion Renovations 9 Restroom and Storage Building • Field Renovations e Parking Lot Renovation 0 Re-Align and Enhance Entrance Road 0 Parking Controls 2 e • DEPARTMENT PROJECT DESCRIPTION RECREATION FIVE YEAR CAPITAL OUTLAY PLAN • GENERAL FUND 2005/2006 Burns Road Community Center Renovations Burns Road Playground Replacement Security Systems Capital Outlay -Community Centers Equipment BRCC Grounds/Irrigation/Landscaping Existing Bathroom Renovation total Lake Catherine softball complex renovations Lake Catherine Irrigation Sports Field Lighting Fencing Replacement Playground Replacement Dugout Renovation Parks Storage Building Practice Area Renovations total PGA Park renovations PGA Pump and irrigation replacement Restroom Renovation Pavilion Replacement Softball Field Sports Lighting Fencing Replacement total Aquatics Complex -Pool Blanket Replacement Aquatics Complex -filter replacement 412,000 850,000 798,000 5,000 7,000 195,000 30,000 25,000 150,000 12,000 412,000 100,000 255,000 152,000 100,000 80,000 100,000 63,000 850,000 198,000 65,000 55,000 380,000 100,000 798,000 • Multipurpose Field-new irrigation, drainage and resod Parking space near the multipurpose field (south end of the field) when first come in off Hiatt Drive Heart trail around fields and perimeter of park Benches around lake and park Ryder Cup gate moved east so people from PGA can come into park with room to park access is not created as a cut through (surpass PGA guard shack) Additional pavilions with grills (near tennis court and building; open areas) Add benches throughout the park Additional picnic tables Bigger playground/more equipment Outside of fields jogging trail Volleyball court Circle-fence with tot lot for younger kids Additional parking spaces Restroom/Building-make it a concession; restrooms need work Signage throughout the park letting visitors know what activity areas are available Concern about entrance off of Hi att Make 1 basketball court small baskets for young kids Comments from "Walk Through" at PGA Park on Saturday, March 4 1h at 2:00 PM Ernie Vo lonte o Everything needs to be redone o Restrooms o Roofs e Entry • Drainage o Fencing for access control Bert Prernuroso • Trail around the park CII Benches -shaded o Dog Park area e Additional pavilions and some closer to fields • Restrooms o Need for pressbox? o Bermuda grass multi-purpose and south softball field GI New Sportslighting poles and lights G) Playground -fenced and shaded e Connecting pathways to all activities GI Use circle for activity use o Centralize parking farther west or along side of entry road. o Additional restrooms Charlotte Presensky From: Phil [Philipmilton@mac.com] Sent: To: Monday, February 27, 2006 12:03 PM Charlotte Presensky Subject: PGA Walk About! Not in any order: 1. More Parking 2. Irrigation / New Turf 3. Better use of soccer area for multiple sports. 4 . Upgrade adult softball area. 5. New Pavilion )s) 6. Expand I Upgrade playground (s) 7. New Screening+ lights Tennis Courts . 8. Lights on Basketball Courts. 9 . Access to PGA National via Ryder cup. 10. Restructure traffic flow (circular area wasted space). 11 . Entire park needs complete redesign . Phil & Kathy Milton 262-6746 1 • Save Open Space Parks & Recreation Referendum March 11, 2003 • Recreation Citizen Advisory Board Members Robert Premuroso, Chair Mary Anne Hedrick Phil Milton Dave Lill Tory Buckley George Schmidt Wendy Walker "Serving their Community" • City 1>f P•lm Het1<·h Gnrtl,ns Ptrrk..f &. Rcarutimr .s,,~__.. . ...... --...... ---.--.. ------------.:--·""'--------··-·--·-.....--__________ ,.. __ _.._ ,..,. ___ .... _ ---· .... _ .... ___ --····-.:.· ... -~-........,.. .... _, .... ,,. --~--,·----· -~--------~ .. · --·-· ..... -4' ..... ___ , _,. __ ... __ ... ·. ---······ .. ·-· -~------·-=--':.:..·.:::. .. ._.,., ... __ _ ........ ......... -" ·--" --·----... ---" --·· ·-·-.::_ ·----... -.. --·-__ .__ .. ..,. __ _ __ ,,._ ........ _ ............ ._ .... ___ ,... ___ .. ___ .. -··------· .. ____ ......... _ ........ .._v .. _,__,_ -_::::.:-_ :.~ ------------------- Results of Citizen Survey Priority to Current Residents Nature Trails Open Spaces Playgrounds/Picnic Areas Community /Teen Center Aquatic Center Dog Park 3 • 1. Lake Catherine Area A. Po.ssive Park B. Softball Complex c. McArtu Baulewrd Improwrnr:nts 2. Gardens Park 3. Municipal Plaza Amphitheater/ Art Park 4. Burns Road Community Center 5. Burns Road Municipal Pool 6. Oaks Park 7 . Plant Drive Park B. Lilac Park 9. Dog Park 10. PGA Park 11 . Riverside Community Center 12. Sandhill Crane Access Park 13. District Tennis Center • Parks Projects Palm Beach Gardens Parks and Facilities Map c ....... ~=--·~ .. Jt--.-...,.o.... c, .. ...._Cllow m,....__. ..... a .......... ......,""""" o-... m~..-...... _ fl .... -....... ao.... C! ... •ea-a,... ............ 0.-........ B'--._,_., _ 4 1 A. Lake Catherine Area: Passive Open Space Park Priority Issues Keep Passive Part< "PASSIVE" • Preserve the Green Space Conceptual Improvements: Site Enhancements (signs , benches, tables) Waterside Canoe / Kayak Launch Landscape Enhancements - provide shade 5 • • 1 B. Lake Catherine Area: Softball Complex 6 • 1C. Lake Catherine Area: McArthur Boulevard Open Space and Imp rovemen ts Priority Issues • Preserve Open Space • Traffic Calming Conceptual Imp rovemen ts: • Acquire East Parcel • Develop Passive Open Space Park Develop "Gateway" Parkway • Landscape and Irrigation Enhance Parking at Passive Park • L ·m • 2. Gard en s Park -Phase Two Priority Issues More Parking Circulation Signage Sidewalks (Especially Connections to City Hall) Soccer Concession and Storage Building Batting Cage Renovation Conc eptual Imp rove ments : Shade Structures Soccer Storage Building Sidewalks Crosswalks Playground Equipment Site Enhancements Pave Grassed Parking Area Landscape and Irrigation Enhancements e 3. Municipal Plaza Amphitheater and Ari Park Open Space Priority Issues: • Stage area More Green/ Park-like More Shade Trees • Separate Parking from Plaza • Use Space on Military Trail Conceptual Improvements: • Art Park on Mlitary Trail • Covered Stage with Removable Platform and Backdrop • Make the space more "green" • Plaza Pavement and Seating Enhancements 9 • • 4. Burns Road Community Center and Campus Priority Issues: • Renovate and Expand Facility -Hot Water -Renovated -Larger Gym -Dance Room Enhancement -Air Conditioning Renovation -New Roof Restore Green Space Lighting in Parking Lot -~ ,-~;~·:.::~=~-~~ . ,...;~~.;.~:::-:::·.: . • Coi~:::~~~~~~~~:~~s~obby • Re-partttioning to Accommodate Current Programming Needs, Including Restroom, Kitchen and Office Improvements • Restore trails -Add paths Restore Landscaping General Lighting Improvements 10 • 5. Burns Road Municipal Pool , · \ '~S Priority Issues: ·· ... /L • Separate Adult Uses from • .• '·. • '.. I Kids Uses • Kids play area Adult Issues -ShOwers, Locker Room, Restrooms Competition Pool Conceptual Improvements: • Update general ,:f ·. -.}' ~ ) • Main Pool Upgrade ,~ ~~ • ·spray'PlayArea i-::;:------• Expanded/ Enhanced Deck -c::::::~ ~--=--::: • Add Shade/green space 11 • • 6. Oaks Park Priority Issues : Maintain Open Space • Shade Beautify Landscape Clean Lake / Pond Block Park from Canal • Full Court Basketball Conceptual Improvements: Enlarge / Replace Existing Pavilion • New Playground with Shade • Basketball Court Enhance Trail System Landscape and Irrigation 12 • ;;;.;.:~ ·-, I J -·------r '· II 7. Plant Drive Park Priority Issues: • New Teen Activity Center Building • Complete Phase 2 of Skate Park Conceptual Improvements: • Cover Roller Hockey Shade Structures • Skate Park Expansion (Phase 2) • Replace Playground • Additional Sidewalks Landscape and Irrigation Enhancements 13 • • Lilac Park & Open Space Priority Issues: • Improvements to Lilac Property Conceptual Improvements: • New Recreation Center and Gym • Outdoor Basketball • Open Space & Trails • Pedestrian Connection to Bums Road COmmunity Center/ Plant Drive 14 • • • 8. Lilac Park Priority Issues: • Improvements to Lilac Property • Create Park Corridor Dog Park Road unity Center Provide Space within District Park 15 16 • ,. • 10. PGA Park Priority Issues: Restore Parking -Multipurpose and Baseball Irrigation • Lighting at Sports Relds Walled Pavilions are a Problem • Storage for Athletics and Maintenance • General Reid Renovation • Resolve Drainage Issues Conceptual Improvements: • Enhance Open Space Areas and Trails • Playground & Pavilion Renovations • Restroom and Storage Building ;.---• Reid Renovations /--,:;---: .~ • Parking Lot Renovation ~ -----;f ,-[ • Re-Align and Enhance :.:-:r"~, Entrance Road :-:.-:--£ · I : _ • Parking Controls ::.::..:--~~ 17 • 1 :j ~ I l V '. • 11. Riverside Community Center \l\'\ \'. , , \ \ Priority Issues: · •• \ , \ \ \ , • Needs Have Outgrown .• , \. \~ '\ Build ing and Site \ · '\ \. ' • More Parking ' ~ '\ \ \ \. • Better Lighting in Parking Lots \ , \.. . • Solve Vehicular Traffic ', . · \. \.. Patterns re: Safety \ ", ,, • New Roof , -' • Upgrade Air Conditioning ' . \. ' '\ Conceptual Improvements: Focus use of Facility on Youth Programs • Parking and Entrance Area Modifications • Lighting/Electrical Upgrades HVAC Improvements • Interior/Exterior Improvements 18 • 12. Sandhill Crane Acce ss Park and Trail Conceptual Improvements: • Trailer and Car Parking Restroom Facility Boat Ramp and Dock • Interpretive Signage Landscape 19 • • 13. Tennis Center -Pha se Two Priority Issues: Complete Phase II Courts • Practice Backboards Storage at Pro Shop Conceptual Improvements: • Four New Courts • Practice Backboard Controlled Access Fence Shade Structure over Bleachers 20 • • • Improvement Program Summary 21 C IP • t· ap 1a r1or1 1es • Compiled Rank DESCRIPTION RAB Member Rankinqs Staff Rankinqs 1 Burns Road Community Ctr 1 1 Restroom Renovation Gym Renovations Interior Renovations 10 Lake Catherine 11 9 Irrigation Upgrade 5 Lake Catherine SftbllCmplx 4 5 Concession Building Dugout Renovations Irrigation Upgrade Parking Enhancements Replace Sports Lighting Playground Shade Structures Field Renovations Fence Replacement 4 Pool 5 3 New Pool Design • New Pool 6 Riverside Community Ctr 6 6 Interior Renovations 2 Plant Drive Park 3 2 Rebuild Teen Center Playground Replacement Resurface Roller Hockey Pavilion over hockey Rinks Ball Field Renovations 3 PGA Park 2 4 Restroom/Storage Renovations Softball Field Renovations Pavilion Renovations Multi Field Renovations Interior Fencing Irrigation Replacements Parking lmprovments New Playground • 8 Oaks Park 9 10 Pavilion Replacement Irrigation/Turf upgrade • 7 Lilac Activity Center 7 7 Design Site Work/Facility/Outdoor Facility 11 -tie Gardens Park 11 -tie 11 Shade Awenings 13 Art Park/Plaza 13 12 New Facilities 9 District Park 11 -tie 8 Phase 2 Tennis Center Phase Two Phase Three Phase Four 11 -tie Howe! Lane Park 10 13 Playground Sitework/Furnishings FIVE YEAR CAPITAL OUTLAY PLAN° IMPACT FUNDS DEPARTMENT PROJECT 2006/07 2007/08 2008/09 2009/1011 20109/11 • DESCRIPTION COMMUNITY SERVICES Recreation Dislricl Park/Cily Park 400,000 400,000 400,000 400,000 400,000 Skate Park Phase II 200000 PGA Park Planning/Construction 2,000,000 FRDAP Grants TBA 420,000 420,000 420,000 Plant Drive Park Expansion Plan/Constr 225,000 600000 Gardens Park Parking Expansion 500.000 Activity Center Plan/Constr 30000 2,700,000 Gardens Park Shade Pavilions 350,000 Klock Fields Pavilion 100,000 Aquatic Complex Deck Expansion/Restroom 250,000 Golr Course Pro Shop expansion 200,000 1,250,000 Golr Course Tournament Pavilion 200,000 Master Planning Park System 50000 Shurtleboard Pavilionsnights 120000 Mirasol tot lot for center 125,000 Tot lot expansion/equipment 120,000 Projects Identified In Master Plan 2000000 Total Recreation $3,720,000 $2,120,000 $3,520,000 $2,100,000 $2,820,000 • • • • • FIVE YEAR CAPITAL OUTLAY PLAN -GENERAL FUND DIVISION PROJECT 2006/2007 2007/2008' 2008/2009 2009/2010 2010/2011 DESCRIPTION COMMUNITY SERVICES Recreation PGA Park renovations Capital Outlay -Community Centers Equipment 15,000 2,000 2,000 15,000 3,000 Aquatic Complex -filter replacement 10,000 Aquatic Complex -Capital Outlay Deck fixtures 6,000 2,000 3,000 Oaks Park pavilion replacement 50,000 Playground replacement program 195,000 300,000 150,000 Stage Equipment Replacement 186,000 BRCRC-PA sytem replacement 29,000 Aquatic Complex Old Pool Refurbishment 1,750,000 Capital Outlay -Gym Equipment 5,000 Aquatic Complex -Shade Structure/Umbrellas re- placment 75,000 Skatepark Ramp replacment 100,000 Subtotal $295,000 $490,000 $5,000 $1,775,000 $333,000 Total $295,000 $490,000 $5,000 $1,775,000 $333,000 J e CITY OF PALM BEACH GARDENS MEMORANDUM TO: Mayor and Council DATE: March 15, 2006 FROM: Bert Premuroso, Chairperson Recreation Advisory Board SUBJECT: Capital Planning-Parks and Recreation Loan On Monday, January 23, 2006, the Recreation Advisory Board passed a motion to fully support the Parks and Recreation Improvement Loan now under your consideration. The purpose of this memo is to bring to your attention our support and to provide you with details on the work that has promulgated a loan request. We have diligently worked with staff over the past four years to recommend a sound Parks and Recreation Capital Improvement Plan that will serve our existing and new residents. Impact Fee funding mainly serves the new residents of our community, but we continue to be concerned about appropriate funding for our existing park system. We set out four years ago with an eight-year recommended capital plan. Part of that plan was dedicated to the replacement of infrastructure within existing parks that is past its useful life or that is in need of replacement due to the intensity of use. These items, as you are aware, are not eligible for Impact Fee funding. It has to be funded from the General Fund. Our recommended Capital Plan has been part of the annual budget process for the past four years. We had the understanding and accepted the fact that General Fund appropriations were limited and, therefore, planned for the largest request of capital outlay to be in 2006, which is the fourth year of our capital plan. It should be noted that after the bond failure, we, along with staff, have sought ways to be creative in meeting the needs of our community. The recommended Capital Plan was developed solely on their input and our deliberations. If a loan is not considered, these items will continue to appear in the annual budget process and we are afraid, in the near future, some older facilities will need to be removed completely from our system. As always, your consideration is greatly appreciated. CC. Ron Ferris, City Manager Jack Doughney, Community Services Administrator Charlotte Presensky, Recreation Division Director