HomeMy WebLinkAboutDRC - 122106 - Gardens Commerce Center'Development Review Committee Meeting Petition PPUD- 06 -03 -07 Gardens Commerce Center December 21, 2006 Present at Meeting Judy Dye, Engineer, LBFH Mark Hendrickson, City Forester Bruce Gregg, Director of Operations- Seacoast Utility Authority James Brown, Deputy Building Official Scott Fetterman, Deputy Chief, City Fire Rescue Mike Morrow, Operations Director, Public Works Dan Clark, City Engineer, LBFH Dolores Key, Economic Development Director Ray Caranci, Forestry Technician, Growth Management Department Stephen Mayer, Senior Planner, Growth Management Department Brad Wiseman, Planning Manager, Growth Management Department Ryan Johnson, Applicant/Agent Glenn Schwab, Owner of Building The meeting took place in the Council Chambers of the City of Palm Beach Gardens on Thursday, December 21, 2006 and started at 2:05 p.m. Purpose of the Meeting This Development Review Committee was held to review the following development application. A request by Johnston Group Land Development Consultants, Inc. on behalf of Pishon Partners, Limited Liability Company, for a Planned Unit Development petition to allow the construction of a total of 69,295 square feet of office, warehouse and storage. The 4.45 acre vacant property is generally located on the West side of Riverside Drive, South of Burns Road and North of Holly Drive. The applicant will be attending this meeting. Comments Ryan Johnson said he will submit all the plans and have them back in a week from today and plans to have everything for the January 23, 2007 Planning, Zoning, and Appeals Board meeting. The building permit will be submitted by February 15, 2007 and he wants to run it concurrently with the plans. Ryan hopes the building permit review will take about three (3) weeks. Dolores Key said that there are three different leases for the project, it is fairly substantial and it has one hundred fifty jobs. If we can't meet their specifications, they will go North. DRC Review Meeting Date: 122106 Page 1 Gardens Commerce Center Bruce Gregg provided a memo on his comments and proposed Conditions of approvals, he also stated that the relocation of the sewer line has to be permitted to be put in. Other existing customers are flowing through the system right now and will need to stay in service while we relocate the sewer line in order to move forward. Bruce said four buildings with seventy five cars on Riverside Drive will be affected and it will cause major traffic while trying to build the pipes. Ryan Johnson will reword Bruce's proposal, look into changing the site plan and look into more relocation. Stephen Mayer provided a memo on his comments Judy Dye provided a memo on her comments and wanted to make sure everybody understood the bullets. Ryan Johnson said that the building would be about half office, half industrial and will address all concerns in writing. With no further items to discuss, the meeting was adjourned at 2:50 p.m. This meeting was attended and summary minutes taken by Annette Tucci. Submitted by: 6L--, K, Ray Elli Deputy City Clerk Note: These summary minutes are prepared in compliance with 286.011 F.S. and are not verbatim transcripts of the meeting. DRC Review Meeting Date: 122106 Page 2 Gardens Commerce Center �f CA6, CITY OF PALM BEACH GARDENS MEMORANDUM TO: Judy Dye (w /attachments) Mark Hendrickson (w /attachments) Bruce Gregg (w /attachments) Julius Barone (w /attachments) Scott Fetterman (w /attachments) James Brown Todd Engle Mike Kelly Charlotte Presensky Henry DuFour Richard Kania Theresa Gonzalez DATE: December 15, 20o6 FROM: Stephen Mayer, Sr. Planner Jack Doughney Kelvin Wise Christine P. Tatum Angela Wong Mike Morrow Layle Knox Alan Boaz Dan Reidy Gerald Gawaldo Nancy Stroud Stacy Rundle Tonya Deal SUBJECT: Development Review Committee Meeting MEETING DATE: A Development Review Committee meeting will be held on December 21, 2oo6 at 2:00 p.m., in the City Council Chambers to review the following development application: Petition PPUD- 06- 03 -07: Gardens Commerce Center — Developing property as office, warehouse, and storage (TEPP) This petition has been designated as meeting the Targeted Expedited Permitting Program (TEPP). A request by Johnston Group Land Development Consultants, Inc., on behalf of Pishon Partners, LLC, for a PUD petition to allow the construction of a total of 69,295 square feet of office, warehouse and storage. The 4.45 acre vacant property is generally located on the west side of Riverside Drive, south of Burns Road and North of Holly Drive. The applicant will be in attendance at this meeting. Our office requests your participation in the review of this project. Please review this request and attend the meeting if possible, bringing written comments. If you cannot attend, please forward any comments or outstanding issues relative to the subject petition to our office. Should you have no comments, please indicate so next to your name below and forward this memo to our office. Application materials and plans for review are available in the Growth Management Department. Thank you for your ongoing cooperation and assistance. Please contact our office at 799- 4217 should you have any questions. ames Brown, Interim Building Official ulius Barone, Police Fetterman, Fire Marshall Mike Kelly, Parks Director Charlotte Presensky, Recreation Director Mark Hendrickson, City Forester Judy Dye, LBFH Layle Knox, NPBCID Jeanne Mills, PBC School Board Bruce Gregg, Seacoast Utilities Morrow, Public Works Jack Doughney, Com. Serv. Administrator Kelvin Wise, Code Enforcement Supervisor Christine P. Tatum, City Attorney Boaz, Florida Power & Light Angela Wong, Operations Manager Todd Engle, Director of Const. Services Attachment: Development Plans c: Daniel P. Clark P. E. , Interim Growth Management Administrator Stephen Stepp, Police Chief Patricia Snider, City Clerk Michael J. Sanchez, Planning Manager Jeneve Labossiere, Planning Technician Page 2 of 2 �a EXECUTIVE OFFICE December 21, 2006 Seacoast Utility Authority MP.O. Box 109002 Palm Beach Gardens, Florida 33410.9602 Mr. Stephen Mayer Planning and Zoning Department City of Palm Beach Gardens 10500 North Military Trail Palm Beach Gardens, PL 33410 RE: Gardens Commerce Center Dear Mr. Mayer: We offer the following comments on your transmittal dated December 1.5, 2006 concerning the referenced project. 1. Seacoast will require a 30' wide easement between 1 -95 ROW and Building #1 south to the change in direction of the sewer line. 2. The proposed generator location will interfere vehicular access to the sewer line. 3. Vehicular access for Seacoast must be maintained over the sewer line adjacent to 1 -95 ROW — sabal palms and shrubs will have to be shifted closer to the building. 4. The conceptual utility plan will affect tree planting in islands along the south side of property. 5. Will this property be platted? Please call if you require additional information. Sincerely, OAST U'TII.ITY C IRITY Bruce Gregg Director of Operations dp cc: Rim Bishop John Callaghan Judy Dye Jim Lance 4200 'Hood Road, Palm Beach Gardens, Florida 33410 -2198 Phone: Customer Service (561) 627 -2920 1 Executive Office (561) 627 -2900 l FAX (561) 6242839 www.sua.com V't EXECUrNE OFFICE Seacoast Utility Authority �,.O Address: o2 Palm Beach Gardens, Florida 33410-9602 Proposed Conditions of Approval — Gardens Commerce Center 1. No building permits issued until replacement gravity sewer has been installed and approved by Palm Beach County Health Department, Seacoast, and Palm Beach Gardens regarding ROW of Riverside Drive pavement/landscaping restoration, 2. No building permits issued until easements recorded at ORB 1355 Pg.456, ORB 1 549 Pg. 342, and ORB 1587 Pg. 222 are released. 3. Developer required to protect replacement gravity sewer line while project is being constructed. 4. Developer required to accommodate disruption of access to businesses on Riverside Drive during construction of sewer line— provide alternate parking /access, etc, 5. Agreement between Developer and Fine approved by Seacoast required before building permit is issued if Fine's point of sewer connection changes (not currently required). 4200 Hood Road, Palm Beach Gardens, Florida 33410 -2198 Phone: Customer Service (561) 627 -2920 / Executive Office (561) 627 -2900 / FAX (561) 624 -2839 www'sua.com OF PALM BEACH GARDENS MEMORANDUM �I Memo to File From: Stephen Mayer, Sr. Planning, Growth Management Department Date: 12/20/o6 Re: P &Z Staff DRC Comments: PPUD- o6- 03 -07: The Gardens Commerce Center Cc: Applicant Staff has reviewed the above - referenced petition and has the following comments: 1. Site design: In staff s opinion, the sidewalk along Riverside Drive should be meandering. 2. Architecture: The rooftop mounted AC units must be screened from view by I -95• In staffs opinion, the AC units should be located on the ground and may be located along the north side of building one, as they will be screened by the perimeter wall. 3. The applicant shall provide color elevations of the different color schemes prior to the Planning and Zoning Advisory Board hearing. 4. The applicant shall revise the parking calculations to reflect the required parking spaces for the ancillary office use as 1 space per 250 square feet. According to our calculations, this will eliminate the need for the additional parking waiver. 5. The applicant shall remove either sign on the south and west elevations of building one, or will be required to request a waiver for the two tenant signs. 6. The applicant shall widen the two landscape islands in the parking lot area on the southwestern portion of the lot pursuant to Section 78 -315, or will be required to request a waiver for the reduced landscape islands. 7. The previous submittal included a monument sign along Riverside Drive just south of the northernmost entrance. The monument sign is no longer on the site plan. Please indicate the location and detail of any proposed monument sign on the site plan. 8. The applicant shall modify the west end of the parking lot to meet Fire Rescue access requirements. Please see the attached configuration recommended by Fire Rescue. 9. All lighting must be metal halide with fixtures that limit the off site spillage of light toward rights -of -way and residential districts. The applicant shall respond, in writing, to the comments listed above, and submit eight (8) copies of all plans, whether amended or not, unless otherwise specified, and associated documents upon re- submittal. EXIST 14.05 °° 7.44 N 5.37 E 110 LF OF ' " PVC ©0.4% ,o 1) GENERATO�I PAD F ho �o .gyp BUILQil G #1 h. DDCV ^ �� hG METER &,XP Z b� 1-111 I« ` FDC 20.0'SUE 277 8 PVC @ 0.4 o ) 12.0' F L EASEMENT ORB. 45, PG. 357 & ORB. 89, PG. 373--,\ j(j' �, F. H. i �' �V . 1 may 1y i 1 -95 WALL O ✓ q0 .�_� `__ - - DUMPSJE9 ."may 15.0' SOU ERN BELL EASEMENT RIB. 1355, DUM STER PG. 452 EDGE OF WATER �, — W. ELEV. 7.0 Memo to File To: Stephen Mayer, Senior Planner Through: Mark Hendrickson, City Forester From: Ray Caranci, Forestry Technician Subject: PPUD- 06 -03 -07 Gardens Commerce Center Date: December 19,2006 I have reviewed the Land Development Regulations for the above referenced application and provide the following comments for the DRC meeting: In accordance with Section 78 -315 (c) of the LDR, Minimum size of landscape areas, no dimension less than five feet in width, measured from the inside of the curb. There are two parking lot islands on the south side of the property next to dumpster enclosures that are 4.5 and 4.8 feet wide. Please revise the plan to allow the minimum width of five feet for each island. 2. In accordance with Section 78- Additional open space calculations appear to be based on only 8 additional parking spaces, but should be based on total parking spaces above the actual required spaces (100 %), not the allowable excess (110 %). Please recalculate the additional open space required at 1.5 times the additional paved area. Also, where the extra open space is provided should be indicated on the plan. In accordance with Section 78 -306 of the LDR, all locations for proposed utilities, easements, underground drainage, and light fixtures shall be shown on the landscape plan to prevent possible conflicts. Based on the heavy landscaping to screen the buildings, and the limited space available to do so, there is concern that utilities may affect the placement of some of the landscaping. Please provide a letter of assurance from the utilities that the landscape plan will not change due to conflicts with said utilities. Also, please provide examples of site lighting fixtures to be installed to review for compatibility with landscaping. 4. With the two waivers requested for Section 78- 306(d), the buffers appear to still provide adequate screening for the west and southern property lines, but the views from I -95 to the west face of building three could be improved by adding more tall palms to screen the facade. In accordance with Section 78 -324 of the LDR, requiring installation and maintenance of roadway landscaping.The site could be greatly improved and beautified by adding a meandering sidewalk with additional landscaping on both sides of the sidewalk to be consistent with the sidewalk and landscaping south of the site. The applicant shall also maintain the landscaping and irrigation of the road shoulder. We support these waivers regarding landscaping buffers because there is no reduction in the required amount of landscape material, and more existing mature oaks will be preserved and used to enhance the southern buffer. The following comment is from GIS: The total open space area provided for Gardens Commerce Center is 1.59 acres or 36% which includes the detention area. The detention area is .22 acres in size. When the detention area is deducted from the total open space - 1.37 acres or 31% of open space used for landscape points is confirmed. The total amount of sod used on site was calculated at .64 acres or 27878.4 sf. The applicant is proposing to delete the amount of sod used within the detention from the sod calculations. The applicant also proposes to calculate the percentage of sod used against the total open space amount (includes detention area). The percentage of sod use should be calculated against the square footage of open space used for landscape points (59,677.2 sf). This would equate to 47% sod use on -site. 5. Please verify the correct calculations for the sod areas, and the open space used for landscape points calculations. Sod areas should be reduced to be not more than 40% of the open space. The above comments need to be addressed prior to scheduling for P &Z. Also, please understand that additional information may be requested, and staff may have additional comments as the review process continues. Lf INC. CONSULTING CIVIL ENGINEERS, SURVEYORS & MAPPERS MEMORANDUM TO: Richard Marrero FROM: Judy A. T. Dye DATE: December 20, 2006 FILE NO. 06 -4465 SUBJECT: Gardens Park of Commerce — Thies Distributing (PPUD- 06 -03- 000007) We have reviewed the following plans and information for the referenced project received December 18, 2006: • Copy of Cover Letter dated December 15, 2006 prepared by Johnston Group. • Copy of Owners Authorization Letter dated December 1, 2006 prepared by RPBG1, LLC. • Copy of Waiver Request prepared by Johnston Group • Site Plan & Details (Sheet 1 thin 4 of 6) prepared by Cotleur Hearing • Landscape Plan & Details (Sheets 5 & 6 of 6) prepared by Cotleur Hearing • Site Plan Area Calculations (Sheet 1 of 1) prepared by Cotleur Hearing • Boundary Survey (1 Sheet) dated January 9, 2006 prepared by Sunshine Surveyors CIVIL • Architectural Plan (Sheets A 1.1 a, A 1.1 b, A 1.1 c, A1.2, A 1.3 a, A 1.3b, A3.1 and AGRICULTURAL A3.3) prepared by Tercilla Courtemanche Architects. WATER RESOURCES • Preliminary Engineering Plan (Sheet 1 of 2) prepared by Smiley & Associates, Inc. WATER & WASTEWATER . Water & Sewer Plan (Sheet 2 of 2) prepared by Smiley & Associates, Inc. TRANSPORTATION SURVEY & MAPPING GIS We have the following comments: • The applicant has submitted a revised plan for the site, which includes revisions to the number and footprints of the buildings, proposed usage, the parking lot, and associated elements. The applicant is advised that we have modified the prior "Partners For Results comment memorandum to address these changes. The Not Applicable comments Value By Design" refer to issues that do not apply to this submittal and have been so noted, the Not Satisfied comments refer to materials received for this review and additional comments have been added as required by the new submittal. • We note in our review that the Wm. Thies facility may utilize all of the ancillary office square footage (40 %) as identified on the site plan. Should the office square footage be utilized in one building the remaining buildings would not be pennitted office uses during tenant improvements. Certification Issues 1. Not Satisfied. The applicant revised the boundary survey to show the dimension of the east segment of the north line of the parcel, for conformance with Section 78- 3550 S.W. Corporate Pkwy. 46 of the LDR. However, the boundary survey received for this review is not Palm City, FL 34990 signed and sealed. The applicant shall provide a signed and sealed copy in (772) 286 -3883 Fax (772) 286 -3925 accordance with Sections 78 -46 and 78 -248 of the LDR. www.lbfh.com C:ADocuments and Settings \smayerALocal Settings \Temporary Internet Files \OLK2 \4465n - PPUD- 06 -03- 000007 - Thies.doc Gardens Park of Commerce LBFH File No. 06 -4465 Comments 2 thrill 4 Previously Satisfied. Page 2 of 11 5. Satisfied. The applicant has shown, labeled and dimensioned, the easements on the revised boundary survey, site plan (Sheet 2 of 6) and engineering plan (Sheet 1 of 1) for conformance with Section 78 -46 of the LDR. Comments 6 thrill 10 Previously Satisfied. 11. Not Satisfied. The applicant labeled the drainage control structure (CS) on the plans, including the landscape plan, for conformance with Section 78 -46 of the LDR. However, a. Not Satisfied. The applicant shall remove all proposed trees, to a point outside the 75 -foot radius of the control structure, as shown on the landscape plan. b. Comment Withdrawn. Refer to Non - Certification Comment #10. c. Comment Withdrawn. Refer to Non - Certification Comment #11. d. Not Satisfied. The applicant shall label the material of all pipes on the plan view, for the storm sewer, sanitary sewer and watermain. e. Satisfied. The applicant revised the multiple details for section "E -E ". f. Not Satisfied. The applicant shall identify the control water elevation. g. Comment Withdrawn. Refer to Non - Certification Comment #13. h. Not Satisfied. The applicant shall clarify the impact from and the proposed means of handling the runoff from the contributing offsite drainage areas. The topographic information provided indicates that the subject property is accepting runoff from the areas to the north and west. i. Satisfied. The applicant revised the 18 -inch CMP pipe shown on Section "17-17" to indicate RCP under load bearing surfaces. j. Satisfied. The applicant revised Section "E -E" to reflect the relationship between the elevations shown. k. Satisfied. The applicant removed the label "Storm" under the sanitary sewer line north of the south building. 12. Conditionally Satisfied. Upon approval of the development order for this project, the applicant shall secure a "Seacoast Utility Authority Capacity Allocation Commitment for Public Water and /or Sewer Service," which shall be verified by the delivery of a fully executed copy of the document to the Planning and Zoning Division within 30 -days of granting of the development order. If the document is not submitted within 30 -days, the development order shall be automatically void and have no further effect. CADocuments and Settings \smayer \Local Settings \Temporary Internet Files \OLK2 \4465n - PPUD- 06- 03- 000007 - Thies.doc Gardens Park of Commerce LBFH File No. 06 -4465 Page 3 of 11 The applicant previously acknowledged this requirement. Please refer to Condition of Approval #11. Comments 13 thru 18 Previously Satisfied. 19. Comment Withdrawn. Refer to Non - Certification Comment #14. 20. Satisfied. The applicant identified the pavement radii for the entry area of the north drive for conformance with Section 78 -46 of the LDR. a. Satisfied. The site plan submitted for this review indicates adequate access for emergency vehicles per the above requirements. b. Satisfied. The applicant revised the curb radii at the entrances from Riverside Drive to agree with the above minimum 20 foot radii. Comments 21 & 22 Previously Satisfied. 23. Not Satisfied. The applicant identified the type of existing and proposed curb to be valley gutter on Riverside Drive on the site plan. However, a. The applicant shall identify the existing curb /gutter on the engineering plan for conformance with Section 78 -46 of the LDR. b. The applicant shall show the proposed drive entry curb connecting to the existing curb on Riverside Drive on the engineering plan. Comment 24 thru 35 Previously Satisfied. 36. Not Satisfied. The applicant shall provide a minimum of 100 feet of off - street stacking distance between the edge of right -of -way and the nearest intersecting drive aisle or parking space, for conformance with Section 78 -344 of the LDR. The applicant has indicated a reduced stacking distance of 71 -feet, which does not conform to Section 78 -344, at the northern driveway connection. Section 78 -344 indicates "At least 100 feet, or as otherwise approved by the city engineer, of off - street stacking distance shall be provided between the edge ght -of -way and the nearest intersecting drive aisle of a parking lot or location of a conflicting traffic movement." Prior to our recommendation on the applicant's request, the applicant shall provide written justification for the reduced stacking distance at the northern driveway connection. Comment 37 Previously Satisfied. 38. Not Satisfied. The applicant previously provided a photometric plan for conformance with Section 78 -182 of the LDR. However, a. The applicant is advised that the new lighting requirements are shown in Ordinance 26, 2006, see attached. The applicant shall revise the plans to conform to the new requirements for the proposed project. CADocuments and Settings \smayer \Local Settings \Temporary Internet Files \OLK2 \4465n - PPUD- 06 -03- 000007 - Thies.doc Gardens Park of Commerce LBFH File No. 06 -4465 Page 4 of 11 b. The name and address of the engineering firm responsible for the photometric data shown shall be shown on the photometric plan. c. The photometric plan shall be signed and sealed by a professional engineer who is registered in the state of Florida. The previously submitted plan was not signed and sealed. d. The applicant shall revise the plan to provide lighting levels for exterior lighting, for conformance with the requirements of Ordinance 26, 2006 and Section 78 -182 of the LDR. The applicant is advised that the ordinance also requires lighting of the pedestrian areas and therefore lighting levels shall be shown to the back of walk and for all entry walks. Comments 39 thru 41 Previously Satisfied. 42. Not Satisfied. The applicant shall revise the boundary survey, engineering plan and site plan for consistency, to show all existing intersections, driveways and median cuts connecting to the perimeter roadways, within 250 feet of the project entrance, including those connections on the opposite side of the street. 43. Not Satisfied. The applicant shall revise the site plan to ensure that proposed driveway connections are a minimum of 150 -feet from existing connections and aligned with existing connections on the opposite side of the street, per Section 78- 508 of the LDR. a. Not Satisfied. The site plan shows the proposed north driveway to be within 150 -feet of the existing driveway to the north, on the west side of Riverside Drive. b. Not Satisfied. The proposed north driveway is shown to be offset from the existing driveway to the north, on the east side of Riverside Drive, less than 150 feet. c. The applicant shall dimension the distance between the centerline of the intersection/drives and the proposed drive location, in accordance with Section 78 -508 of the LDR. d. The applicant shall revise the plan, or request a waiver from Section 78 -508 of the LDR which specifies that the separation of intersections shall be greater than 150 feet. The applicant shows the north drive within 150 feet of the drive on the east side of Riverside Drive. 44. Not Satisfied. The applicant shall prepare a plat, per Section 78 -441 of the LDR. Please refer to Condition #10. Comments 45 and 46 Previously Satisfied. C: \Documents and Settings \smayer\Local Settings\Temporary Internet Files \01-K2 \4465n - PPUD -06 -03 -000007 - Thies.doc Gardens Park of Commerce Page 5 of 11 LBFH File No. 06 -4465 45. Satisfied. The engineering plan is signed and sealed by an engineer registered in the state of Florida in accordance with Section 78 -46 and 78 -248. Additional Certification Issue comments related to the materials received for this review. 46. The applicant shall provide a revised drainage statement signed and sealed by a professional engineer registered in the state of Florida, in accordance with Section 78 -46 and 78 -248 of the LDR. The drainage statement shall state the drainage system will be designed to meet the stormwater management requirements of SFWMD, NPBCID, and the City's land development regulations, shall demonstrate the provision of a legal positive outfall meeting the adopted level of service, and shall identify the previously approved and proposed conditions and proposed land use allocations. The drainage statement shall also address the maintenance of offsite flow. The applicant previously submitted a drainage statement for the subject property. However, we note that it references "Riverside PGA Project ", while the submitted material references "The Gardens Commerce Center ". 48. The applicant shall provide a 7.5 -foot walk or wheel stops, for the area of the 18.5 - foot parking stalls, along the south side of building #1, to prevent the vehicles from encroaching into the 5.5 -foot walk, as shown. 49. The applicant shall revise the parking stalls to conform to the standard 18.5 -foot x 10 -foot stall, or request a waiver from the requirements of Section 78 -344 of the LDR. 50. The applicant shall remove the details (Sheet 3 of 6) that are not applicable to this project, such as the 10 -foot and 11 -foot parking stalls with flush sidewalk, in accordance with Section 78 -46 of the LDR. 51. The applicant shall label the wall between the south parking stalls and the Thompson River Canal on the engineering plan, in accordance with Section 78 -46 of the LDR. Waiver Requests The following waivers were requested in the materials received for the previous reviews. 1. The applicant is requesting a waiver from Section 78 -344 of the LDR, which specifies the standard 10 -foot by 18.5 -foot wide parking stall, to pen-nit 9.5 -foot width stalls. Please note we remain in support of the City's LDR requirements. Note: The applicant has not requested this waiver in the materials received for this revised submittal, although the applicant proposes 9.5 -foot stalls per the site plan. The applicant shall revise the plans, to show 10 -foot by 18.5 -foot parking spaces, or include a waiver from Section 78 -344 of the LDR, which specifies 10 -foot by 18.5 -foot stalls. C: \Documents and Settings \smayer \Local Settings \Temporary Internet Files \OLK2 \4465n - PPUD- 06- 03- 000007 - Thies.doc Gardens Park of Commerce LBFH File No. 06 -4465 Page 6 of 11 2. The applicant is requesting a waiver from the minimum required 75 -foot setback from a residential district to allow a total 63.9 -foot setback, in addition to the 100 - foot canal. Please note we remain in support of the City's LDR requirements. (Note: This is waiver request #1 in the current review submittal) 3. The applicant is requesting a waiver to for the 25 -foot landscape buffer along the west property line (east line of I -95) to permit a 15 -foot encroachment into the existing 15 -foot utility easements. (Note: This is waiver request #2 in the current review submittal) The applicant indicates that they are only requiring an additional 10 -foot encroachment as the code allows a five -foot encroachment. However, Sec. 78 -306 of the LDR refers to encroachment by utilities into landscape areas, or permitted overlap of utility easements. It does not, by right, grant the applicant the rights to those easements, as is implied in the applicant's response. Therefore, the applicant is requesting a 15 -foot encroachment over the entire existing utility easement. Please note we remain in support of the City's LDR requirements. 4. The applicant is requesting a waiver for the requirement for wheel stops for all parking stalls. The applicant request that wheel stops not be required where they have provided a 2 -foot (2.5 -foot measured from face of curb) vehicle overhang. Please note we remain in support of the City's LDR requirements. Note: The applicant has not requested a waiver from the requirement for wheel stops in the materials received for this revised submittal, although the applicant does not provide for wheel stops on the site plan. The applicant shall revise the plans, to show wheel stops for all parking spaces, or include a waiver from Section 78 -344 of the LDR, which specifies "Wheel stops, bumper stops, or non - mountable concrete curbing shall be installed within all parking spaces." In lieu of wheel stops, the applicant may utilize a type D curb and a 2.5 foot overhang area. If the parking space abuts a sidewalk, then the sidewalk shall be increased in width to accommodate the 2.5 foot overhang. If the parking space abuts a landscape area, then the 2.5 foot overhang area shall be sod only and is excluded from the open space calculations. The applicant is referred to Sections 78 -344 and 78 -315 of the LDR. The following waivers are requested in the materials received for this review. 5. See waiver #2 above. 6. See waiver #3 above. 7. The applicant has requested a waiver from Section 78 -306 of the LDR regarding the required Landscape Buffer /Easement Overlap the South Property Line. The applicant is requesting a waiver from the five -foot maximum encroachment into a utility easement to allow for a 15 -foot encroachment. The applicant indicates that they are only requiring an additional 10 -foot encroachment as the code allows a five -foot encroachment. However, Sec. 78 -306 of the LDR refers to encroachment by utilities into landscape areas, or permitted C: \Documents and Settings\smayer \Local Settings \Temporary Internet Files \OLK2 \4465n - PPUD- 06 -03- 000007 - Thies.doc Gardens Park of Commerce LBFH File No. 06 -4465 Page 7 of 11 overlap of utility easements. It does not, by right, grant the applicant the rights to those easements, as is implied in the applicant's response. Therefore, the applicant is requesting a 15 -foot encroachment over the entire existing utility easement. Please note we remain in support of the City's LDR requirements. 8. The applicant has requested a waiver from Section 78 -345 of the LDR regarding Increased Number of Parking Spaces. The applicant is requesting a waiver from the Section to allow a total of 157 parking spaces, eight spaces more than the 110% maximum of the required spaces per the LDR. Non - Certification Issues NOTE: All engineering /infrastructure plans are considered conceptual during the planning and zoning review phase and are subject to further review during the final construction review. These non - certification comments shall be satisfied prior to construction plan approval and the issuance of the first land alteration permit. 1. Not Satisfied. Prior to construction plan approval and the issuance of the first land alteration permit, the applicant shall submit drainage calculations, along with a drainage area map indicating the drainage area for each contributing structure, for the review of the City. Please note that the City requires, per FDOT standards, that the velocity for storm drainage pipes be a minimum 2.5 fps (excluding exfiltration pipe sections and equalizer pipes) and a maximum 6.0 fps (at the discharge). The minimum freeboard is 6" for local streets and 12" for arterial streets, below the rim elevation. For any lines or structures, where the city's standards are felt to be non - attainable, justification shall be provided, identifying the individual line or structure and the reason for not being able to meet the city's standards. 2. Satisfied. The applicant clarified on the engineering plan that the existing curb, through the drive aprons on Riverside Drive, is to be removed. 3. Satisfied. The applicant dimensioned the width of the existing pavement on Riverside Drive on the engineering plan (Sheet 1 of 1). 4. Not Satisfied. The applicant shall provide written authorization from all applicable utilities agencies for construction of the landscaping, light poles, or drainage facilities within their utility easements. 5. Not Satisfied. The applicant shall provide a typical cross- section of the flexible pavement areas specifying the asphalt, base and stabilized subgrade meeting the requirements of Section 78 -499, Table 41 of the LDR and indicate the structural numbers for the 'Asphalt Section' detail on the Engineering Detail Sheet for conformance with Section 78 -499 Table 41 of the LDR. The applicant shall provide a table indicating the layer, material, LBR/FBV, material thickness, FDOT layer coefficient; the SN for the pavement section, base section, and subgrade section; and the total SN for the total pavement section and the required SN for conformance with the FDOT Flexible Design Manual. C: \Documents and Settings \smayer \Local Settings \Temporary Internet Files \OLK2 \4465n - PPUD- 06- 03- 000007 - Thies.doc Gardens Park of Commerce LBFH File No. 06 -4465 Page 8 of 11 Pavement Section Table Layer Material LBR / FBV Material Thickness FDOT Layer Coefficient SN Storm Water Maintenance $ Subtotal $ Landscaping $ Irrigation $ Subtotal $ Total $ 110 % Of Total - Required Surety Is Note: Indicate whether value in LBR/FBV column represents LBR or FBV. (Min 35 FBV. Min 50 FBV required for credit) Total SN Required SN 6. Not Satisfied. The applicant shall provide a typical cross- section of the flexible pavement areas specifying the asphalt, base and stabilized subgrade meeting the requirements of Section 78 -499, Table 41 of the LDR. 7. Not Satisfied. The applicant shall provide a cost estimate for the project, including public infrastructure and all landscaping and irrigation costs for review and approval by the City in order to establish surety. The cost estimate shall be signed and sealed by an engineer and landscape architect registered in the state of Florida. Surety will be based on 110% of the total combined approved cost estimates and shall be posted with the City, prior to the issuance of the first land alteration permit. SUMMARY OF ENGINEER'S ESTIMATE of Probable Construction Costs for On -site and Off -site Public Im rovements Grading $ Sanitary Sewer $ Water $ Storm Water Maintenance $ Subtotal $ Landscaping $ Irrigation $ Subtotal $ Total $ 110 % Of Total - Required Surety Is 8. Not Satisfied. The applicant shall provide a cost estimate for the on -site project improvements, not including public infrastructure, landscaping and irrigation costs (which were previously submitted by the applicant) for review and approval by the City. The cost estimate shall be signed and sealed by an engineer and shall be posted with the City prior to the issuance of the first land alteration permit. SUMMARY OF ENGINEER'S ESTIMATE of Probable Construction Costs for On -site Non Public Improve ents Grading$ Sanitary Sewer $ Water $ Storm Water Maintenance $ Total $ CADocutnents and Settings \smayer \Local Settings\Temporaty Internet Files \01-K2 \4465n - PPUD- 06- 03- 000007 - Thies.doc Gardens Park of Commerce Page 9 of 11 LBFH File No. 06 -4465 9. Not Satisfied. Prior to the issuance of the first land alteration permit, the applicant shall provide a copy of the following approved permits, as applicable: a. SFWMD b. NPBCID c. PBC d. MOT e. PBC Health Department /FDEP f. NPDES 10. The applicant shall delineate the location and label the top of slope and toe of slope, for the detention area, on the plan view. 11. The applicant shall provide the area (sq. ft.) at the top of bank and at the toe of slope for the detention area. 12. The applicant shall label and dimension the length and size of all of proposed pipes on the plan view, for the storm sewer, sanitary sewer and watermain. 13. The applicant shall add a "Pipe Outfall - Section" detail to indicate a minimum two -foot separation between the control water elevation and top of outfall pipe. 14. The applicant shall show, label and dimension the exfiltration trench locations on the engineering plan (Sheet 1 of 1) for conformance with Section 78 -46 of the LDR. The previously received Drainage Statement and the legend on the engineering plan indicate that exfiltration is proposed. However, no exfiltration is indicated on the plan. 15. The applicant shall provide "complete horizontal control of the project sufficient to construct the project and determine the dimensions of all site improvements ", in accordance with Section 78 -448 of the LDR. 16. The applicant shall indicate the type and location of any existing and proposed signage and pavement marking on the site plan, engineering plan and landscape plan or provide a separate signing and marking plan for review. This shall include as applicable; stop sign and stop bar, handicap parking signs and pavement marking, pedestrian crossing signs, loading zone signs and pavement marking, at grade business signs, parking stall striping, crosswalk striping, directional and traffic signage (do not enter, one way, etc.), and all other- signage and marking that is proposed by the applicant for the site, in accordance with Section 78 -46 of the LDR. 17. We suggest that the applicant provide pedestrian crossing signs for the crosswalk between building 1 & 3, in accordance with Section 78 -46 of the LDR. 18. We suggest the applicant consider traffic control for the intersection of the first north/south aisle west of building #3 and the south east /west aisle, in accordance with Section 78 -46 of the LDR. C:ADocuments and Settings \smayerALocal Settings \Temporary Intemet Files \OLK2 \4465n - PPUD- 06- 03- 000007 - Thies.doc Gardens Park of Commerce LBFH File No. 06 -4465 Page 10 of 11 19. The applicant shall provide and show the location of the loading zone signage for the loading areas adjacent to buildings 1 & 2, in accordance with Section 78 -46 of the LDR. 20. The applicant shall dimension the depth of the vehicle maneuvering area, on the north end of the parking lots west of building #2 and the parking lots east & west of building #3, in accordance with Section 78 -46 of the LDR. Conditions of Approval 1. "Applicant shall copy to the City all permit applications, permits, certifications and approvals. " (City Engineer) 2. "Applicant shall provide all necessary construction zone signage and fencing as required by the City Engineer. " (City Engineer) 3. "Prior to construction plan approval and the issuance of the first land alteration permit, applicant shall provide cost estimates in accordance with Sections 78 -309 and 78 -461 of the LDR and for on -site project improvements, not including, public infrastructure, or landscaping and irrigation costs for review and approval by the City. The cost estimates shall be signed and sealed by an engineer and landscape architect registered in the state of Florida and shall be posted with the City, prior to the issuance of the first land alteration permit. (City Engineer) 4. "The construction, operation and /or maintenance of any elements of the subject project shall not have any negative impacts on the existing drainage of surrounding areas. If at any time during the project development, it is determined by the City that any of the surrounding areas are experiencing negative drainage impacts caused by the project, it shall be the applicant's responsibility to cure said impacts in a period of time and a manner acceptable to the City prior to additional construction activities. " (City Engineer) 5. "Prior to issuance of the first land alteration permit, applicant shall submit signed /sealed /dated construction plans (paving /grading /drainage and water /sewer) and all pertinent calculations for review and comment ". (City Engineer) 6. "Prior to construction plan approval and the issuance of the first land alteration permit, applicant shall schedule a pre permit meeting with City staff. " (City Engineer) 7. "The applicant shall provide a letter of authorization from the utility easement owners authorizing encroachment of the landscape buffers within their respective utility easements. " (City Engineer) 8. "The applicant shall conform to the conditions identified in the Palm Beach County Traffic Performance Standards Review, dated December 6, 2005. The applicant shall monitor peak hour traffic circulation at the intersections of Burns Road and Riverside Drive (emphasis on NBL movements) and Military Trail (emphasis on WBL movements) to identify operational problems and adequate mitigation measures. The City may require traffic studies be performed by the applicant, when in the opinion of the City Engineer, conditions warrant it. The City C: \Documents and Settings \smayer\Local Settings\Tempoiary Internet Files \OLK2 \4465n - PPUD -06 -03 -000007 - Thies.doc Gardens Park of Commerce LBFH File No. 06 -4465 Page 11 of 11 may also impose additional requirements, on the applicant and his successors, based on negative impacts created by the site. " (City Engineer) 9. "Applicant shall notify the City's Public Works Division at least 10 working days prior to the commencement of any work /construction activity within any public right -of -way within the City of Palm Beach Gardens. In the case of a city right -of- way, the applicant has at least.five working days to obtain a right -of -way permit. Right -of -way permits may be obtained at the Building Division. Failure to comply with this condition could result in a Stop Work Order of all work/construction activity within the public right -of -way and the subject development site. " (Public Works) 10. "Prior to the issuance of the first Certificate of Occupancy for the project, the applicant shall prepare a plat, which shall be approved by the City and recorded. " (City Engineer) 11. "Upon approval of the development order for this project, the applicant shall secure a "Seacoast Utility Authority Capacity Allocation Commitment for Public Water and /or Sewer Service, " which shall be verified by the delivery of a fully executed copy of the document to the Planning and Zoning Division within 30 -days of granting of the development order. If the document is not submitted within 30- days, the development order shall be automatically void and have no further effect. " (City Engineer) 12. The build out date for this project is December 31, 2008. The applicant is requested to return a copy of our comments with the applicant's acknowledgement of each comment and the response. Compliance will expedite the subsequent review. The applicant is reminded that all submittals are to be made to the City of Palm Beach Gardens Growth Management Department. JATD /mef cc: Brad Wiseman — Palm Beach Gardens (bwisemanL&pbgfl.com) Kara Irwin — Palm Beach Gardens (kirwin u) bgtl.com Ryan Johnston — Johnston Group (►Johnston (ci)lohnstongroupine.com) Don Hearing — Cotleur & Hearing (don hearingLc),cotleur- hearin corn) Mark Smiley — Smiley & Associates (infoLa)smiley- associates.com) Jay Bonner — Sunshine Surveyors (bonneriaydeb(u ) juno.com) CADocuments and Settings \smayer \Local Settings \Temporary Internet Files \01-K2 \4465n - PPUD- 06- 03- 000007 - Thies.doc INC. oDmmmm CIVIL EWANEERS, SURVEYORS &MAPPERS CIVIL AGRICULTURAL WATER RESOURCES WATER & WASTEWATER TRANSPORTATION SURVEY & MAPPING GIs "Partners For Results Value By Design" 3550 S.W. Corporate Pkwy. Palm City, FL 34990 (772) 286 -3883 Fax (772) 286.3925 wwwlbf h.com et MEMORANDUM TO: Richard Marrero FROM: Judy A. T. Dye DATE: December 20, 2006 FILE NO. 06 -4465 SUBJECT: Gardens Park of Commerce— Thies Distributing (PPUD- 06-03- 000007) We have reviewed the following plans and information for the referenced project :. received December 18, 2006: • Copy of Cover Letter, dated December 15, 2006 prepared by Johnston Group. • Copy of Owners Authorization Letter dated December 1, 2006 prepared by RPBG1, LLC. • Copy of Waiver Request prepared by Johnston Group • Site Plan & Details (Sheet] thru 4 of 6) .prepared by Cotleur Hearing • Landscape Plan & Details (Sheets 5 & 6 of 6) prepared by Cotleur Hearing • Site Plan Area Calculations (Sheet l of 1) prepared by Cotleur Hearing • Boundary Survey (1 Sheet) dated January 9, 2006 prepared by Sunshine Surveyors • Architectural Plan (Sheets. A l . la, A l . l b, A l . l c, A1.2, AI.3a, A l .3b, A3.1 and A3.3) prepared by Tercilla Courtemanche Architects. • Preliminary Engineering Plan (Sheet 1 of 2) prepared by Smiley & .Associates, Inc. • Water & Sewer. Plan (Sheet 2 of 2) prepared by Smiley & Associates, Inc. We have the following comments: • The applicant has submitted a revised plan for the site, which includes revisions to the number and :footprints of the buildings, proposed usage, the parking lot, and associated elements. The applicant is advised that we have modified the prior comment memorandum to address these changes. The Not Applicable comments refer to issues that do not apply to this submittal and have.been so noted, the Not Satisfied comments µ'refer to materials received for this. review and additional comments have been added as required by the new submittal. • We note in our review that the Wm. Thies facility may utilize all of the ancillary office square footage (40 %) as identified on the site plan. Should the office square footage be utilized in one building the remaining buildings would not be permitted office uses during tenant improvements. Certification Issues I . Not Satisfied. The applicant revised the boundary survey to show the dimension of the east segment of the north line of the parcel, for conformance with Section 78- 46 of the LDR. However, the , boundary survey received for this review is not signed and sealed. The applicant shall provide a signed and sealed copy in accordance with Sections 78 -46 and 78 -248 of the LDR. CADocuments and Settings\ctmyeAl -mal Settings \Temporary Internet Files\OLK2\4465n - PPUD4Xi -03 -000007 - Thies.doc 1 Gardens Park of Commence LBFH File No. 06 -4465 .f Comments 2 thru 4 Previously Satisfied. Page 2 of l l 5. Satisfied. The applicant has shown, labeled and dimensioned, the easements on the revised boundary survey, site plan (Sheet 2 of 6) and engineering plan (Sheet 1 of 1) for conformance with Section 78 -46 of the LDR. Comments 6 thru 10 Previously Satisfied. 11. Not Satisfied. The applicant labeled the drainage control structure (CS) on the plans, including the landscape plan, for conformance with Section 7846 -of the LDR. However, a. Not Satisfied. The applicant shall remove all proposed trees, to a point outside the 75 -foot radius of the control structure, as shown on the landscape plan. b. Comment Withdrawn. Refer to Non - Certification Comment #10. c. Comment Withdrawn. Refer to Non - Certification Comment #11. d. Not Satisfied. The applicant shall label the material of all pipes on the plan view, for the storm sewer, sanitary sewer and watermain. e. Satisfied. The applicant revised the multiple details for section "E -E ". f. Not Satisfied. The applicant shall identify the control water elevation. g. Comment Withdrawn. Refer to Non - Certification Comment #13. h. Not Satisfied. The applicant shall clarify the impact from and the proposed means of handling the runoff from the contributing offsite drainage areas. The topographic information, provided indicates that the subject property is accepting runoff from the areas to the north and west. L Satisfied. The applicant revised the 18 -inch CMP pipe shown on Section "F -F" to indicate RCP under load bearing surfaces. j. Satisfied. The applicant revised Section "E -E" to reflect the relationship between the elevations shown. k. Satisfied. The applicant removed the label "Storm" under the sanitary sewer line north of the south building. 12. Conditionally Satisfied. Upon -approval of the development order for this project, the applicant shall secure a "Seacoast Utility Authority Capacity Allocation Commitment for Public Water and/or Sewer Service," which shall be verified by the delivery of a fully executed copy of the document to the Planning and Zoning Division within 30 -days of granting of the development order. If the document is not submitted within 30-days, the development order shall be automatically void and have no further effect. CADocuments and SetungAsmayer\Local Settings \Temporary Internet Files \OLK2 \4465n - PPUD -06 -03- 000007 - Thies.doc GaTdenc Park of Commeme LBFH File No. 06 -4465 Page 3 of 11 The applicant previously acknowledged this requirement. Please refer to Condition of Approval #11. Comments 13 thru 18 Previously Satisfied. 19. Comment Withdrawn. Refer to Non - Certification Comment #14. 20. Satisfied. The applicant identified the pavement radii for the entry area of the north drive for conformance with Section 78 -46 of the LDR. a. Satisfied. The site plan submitted for this review indicates adequate access for emergency vehicles per the above requirements. b. Satisfied. The applicant revised the curb radii at the entrances from Riverside Drive to agree with the above minimum 20 foot radii. Comments 21 & 22 Previously Satisfied. 23. Not Satisfied. The applicant identified the type of existing and proposed curb to be valley gutter on Riverside Drive on the site plan. However, a. The applicant shall identify the existing curb /gutter on the engineering plan for conformance with Section 78-46 of the LDR. b. The applicant shall show the proposed drive entry curb connecting to the existing curb on Riverside Drive on the engineering plan. Comment 24 thru 35 Previously Satisfied. 36. Not Satisfied. The applicant shall provide a minimum of 100 feet of off - street stacking distance between the edge of right -of -way and the nearest intersecting drive aisle or parking space, for conformance with Section 78 -344 of the LDR. The applicant has indicated a reduced stacking distance of 71 -feet, which does not conform to Section 78 -344, at the northern driveway connection. Section 78 -344 indicates "At least 100 feet, or as otherwise approved by the city engineer, of off - street stacking distance shall be provided between the edge of right -of -way and the nearest intersecting drive aisle of a parking lot or location of a conflicting traffic movement." Prior to our recommendation on the applicant's request, the applicant shall provide written justification for the reduced stacking distance at the northern driveway connection. Comment 37 Previously Satisfied: 38. Not Satisfied. The applicant previously provided a photometric plan for conformance with Section 78 -182 of the LDR. However, a. The applicant is advised that the new lighting requirements are shown in Ordinance 26, 2006, see attached. The applicant shall revise the plans to conform to the new requirements for the proposed project. CADocuments and Setdnp\smayet\Local Settings\Tempotary Interrret Files \OLK2\4465n - PPUD- 06-03- 000007 - Thiec.doc Gardens Park of Commerce Page 4 of 11 LBFH File No. 064465 b. The name and address of the engineering firm responsible for the photometric data shown shall be shown on the photometric plan. V c. The photometric plan shall be signed and sealed by a professional engineer who is registered in the state of Florida. The previously submitted plan was not signed and sealed. d. The applicant shall revise the plan to provide lighting levels for exterior lighting, for conformance with the requirements of- Ordinance 26, 2006 -and Section 78 -182 of the LDR. The applicant is advised that the ordinance also requires lighting of the pedestrian areas and therefore lighting levels shall be shown to the back of walk and, for ali'entry walks. Comments 39 thru 41 Previously Satisfied. 42. Not Satisfied. The applicant shall revise the boundary survey, engineering plan and site plan for consistency, I to show all existing intersections, driveways and median cuts connecting to the perimeter roadways, within 250 feet of the project entrance, including those connections on the opposite side of the street. 43. Not Satisfied. The applicant shall revise the site plan to ensure that proposed driveway connections are a minimum of. 150-feet from existing ,connections and aligned with existing connections on the opposite side of the street, per Section 78- 508 of the LDR. a. Not Satisfied. The site plan shows the proposed north driveway to be within 1504eet of the existing driveway to the north, on the west side of Riverside Drive. b. Not Satisfied. The proposed north driveway is shown to be-offset from the existing driveway to the north, on the east side of Riverside Drive, less than 150 feet. c. The applicant shall dimension the distance between the centerline of the intersection/drives and the 'proposed drive location, in accordance with Section 78 -508 of the LDR. d. The applicant shall.. revise the plan, or request a waiver from Section 78 -508 of the LDR which specifies that the separation of intersections shall be greater than 150 feet. The applicant shows the north drive within 150 feet of the drive on the east side of Riverside Drive.. 44. Not Satisfied. The applicant shall prepare a plat, per Section 78-441 of the LDR. Please refer to Condition 410. Comments 45 and 46 Previously.Satisfied. C_\Documents and Settings\cmayer\Local Settings \Temporary IMemet Files \OLK2\4465n - PPUD -06 -034011007 - Thies.doc Gardens Park of Commerce LBFH File No. 064465 Page 5 of I I 45. Satisfied. The engineering plan is signed and sealed by an engineer registered in the state of Florida in accordance with Section 78 -46 and 78 -248. Additional Certification Issue comments related to the materials received for this review. 46. The applicant shall provide a revised drainage statement signed and sealed by a professional engineer registered in the state of Florida, in accordance with Section 78 -46 and 78 -248 of the LDR. The drainage statement shall state the drainage system will be designed to meet the stormwater management requirements of SFWMD, NPBCID, and the City's land development regulations, shall demonstrate the provision of a legal positive outfall meeting the adopted level of service, and shall identify the previously approved and proposed conditions and proposed land use allocations. The drainage statement shall also address the maintenance of offsite flow. The applicant previously submitted a drainage statement for the subject property. However, we note that it references "Riverside PGA Project ", while the submitted material references "The Gardens Commerce Center". 48. The applicant shall provide a 7.5-foot, walk or wheel stops, for the area of the 18.5- foot parking stalls, along the south side of building #1, to prevent the vehicles from encroaching into the 5.5 -foot walk, as shown. 49. The applicant shall revise the parking stalls to conform to the standard 18:5 -foot x 10 -foot stall, or request a waiver from the requirements of Section 78 =344 of the LDR. 50. The applicant shall remove the details (Sheet 3 of 6) that are not applicable to this project, such as the 10 -foot and 11 -foot parking stalls with flush sidewalk, in accordance with Section 78 -46 of the LDR. 51. The applicant shall .label the wall between the south parking stalls and the Thompson River Canal on the engineering plan, in accordance with Section 78 -46 of the LDR. Waiver Requests The following waivers were requested in the materials received for the previous reviews. The applicant is requesting a waiver from Section 78 -344 of the LDR, which specifies the standard 10 -foot by 18.5 -foot wide parking stall, to pennit 9.5 -foot width stalls. Please note we remain in support of the City's LDR requirements. Note: The applicant has not requested this waiver in the materials received for this revised submittal, although the applicant proposes 9:5 -foot stalls per the site plan. The applicant shall revise the plans, to show 10 -foot by 18.5 -foot parking spaces, or include a waiver from Section 78 -344 of the LDR, which specifies 10 -foot by 18.5 -foot stalls. CADocuments and 5eltingftowyer\Local $ettingffemporary Internet Res\OLK2\4465n - PPUD -06- 03-000007 - Thics.doc r . Gardens Park of Commeme LBFH File No. 06.4465 Page 6 of 11 2. The applicant is requesting a waiver from the minimum required 75- foot`setback from a residential district to allow a total 63.9 -foot setback, in addition to the 100- foot canal. Please note we remain in support of the City's LDR requirements. (Note: This is waiver request #1 in the current review submittal) 3. The applicant is requesting a waiver to for the 25 -foot landscape buffer along the west property line (east line of 1 -95) to permit a 15 -foot encroachment into the existing 15 -foot utility easements. (Note: This is waiver request #2 in the current review submittal) The applicant indicates that they are only requiring an additional 10 -foot encroachment as the code allows a five -foot encroachment. However, Sec. 78 -306 of the LDR refers to encroachment by utilities into landscape areas, or permitted overlap of utility easements. It does not, by right, grant the applicant the rights to those easements, as is implied in the applicant's response. Therefore, the applicant is requesting a 1`5 -foot encroachment over the. entire existing utility easement. Please note we remain in support of the City's LDR requirements. 4. The applicant is requesting a waiver for the requirement for wheel stops for all parking stalls. The applicant request that wheel stops not be required where they have provided a. 2 -foot (2.5 -foot measured from face of curb) vehicle overhang. Please note we remain in support of the City's LDR requirements. Note: The applicant has not requested a waiver from the requirement for wheel stops in the materials received for this revised submittal, although the applicant does not provide for wheel stops on the site plan. The applicant shall revise the plans, to show wheel stops for all parking spaces, or include a waiver from Section 78 -344 of the LDR, which specifies "Wheel stops, bumper stops, or non - mountable concrete curbing shall be installed within all parking spaces." In lieu of wheel stops, the applicant may utilize a type D curb and a 2.5 foot overhang area. If the parking space abuts a sidewalk, then the sidewalk shall be increased in width to accommodate the 2.5 foot overhang. If the parking space abuts a landscape area, then the 2.5 foot overhang area shall be sod only and is excluded from the open space calculations. The applicant is referred to Sections 78 -344 and 78 -315 of the LDR. The following waivers are requested in the materials received for this review. 5. See waiver #2 above. 6. See waiver #3 above. 7. The applicant has requested a waiver from Section 78 -306 of the LDR regarding the required Landscape Buffer /Easement Overlap "the South Property Line. The applicant is requesting a waiver from the five -foot maximum encroachment into a utility easement to allow fora 15 -foot encroachment. The applicant indicates that. they are only requiring an additional 10 -foot encroachment as the code allows a five -foot encroachment. However, Sec. 78 -306 of the LDR refers to encroachment by utilities into landscape areas, or permitted C:\Documents and Settings\smayer\Loeal Settings\Temporary Internet Files \OLK2\4465n - PPUD -06 -03 -000007 - Thies.doc Garderm Park of Commerce LBFH File No. 06 -4465 Page 7 of l l overlap of utility easements. It does not, by right, grant the applicant the rights to those easements, as is implied in the applicant's response. Therefore, the applicant is requesting a 15 -foot encroachment over the entire existing utility easement. Please note we remain in support of the City's LDR requirements. 8. The applicant has requested a waiver from Section 78 -345 of the LDR regarding Increased Number of Parking Spaces. The applicant is requesting a waiver from the Section to allow a total of 157 parking spaces, eight spaces more than the 110% maximum of the required spaces per the LDR Non - Certification Issues NOTE: All engineering/infrastructure plans are considered conceptual during the planning and zoning review phase and are subject to further review during the final construction review. These non - certification comments shall be satisfied prior to construction plan approval and the issuance of the first land alteration permit. Not Satisfied. Prior to construction plan approval and the issuance of the first land alteration permit, the applicant shall submit drainage calculations, along with a drainage area map indicating the drainage area for each contributing structure, for the review of the City. Please note that the City requires, per FDOT standards, that the velocity for storm drainage pipes be a minimum 2.5 fps (excluding exfiltration pipe sections and equalizer pipes) and a maximum 6.0 fps (at the discharge). The minimum freeboard is 6" for local streets and 12" for arterial streets, below the rim elevation. For any lines or structures, where the city's standards are felt to be non- attainable, justification shall be provided, identifying the individual line or structure and the reason for not being able to meet the city's standards. 2. Satisfied. The applicant clarified on the engineering plan that the existing curb, through the drive aprons on Riverside Drive, is to be removed. 3. Satisfied. The applicant dimensioned the width of the existing pavement on Riverside Drive on the engineering plan (Sheet l of 1). 4. Not Satisfied. The applicant shall provide written authorization from all applicable utilities agencies for construction of the landscaping, light poles, or drainage facilities within their utility easements. 5. Not Satisfied. The applicant shall provide a typical cross- section of the flexible pavement areas specifying the asphalt, base and stabilized subgrade meeting the requirements of Section 78 -499, Table 41 of the LDR and indicate the structural numbers for the `Asphalt Section' detail on the Engineering Detail Sheet for conformance with Section 78 -499 Table 41 of the LDR. The applicant shall provide a table indicating the layer, material, LBR/FBV, material thickness, FDOT layer coefficient; the SN for the pavement section, base section, and subgrade section; and the total SN for the total pavement section and the required SN for conformance with the FDOT Flexible Design Manual. CADocuments and Settings\smayeAt -ocal Settingffemporrry Internet Fdesl01_1C214465n - PPUD -06 -034)0X1007 - Thies.doc _r Gardens Park of Commerce LBFH File No. 06 -4465 Page 8 of 11 Pavement: Section Table Layer Material LBR / FBV Material Thickness FDOT Layer Coefficient SN Subtotal Landscaping rri ation total Fal % Of Total - Required Surety Note: Indicate whether value in LBR/FBV column represents LBR or FBV. (Min 35 FBV. Min 50 FBV required for credit Total SN Required SN 6. Not Satisfied. The applicant shall provide a typical cross- section of the flexible pavement areas specifying the asphalt, base and stabilized subgrade meeting the requirements of Section 78 -499, Table 41 of the LDR. 7. Not Satisfied. The applicant shall provide a cost estimate for the project, including public infrastructure and all landscaping and irrigation costs for review and approval by the City in order to establish surety. The cost estimate shall be signed and sealed by an engineer and landscape architect registered in the state of Florida. Surety will be based on 110% of the total combined approved cost estimates and shall be posted with the City, prior to the issuance of the first land alteration permit. SUMMARY OF ENGINEER'S ESTIMATE of Probable Construction Costs for On -site and Off -site Public Im rovements radin Sanitary Sewer Water Storm Water Maintenance Subtotal Landscaping rri ation total Fal % Of Total - Required Surety 8. Not Satisfied. The applicant shall provide a cost estimate for the on -site project improvements, not including public infrastructure, landscaping and irrigation costs (which were previously submitted by the applicant) for review and approval by the City. The cost estimate shall be signed. and sealed by an engineer and shall be posted with the City prior to the issuance of the first land alteration permit. SUMMARY OF ENGINEER'S ESTIMATE of Probable Construction Costs for On -site Non Public Improve nts Grading Sanitary Sewer a ter orm Water Maintenance V t otal CADocuments and Settingslsmayer\Local Settings \Temporary Internet Files \OLK2\4465n - PPUD -06 -03 7 - Thies.doc Gardens Park of Commerce Page 9 of 11 LBFH File No. 0641465 9. Not Satisfied. Prior to.the issuance of the first land alteration permit, the applicant shall provide a copy of the following approved permits, as applicable: a. SFWMD b. NPBCID C. PBC d. MOT e. PBC Health Department/FDEP f. NPDES 10. The applicant shall delineate the location and label the top of slope and toe of slope, for the detention area, on the plan view. 11. The applicant shall provide the area (sq. ft.) at the top of bank and at the toe of slope for the detention area. 12. The applicant shall label and dimension the length and size of all of proposed pipes on the plan view, for the storm sewer, sanitary sewer and watermain. 13. The applicant shall add a "Pipe Outfall - Section" detail to indicate a minimum two -foot separation between the control water elevation and top of outfall pipe. 14. The applicant shall show, label and dimension the exfiltration trench locations on the engineering plan (Sheet 1 of 1) for conformance with Section 78 -46 of the LDR. The previously received Drainage Statement and the legend on the engineering plan indicate that exfiltration is proposed. However, no exfiltration is indicated on the plan. 15. The applicant shall provide "complete horizontal control of the project sufficient to construct the project and determine the dimensions of all site improvements ", in accordance with Section 78 -448 of the LDR. 16. The applicant shall indicate. the type and location of any existing and proposed signage and pavement marking on the site plan, engineering plan and landscape plan or provide a separate signing and marking plan for review. This shall include as applicable; stop sign and stop bar, handicap parking signs and pavement marking, pedestrian crossing signs, loading zone signs and pavement marking, at grade business signs, parking stall striping, crosswalk striping, directional and traffic signage (do not enter, one way, etc.), and all other signage and marking that is proposed by the applicant for the site, in accordance with Section 78 -46 of the LDR. 17. We suggest that the applicant provide pedestrian crossing signs for the crosswalk between building I & 3, in accordance with Section 78 -46 of the LDR. 18. We suggest the applicant consider traffic control for the intersection of the first north/south aisle west of building #3 and the south east/west aisle, in accordance with Section 78-46 of the LDR. CADocuments and Settings \itnayer\Local SettingsJonpomry Internet Files \OLK2\4465n - PPUD- 06 -03- 000007 - Thies.doc Gardens Park of Commerce LBFN File No. 06 -4465 Page 10 of l l 19. The applicant shall provide and show the location of the loading zone signage for the loading areas adjacent to buildings 1 & 2, in accordance with Section 78 -46 of the LDR. 20. The applicant shall dimension the depth of the vehicle maneuvering area, on the north end of the parking lots west of building #2 and the parking lots east & west of building #3, in accordance with Section 78-46 of the LDR. Conditions of Approval 1. "Applicant shall copy to the City all permit applications, permits, certifications and approvals. " (City Engineer) 2. "Applicant shall provide all necessary construction zone signage and fencing as required by the City Engineer. " (City Engineer) "Prior to construction plan approval and the issuance of the first land alteration permit, applicant shall provide cost estimates in accordance with Sections 78 -309 and 78 -461 of the LDR and _ for on -site project improvements, not including public infrastructure, or landscaping and irrigation costs for review and approval by the City. The cost estimates shall be signed and sealed by an engineer and landscape architect registered in the state of Florida and shall be posted with the City, prior to the issuance of the f rst land alteration permit. (City Engineer) 4. "The construction, operation and/or maintenance of any elements of the subject project shall not have any negative impacts on the existing drainage of surrounding areas. If, at any time, during the project development, it is determined by the City that any of the surrounding areas are experiencing negative drainage impacts caused by the project, it shall be the applicant's responsibility to cure said impacts in a period of time and a manner acceptable to the City prior to additional construction activities. "-(City Engineer) 5. "Prior to issuance of the first land alteration permit, applicant shall submit signed /sealed/dated construction plans (paving /grading /drainage and water /sewer) and all pertinent calculations for review and comment ". (City Engineer) 6. "Prior to construction plan approval and the issuance of the first land alteration permit, applicant shall schedule a pre permit meeting with City staff. " (City Engineer) 7. "The applicant shall provide a letter of authorization from the utility easement owners .authorizing encroachment 9/'the landscape buffers within their respective utility easements. " (City Engineer) 8. "The applicant shall conform to the conditions identified in the Palm Beach County Traffic Performance Standards Review, dated December 6, 2005. The applicant shall monitor peak hour trajJic circulation at the intersections of Burns Road and Riverside Drive (emphasis on NBL movements) and Military Trail (emphasis on WBL movements) to identify operational problems and adequate mitigation measures. The City may -require traffic studies be performed by the applicant, when in the opinion of the City Engineer, conditions warrant it. The City CADocuments and Settings\smayeAl -Aval Settings\Temporary Internet Files \OLK2\4465n - PPUD- 06 -03.0(XK)07 - Thies.doc Gardens Park of Commerce LBFH File No. 06 -4465 Page 11 of 11 may also impose additional requirements, on the applicant and his successors, based on negative impacts created by the site. " (City Engineer) 9. "Applicant shall notify the City's Public Works Division at least 10 working days prior to the commencement of any work/construction activity within any public right -of -way within the City of Palm Beach Gardens. In the case of a city right -of- way, the applicant has at least five working days to obtain a right -of -way permit. Right -of -way permits may be obtained at the Building Division. Failure to. comply with this condition could result in a Stop Work Order of all work/construction activity within the public right -of -way and the subject development site. " (Public Works) 10. "Prior to the issuance of the first Certificate of Occupancy for the project, the applicant shall prepare a plat, which shall be approved by the City and recorded. " (City Engineer) 11. "Upon approval of the development order for this project, the applicant shall secure a "Seacoast Utility Authority Capacity Allocation Commitment for Public, Water and/or Sewer Service, " which .shall be verified by the delivery of a fully executed copy of the document to the Planning and Zoning Division within 30 -days of granting of the development order. If the document is not submitted within 30- days, the development order shall be automatically void and have no further effect. " (City Engineer) 12. The build out date for this project is December 31, 2008. The applicant is requested to return a copy of our comments with the applicant's acknowledgement of each comment and the response. Compliance will expedite - the subsequent review. The applicant is reminded that all submittals are to be made` to the City of Palm Beach Gardens Growth. Management Department. JATD /mef cc: Brad Wiseman — Palm Beach.Gardens (bwisemannu.nbgfl.com) Kara Irwin — Palm Beach Gardens (kirwin(Mpb>;fl:com Ryan Johnston — Johnston Group (riohnston a johnstonbroupinc.com) Don Hearing — Cotleur & Hearing (don hearing&otleur- hearint, corn) Mark Smiley — Smiley & Associates (info@smiley- associates.com) Jay Bonner — Sunshine "Surveyors (bonnerjaydeb a)'uno.com) CADocuments and Settings�smayeALocal Settings\Tempomy Internet Fi1es \0LK2\4465n - PPUD -06 -034000007 - Thies.doc CITY OF PALM BEACH GARDENS MEMORANDUM Memo to File From: Stephen Mayer, Sr. Planning, Growth Management Department Date: 12/20/x6 Re: P&Z Staff DRC Comments: PPUD- o6- 03 -07: The Gardens Commerce Center Cc: Applicant Staff has reviewed the above - referenced petition and has the following comments: 1. Site design: In staffs opinion, the sidewalk along Riverside Drive should be meandering. 2. Architecture: The rooftop mounted AC units must be screened from view by I -95. In staffs opinion, the .AC units should be located on the ground and may be located along the north side of building one, as they will be screened by the perimeter wall. 3. The applicant shall provide color elevations of the different color schemes prior to the Planning and Zoning Advisory. Board hearing. 4. The applicant shall revise the parking calculations to reflect the required parking spaces for the ancillary office use as i space per 25o square feet. According to our calculations, this will eliminate the need for the additional parking waiver. 5. The applicant shall remove either sign on the south and west elevations of building one, or will be required to request a waiver for the two tenant signs. 6. The applicant shall widen the two landscape islands in the parking lot area on the southwestern portion of the lot pursuant to Section 78 -315, or will be required to request a waiver for the reduced landscape islands. y. The previous submittal included a monument sign along Riverside Drive just south of the northernmost entrance. The monument sign is no longer on the site plan. Please indicate the location and detail of any proposed monument sign on the site plan. 8. The applicant shall modify the west end of the parking lot to meet Fire Rescue access requirements. Please see the attached configuration recommended by Fire Rescue. 9. All lighting must be metal halide with fixtures that limit the off site spillage of light toward rights -of -way and residential districts. The applicant shall respond, in writing, to the comments listed above, and submit eight (8) copies of all plans, whether amended' or not, unless otherwise specified, and associated documents upon re- submittal CITY OF PALM BEACH GARDENS MEMORANDUM Judy Dye (w /attachments) Jack Doughney Mark Hendrickson (w /attachments) Kelvin Wise Bruce Gregg (w /attachments) Christine P. Tatum Julius Barone (w /attachments) Angela Wong Scott Fetterman (w /attachments) Mike Morrow James Brown Layle Knox Todd Engle Alan Boaz Mike Kelly Dan Reidy Charlotte Presensky Gerald Gawaldo Henry DuFour Nancy Stroud Richard Kania Stacy Rundle Theresa Gonzalez Tonya Deal DATE: December 15, 2006 FROM: Stephen Mayer, Sr. Planner SUBJECT: Development Review Committee Meeting MEETING DATE: A Development Review Committee meeting will be held on December 21, 2006 at 2 :00 p.m.. in the City Council Chambers to review the following development application: Petition PPUD- 06- 03 -07: Gardens Commerce Center — Developing property as office, warehouse, and storage (TEPP) This petition has been designated as meeting the Targeted Expedited Permitting Program (TEPP). A request by Johnston Group Land Development Consultants, Inc., on behalf of Pishon Partners, LLC, for a PUD petition to allow the construction of a total of 69,295 square feet of office, warehouse and storage. The 4.45 acre vacant property is generally located on the west side of Riverside Drive, south of Burns Road and North of Holly Drive. The applicant will be in attendance at this meeting. Our office requests your participation in the review of this project. Please review this request and attend the meeting if possible, bringing written comments. If you cannot attend, please forward any comments or outstanding issues relative to the subject petition to our office. Should you have no comments, please indicate so next to your name below and forward this memo to our office. Application materials and plans for review are available in the Growth Management Department. s� Thank you for your ongoing cooperation and assistance. Please contact our office at 799 - 4217 should you have any questions. Brown, Interim Building Official Julius Barone, Police Scott Fetterman, Fire Marshall Mike Kelly, Parks Director Charlotte Presensky, Recreation Director Mark Hendrickson, City Forester Judy Dye, LBFH Layle Knox, NPBCID Jeanne Mills, PBC School Board Bruce Gregg, Seacoast Utilities Mike Morrow, Public Works ack Doughney, Com. Serv. Administrator Kelvin Wise, Code Enforcement Supervisor Christine P. Tatum, City Attorney Alan Boaz, Florida Power & light Angela Wong, Operations Manager Todd Engle, Director of Const. Services Attachment: Development Plans c: Daniel P. Clark P.E. , Interim Growth Management Administrator Stephen Stepp, Police Chief Patricia Snider, City Clerk Michael J. Sanchez, Planning Manager Jeneve Labossiere, Planning Technician Page 2 of 2