Loading...
HomeMy WebLinkAboutMinutes Council 110592�J CITY COUNCIL REGULAR MEETING CITY OF PALM BEACH GARDENS NOVEMBER 5, 1992 The Regular Meeting of the City Council of the City of Palm Beach Gardens, Florida, was called to order by Mayor Martino at 8:00 P.M., in the Assembly Room of the Municipal Complex, 10500 North Military Trail, Palm Beach Gardens, Florida; and opened with the Pledge of Allegiance to the Flag. ROLL CALL The Deputy City Clerk called the roll and present were Mayor Martino, Vice Mayor Russo, Councilwoman Monroe and Councilman Jablin. ANNOUNCEMENTS The Mayor stated the announcements were as posted on the City's Bulletin Boards. _ITEMS BY THE 'Y GER TENNIS COURTS The City Manager reported the public tennis courts were in need of repair as they are becoming a liability. Upon the recommendation of the City Manager, Councilwoman Monroe made a motion authorizing the administration to contract to resurface the public tennis courts for approximately $4,500 with monies coming from Council Contingency, seconded by Vice Mayor Russo. The motion was unanimously approved by the City Council. Councilwoman Monroe requested staff obtain an estimate to replace the lights at the public courts and make a recommendation to Council on the cost to bring the lights into good playable condition. August 19, -1992 Mr. Jeff Lis Catalfumo Construction 1540 Latham Road West Palm Beach, Florida 33409 Dear Mr. Lis: RE: Physician Supply - Demand. Study North Service Area Palm Beach County, Florida This brief report is in response to your recent telephone call requesting clarification of the Physician Supply- Demand Study I prepared for northern Palm Beach County. In November 1991, 1 was engaged to prepare a physician supply- demand analysis for • several regions of Palm Beach County. One of those regions was designated the "North Service Area ", and is the subject of this correspondence. Other than defining the geographic areas to be studied, no outside entity had input into the Study's design, data or conclusions. This Study was conducted by an independent firm (The Coker Group), without interference or bias, and utilized nationally- accepted commercial and federal data sources. Purpose of the Study, The purpose of this Study was twofold: • To ascertain whether there. existed current and projected demand for physician manpower which exceeded the present supply of physicians. • : __ To assist in planning to meet the current and future physician manpower needs- of the patient P -o pulation of northern Palm Beach County. - - -- . CORPORATE HEADQUARTERS, 3295 River Exchange Drive, Suite 430, Norcross, Georgia 30092 404/242 -0118 • FAX 404/417 -2179 WESTERN REGIONAL OFFICE, 18301 Von Karman Avenue, Suite 860, Irvine, California 92715 714/474 -1460 • FAX 714/474 -2047 - I 40 Mr. Jeff Lis - August 19, 1992 Page Qualifications The 1991 North Service Area report was prepared. under my direction. I am a physician, have earned an M.B.A., and currently serve as a Senior Vice President with The Coker Group, an Atlanta -based healthcare consulting company. In.my present position, I am in charge of all strategic planning manpower planning and medical staff development services for The Coker- Group. --In the course of my .duties, I complete numerous medical staff manpower plans of varying complexity. In the past year, I have completed a number of comprehensive medical staff manpower plans, as well as numerous short plans such as the one completed for the North Service Area. References regarding my manpower planning qualifications are available from recent . clients upon request. Data Sources The geographic area studied in the North Service Area report encompassed five zip codes.- These zip codes are located in several communities of northern Palm Beach County (Jupiter, North Palm Beach and Palm Beach Gardens). There are several industry- standard sources' of data for completing- physician supply - demand studies.--All are widely accepted in the healthcare consulting industry, and are available for general use. In the North Service Area Study, I employed two of these data sources. A summary of the data sources utilized follows: • Patient population data was obtained from the National Planning Data Corporation (NPDC), probably, the largest and best -known commercial source of healthcare data. NPDC's population data is derived from the 1990 U.S. Census, with annual updates. Physician numbers were obtained from the NPDC "MAX Area Evaluation System" database, considered the most accurate database for physician numbers by most consultants. These numbers were further adjusted • downward to eliminate non - practicing physicians. THE COKER GROUP _ Mr. Jeff L_ is August 19, 1992 Page 3 • Physician -to- population ratios form the basis for calculating the number of physicians needed for a given patient population. The ratios utilized in the North Service Area report were those supplied by the 1990 update of the GMENAC report.' The GMENAC report was produced by the United States Department of Health and Human Services, and is the most widely - accepted set of national physician -to- population ratios currently available. Methodology A step -by -step description of the methodology was included in the original Study and will not be repeated here. For informational purposes, I have included a copy of the pertinent page from the Study as "Exhibit A" at the end of this report. The following is a summarization of the methodology employed: 40 The demand for physicians within a geographic area is determined by comparing the current supply of practicing physicians against the recommended number of physicians for that geographic area's patient population. The recommended number of physicians is calculated from the GMENAC physician -to- population ratios. If the above yields more practicing physicians than the calculated demand, it is said there is a physician surplus. Conversely, if demand exceeds supply, a physician deficit exists. • ' 'GMENAC Report' stands for 'Report of the Graduate Medical Education National Advisory Committee.' THE COKER GROUP • Mr. Jeff Lis . August -19, 1992 - - Page 4 0 0 Findings The following is a summary of the pertinent findings from the North Service Area portion of the 1991 Study: • In 1991, there were 98,644 persons living in the five zip codes of the North Service Area. By 1996, it was projected that there will be 123,826 persons residing in these same zip codes. • The above represents a 25.5% increase in population by 1996. • While many specialties currently have enough physicians, using total physician numbers( practicing and nonpracticing physicians), there is a current deficit of eighteen (18) physicians in ten specialties. By 1996, eleven specialties will have cumulative deficits totaling forty -nine (49) physicians. (See attached "Exhibit B "). • Using adjusted physician numbers( practicing physicians only), there is a current deficit of twenty -seven (27) physicians in ten specialties. By 1996, fifteen specialties will have cumulative deficits totaling fifty -three (53) physicians. (See attached "Exhibit C"). • Among specialties, primary care specialties demonstrate the largest deficits. By 1996, it was projected that there would be a deficit of twenty -three (23) physicians in three key primary care specialties (family practice, OB /GYN and internal medicine). THE COKER GROUP Mr. Jeff Lis August 19, 1992 - Page 5 = Conclusions Due to substantial population growth of over 25,000 persons by 1996, the North Service Area will experience greatly increased demand for physicians. By 1996, this increased demand will lead to significant physician manpower deficits in certain specialties, if additional physicians do not establish practices in this area of Palm Beach County. These deficits will be especially acute in primary care specialties and psychiatry. It is clear from the above that long range strategic planning will be necessary to meet the health- care needs of the increased - patient population, both in regard to. additional physician manpower and new ambulatory facilities. Submitted by: Micha I C. Tobin, D.O., M.B.A. Senio " Vice President The Coker Group Atlanta, Georgia Attachments THE COKER GROUP 0 0 OUTLINE OF METHODOLOGY The analytic method.empioyed in this report fails into the general categor/ of manpower studies termed "community surplus and de fcit analysis." This tedhnique calculates current and projec:ed physic;an needs via five steps: Step One: A current population for each geographic unit is determined (zip code andlor service area aepulation). Step Two: The current "supply" of practicing physicians, by spec aity, is determined for each geocraphic unit by cotaining .^_data from any of several nationally recognized databases. Step Three: The "ideal" number of hvsicians, by seec „alty, reeuired to care for a given population Is calculated from national physician- to- poouiatien ratios. Step Four: The "estimated demand” for each specialty within a geographic unit is calculated by dividing the population by that specialty's ideal physician- to- pooulaticn ratio, Step Five: The estimated demand is compared with the current supply or physicians, and the result expressed as either a current physician manpower "surplus" or "deficit." The above Steps--are repeated. using five-year. population estimates to _obtain the "projected" surplus and deficit numbers. • z a d _ < < Z � ( C1J U J U CD N ` LL r d G7 N r w N O - -- D D z' U*) o O N r t:. LIJ < -- n < U Z D J < < 1 V; 4 C) G� to < G D L'J; u z Z C F.. < u L) C (n ^J uC- n Zr= � to O J C7 C) W N t7 N N V7 •-CON ^ O• T^ N N N I 2 `< N Cl) '' N r W Q U < u u N 1 U LU >=rL c p J � _ L D : U : V) < • q a d < Z � ( C1J F- d G7 N r w N O Z D U*) o O N r t:. N N r nZ < D J < < 1 V; 4 < G D L'J; u z Z C F.. < u L) C (n ^J Zr= � to O J C7 r- O I U Z Q U < u u N 1 U LU < c p J � _ L D : < < < I— G U o m o d LM 0 D O N T T O O U G U O ai ?. yj C. C -0 O >. C YC . •- d U C T G C- �' T N C O C N N O O` d b G !_ C_ G 6 F. • q d < Z � ( co cv d G7 N r w L O Z U*) o O N r t:. N N r nZ < C C) <UZ < 1 V; 4 Ln L'J; u Z (^ to N f°) v) - N F.. < u L) C (n ^J Zr= D J MtooC- -+O -NO ^�•- r M C.) � C.) C") ,- ^ ^ N ^ ^ LO `"• • N N O� ^ C O N- O C^ N N N U L r t:. W C < c u N U < c p � _ L O ,• Lu o m o d LM 0 te�r- O = T T O U U� O ai ?. yj C. C -0 O >. C YC . •- d C T G C- �' T N C O C N N O O` d b G !_ G 6 F. >` O Co U O b .2 - 0 r- O •. L Z u.. O m O Q C O -. r V w V E CL � V T O 7 T ii. LID C1 �^ d ;'O d ... U d N d T_ _ O d. A C O .- d d C) N 7 Q C _� d (j CO a n� <UnW U` i�� CZZO d4[i r r �J.. C C THE COKEP, GROUP i z- < N r O� ^000 O� ^OnOn VDU O�CY�o- O-- •-t�c7 N W = O N o+ ^r- oZ.- -ozmo oo ^c� pZ m Q N ^ro._ -o C o W < to < V O cl m " W — w Z. o mCq 0N0 NN nN OO ^OOV. -O ^O zg� W U J C > L U N W r- y i Q J < < O 0= fl 7 _ C _ 0 = 0 0 O V O n p^ N v z_ U.. LLU L . a �< _ _moo C3 LU Eat -_ LZo . < '� J O ... u"1 C"1 O N ••• •- p N - t3 c7 O n ^ I['1 O < - ^ W L V G 0 z Z Z r�� c� ou < i SU< C7 W V w r- T 0 N ^. 0 0^ 0 0^ O O C ^ O H O C Z } U w J '- W F- N Li O F _- .. L:.1 - - -..... -__ - _- - -_.._ _ .. O �. F' o J o > W G^ i..) O C O O - W .. .. U T r 0 0 0_ C C O C+� C' L u- ip :� •' u �' C O >, p S O L •� U O j = O O X • r n = J T P G -O •` V C, O C o> c O �' O O o C © r. G r- U <? d G r_ ci r 7 O Off ,. p o c p 4 U O L Z O LJ O G O? .0 ^ C ►- a L a. L 1 _ O t O 0 r O G m L U O F-�.• (Q OOm49N CAN C7 G7 C7NN <O W ��ZZZLddGCO C N THE COKER GROUP • Z o c N rn 1-- G CC* CD 0 Lu V.r.JN (� N L1.! y r r C7 +" CY -L7 CJ L7 ._. u7 N L7 CUZ Z w L'l SujG J T T W Z C - < n LJ L U c LU -CO ON^ -0C.) N CON N < C- Cf ^ LyQ,h. a= LO C C Z �- r U < L" J N r } c 14 v�N c u T o a a o -; —° y o �_ = Z r ES outSC7rSZZO `- C_C..a u C) o r• �- I..,:.... N O V O r 0 Z 1 U <:< L:J LU Z C)"C7 rC7 L : ^ Z ,....... U W. h ON "-O C7.- NmN N • THE CoxE7. G ZOUP Z o c N rn 1-- G CC* Lu V.r.JN (� N L1.! r. N r u7 N Z w J Z C - < n U c LU < C- m c u a= LO J o o a < c 14 T o a a o -; —° y o �_ = Z ES outSC7rSZZO `- C_C..a u C) o r• �- N THE CoxE7. G ZOUP THE COKE.? GROUP • .. - - N N c .� �. z v o o o to -- —l'.. to NN to q L7N < u C- —ZO—O zo-00-0 H t[>N ^--hNO NN 00 N � TOGA C Z U y- u _v crn^ _ U C- U7 O - w i-- U) � J < p < p a O� (D ^ZOO O Z Vr O�"OtA J U . -<N N U z O � < < . �u c) V)i rev �m C- < < J NO.. < 0C.) O N •-•- O — tD C') O h.-LO 0< 0 `tn O Of, .-r) CI N '] }, tJ O z F' Z O w < T ^U. < U C7 C) <UZ �y< '- u�o - G Mow —ZO ^o z c7^ OO'-m z C _j U N u r- N z Q w U J C N Ca C C3 U W _ C2 a 9 ; o 0 0 c o_ 0 7C3 Ei - X 7 S J P C C ?� r �� l7 P_ c U w 4 ��p' C .. ° < 7 ct G 4 V O n CD - C-- i e7 0 0 0 �� T vi G'- C O o Z:: O V. C O L ;..7+T%r2U'' Q A�QO f.. m O4� C O bi z� C- Z u C taoa cc ZC-a ca V) 00 tntacoLltac,cna1tncn O Ow t� _c.)2Zz -0 to THE COKE.? GROUP OUTLINE OF METHODOLOGY The .e analytic method employed in this repo; pails into the general category of manpower studies termed "community surplus and deficit analysis." This technique calculates current and projected physician needs via rive steps: - -- Step One: A current population 'or each geographic unit is determined (zip code and /or service area population). St-no Two: The current "supply" of pr.�c: icing physicians, by specialty, is determined for e-c.n geographic unit by obtaining data from any or . several nationally recognized databases. Step Three: The "ideal" number of physicians, by specialty, required to care 'for a given population is calc'uiate d from national physician -to- population ratios. Step Four: The "estimated demand" for each specialty within a geographic unit is calculated by dividing the population by that specialty's ideal physician -to- population ratio. Step Five: i fie estimated demand is compared with the current supply at physicians, and the result expressed as either a current physician manpower "surplus" or "der►cit." The above Steps are repeated- using rive -year population estimates to obtain the "projected" surplus and deficit numbers. 'r -7F r C%V V?. (',ROIjp Jfl0x D xo� ax _ 7 o z - 'bm an -a OF c) o. o n a D =- C3 o �. -� O O 6� o o 41 c n Q. N a a a n N > O r. O C] CD N N •— C'1 — — N — — � W W — W W — ...�Li-+ON�O n�vcnOG� cD� N > z 0 c� t n o. -C n Z 7 -I r > c c7 N r m C; n < n i _+ a c z e C. cn -4 m a (n 'v 0 c —c ...- ... m >z W N G1 W can 7 N - y z In > c�-4 W Vl N V1 zQ .ANN N O C7 N m C — ;co-3 ca �c- M�-c �N> �c� n> �NC) Z > z 0 c� t n o. -C n Z 7 -I r > c c7 N r m C; n < n i _+ a c z e C. cn -4 m a (n 'v 0 C: C: m W N O W Q m 7 CN-i > c�a - c�-4 W Vl N V1 M Z O m C — ca 0 r- �N> Z > z 0 c� t n o. -C n Z 7 -I r > c c7 N r m C; n < n i _+ a c z e C. cn -4 m a ;J C = C d(IO'dD 2t3?403 3H.L rC 0 7 7 •i1 'O r' 7 f7 O N N 47 N N N N L0 47 N O_ Z . o N C. O n H C O :3 C) Q O O > N > r a_ J. O n Z 1 _ _ •-� �� r Fl •'• '1 > .... O •O` 0000000 _ O OCO =A C O G t .. 0 f.7 —s7 N 7 _ n C - � � C7 r• o> A a r s o ao ° o° o _ o r' _ V O? O -- 0 O O ti O -� 47 v 0 N a V_ V O -•. P V ? � z Z > OOA 0 1 O.O 47-.00 0 G_?O ---- •_20�1 �t0 O a P- •- -O�-�N N aP .�'__C�. - > > 00 c �_c. -_ • N '7 C C "" n C N � U N U Ct �. � O ••• P L N N O A C C o n n ;J C = C 7 N rC �' C3 N N V N N O N �O �• N Cf � O -- O - �• O O -� O O- O _ U Z . N > N > Co-+ n > V '1 > tT - V O U G7 •+ N O -- N O v ~n 0 f.7 —s7 N 7 _ n . � � C7 r• ZAP =. _ V O? O -- 0 O O ti O -� 47 v 0 N a V_ V O -•. P V ? � z Z > ;J 7 n - G7 > C O m C C 7 V fi n C t... y C N -a M, v C -C N V N V U N NON m -' N 47 v ~n f.7 —s7 ZAP O 47-.00 0 G_?O ---- •_20�1 �t0 O a P- •- -O�-�N N aP "'Q > > • N '7 C C "" n V O U O -- � O 0 0- 0 -- � o N U Ct �. � O ••• P L N N O A C 7 n - G7 > C O m C C 7 V fi n C t... y C N -a M, v d(loxg haxoo 3f {y 0 N N cV N -+ C,30— N O M— -4L')%) -+—E7 N_+ — - W W w W — o��WOac» > C C > C C n Z p CD C7 Co NN ©N -� WO ENO Cf� -4WN OCD OCD- ri n_ C,m > �? to 7 Z n J cp > N LO y Zo> L� N O C7 C'I C ^' C.3 W .. -ENO -► W _+� (J� aa�. a z C C G 1 C N ^.c� > o N G o a O q j . Z v N � M > p a C � r � -4 O N co m 0 N N cV N -+ C,30— N O M— -4L')%) -+—E7 N_+ — - W W w W — o��WOac» co 0 0 R n c� 7 C n 7 r" O C d C N 0 C c� m > C C > C C n Z p CD C7 Co NN ©N -� WO ENO Cf� -4WN OCD OCD- ri n_ C,m > �? to LO Z n J cp > N LO Zo> N O C7 C'I C ^' C.3 W .. -ENO -► W _+� (J� aa�. N z C C G 1 C N ^.c� ,. o> > O q j . Z co 0 0 R n c� 7 C n 7 r" O C d C N 0 C c� m N '7 0 > C C NN ©N -� WO ENO Cf� -4WN OCD OCD- Z C,m LO > N LO Zo> C ^' C.3 W .. -ENO -► W _+� (J� aa�. w N w VlN -- z C 1 C N .. jOvv wq wcn v N � co 0 0 R n c� 7 C n 7 r" O C d C N 0 C c� m ciC1O2io 2i3>{Oo 3HI p '-j Z z Z� o a j O? a o a C e ^ o o q O to cn N N G7 cn cn cn Ut to p p � ; � ; - ; z -s ; C E" R V) — � v C �D a 1} n .^. n e Co o 0 Too R n fT1 Q R 4 o ��0Z0-< c� G1 -- c cn�o ��° o r) CO s70 R3 C7 o d �Go o �kSS op70? �—� •+ c o c _ 6' o • O ' G0 OQ r) g _ p CL :3 -� 0 E — iS' ? U 'J O ^ n o G o C1 K n 1 Q u d r a m c n 9 p+ co O — W _Z O -+ 0 Z O 0 W 5 _Z z 1 W -•. -1 0 0 (A > O — -• :�; O LA -- -I V> m-+f70 W_Z O—O Z— MOW W-+Gt0 OT Z O Z V to O W OI -� O -•� -+ N O W Ln N N E — — 0— M y = 0 N :2 p LO _� y1 m Z , ^, oz� C) s v � 7 JI G9 C 7 � o .l cn C rl i-<<?Z p Z1 NUtONN ONV� -- NCn _. C rn rn: =c >Ny c� Z7> C _ o� - -_ O O) — O ... N N ?• O (� N n - =c N .+N- .--O -. OIr 0rCi ", Z C/) n Z -{ C', C r- m r C C N � d Q � R n - > _5 L C Cl) --1 m C dCIO'do M3'iOD 3HI R -� -j'vZ ZZ3:r-c) -mo> 0 --- ovicncnwmmcncnc OO �- �CC'�oo�RR.�o 0 0 _ o _ — C j �d o c�—ip R? �, ? o o a n = 00 oSl c. a o pG?pA ��� —C) n 7 -• n R a PS Z -< kklj o o > - o o Z n a i - C-j n o C fl J Q x C °- CL C 7 0� o o -c tai a C C o G7 0 CL - > O v J 'v a m > cn o z cn U cn m _N J p _+cma W Z O..•O`..• Q1 OW N C7IONNONV - Nl)t Z y r = > C) Z C > j 5 7 O Z C Z W VOOfT� O-+ iO V��V O W 01... -.0-. NO W Ut z r QN� c �N o) O rl n Cr < t R ? L C N m - G !n - o U J 0 r n rn G- +OO —W_Z O—Oz— OI OW NtAO NNONV- — Ntn _.. o -n m = cry -c >N�. Z,-) > _ _ W Cf0 0 0l —ZO V b OaO�,ro NN dO .. QZQ.. -- - +Z O+ 1 i� cn 7 mj il • NORTHCORP PCD 0 MEDICAL USE AMENDMENT JUSTIFICATION Ordinance 24, 1992 November 5, 1992 • Prepared by Urban Design Studio �. DEMAND FOR HEALTH CARE SERVICES Due to the substantial population growth of over 25,000 persons by 1996, the northern Palm Beach County will experience a greatly increased demand for physicians. By 1996, this increased demand will lead to significant physician manpower deficits in certain specialties, if additional physicians do not establish practices in the northern area of Palm Beach County. These deficits will be especially acute in primary care specialties and psychiatry. It is clear from the above that long range strategic planning will be necessary to meet the health care needs of the increased patient population, both in regard to additional physician manpower and new ambulatory facilities. • In 1991, there were 98,644 persons living in the five zip codes of the North Service Area. By 1996, it was projected that there will be 123,826 persons residing in these same zip codes. • The above represents a 25.5% increase in population by 1996. • While many specialties currently have enough physicians, using total physician numbers (practicing and non - practicing physicians), there is a current deficit of eighteen (18) • physicians in ten specialties. By 1996, eleven specialties will have cumulative deficits totaling forty -nine (49) physicians. • Using adjusted physician numbers (practicing physicians only), there is a current deficit of twenty -seven (27) physicians in ten specialties. By 1996, fifteen specialties will have cumulative deficits totaling fifty -three (53) physicians. • Among specialties, primary care specialties demonstrate the largest deficits. By 1996, it was projected that there would be a deficit of twenty -three (23) physicians in three key primary care specialties (family practice, OB /GYN and internal medicine). Sources: - The Coker Group Physician_ Supply- Demand Study dated August 19, 1992 - 1990 Census data - American Medical Association National Planning Data Corporation - GMENAC: "Report of the Graduate Medical Education National Advisory Committee" 1990 update 0 1 40 SPECIFICITY OF REQUESTED USE Northcory PCD Use Request: "MEDICAL USES (all disciplines, providing multi- specialty out - patient care and surgery) including but not limited to Dental and Chiropractor offices. DIAGNOSTIC /CLMCAL FACILITIES including but not limited to: Diagnostic imaging services, such as, but not limited to, Magnetic Resonance Imaging (MRI),X- rays, CT scans, mammography and ultra sound, including diagnostic services developed through technological advancements; Clinical laboratory testing services; Outpatient procedure services; Physical and occupational therapy; and SURGICAL OR DENTAL SUPPLIES STORE (as an ancillary service to a medical use PUD and limited within such PUD to a maximum of 2000 sq. ft.) No medical office or Diagnostic Facility use shall permit overnight stays or offer services which would result in the provision of emergency room services or any other service which would result in emergency vehicle use of these facilities. In addition, no use requiring a certificate of need shall be permitted. The usage shall in no event consist of any one kind of surgical procedure, but rather shall consist of a broad range of surgical procedures performed on both males and females." By comparison, Ordinance 11, 1991 - Sumicenter PUD Use Approval: Section 1, Paragraph 2 "The usage permitted in said Planned Unit Development shall consist of medical multi- specialty out - patient care and surgery. The usage shall in no event consist of any one kind of surgical procedure, but rather shall consist of a broad range of surgical procedures performed on both males and females." • 2 is K COMPREHENSIVE PLAN CONSISTENCY Palm Beach Gardens Comprehensive Plan, Future Land Use Plan - 9/91 Policy 1.1.1.4.: The City shall review, and revise where necessary, land development regulations which provide for a Planned Community District (PCD) which shall implement the following concepts: a. The intent of a Planned Community District (PCD) is to permit a large area to be developed under one -master plane that includes different land use types at several different levels of intensity. Collector roads and development "pods" are. shown'as:part. of the master development plan. Supporting documentation is also mdluded'which describes the_ development intensities assigned to each pod and any restrictions in use or site design requirements. The pods are then developed as individual Planned Unit Developments. WILLIAM VX^Nr GEORGE W. 1Rw3.1~P4 Memorandum From Bill Brant, City Attorney, March 18, 1992 LAW OFFIOEG BRANT AND BALDWIN 330 FEDERAL HIGHWAY LAKE PARK. FLORIDA 33403 TELEPHONE (407) 845 -1700 FACSIMILE (407) 842.1548 -- - -. MEMORANDUM CHARLIIS M.. P"IT Olt CQVNSEL T0: MAYOR MICHAEL MARTINO and MEMBERS OF CITY COUNCIL FROM WILLIAM BRANT, City Attorney SUBJECT: Letter from Urban Design Studio, dated March 11, 1992, pertaining to Ordinance I, 1990, NORTHCORP PLANNED COMMUNITY DISTRICT DATE: March 18,,1992 Paragraph S Our Comprehensive,�L;and Use Plan. veryrt clear that ur►der the s 'PCDconceptheobject was to take a large area,fordevelopmentr: and develop�G same u>rider `"a' Master `Plan; wcti would include _d ffer- .:x. =ent -land:- useswithr"di£ferent levelso£'ntenaity .....;. -i. . r - .L-..y • PLANNED COMMUNITY DISTRICT ZONING Palm Beach Gardens Zoning Code Ordinance 12, 1992 Concurrence Management System Section 159.136 Definitions "PC DISTRICT." A contiguous tract of. land not less.EFa-n 40:acres in size under-' unified control.which is planned and .. improved:... Al). Tojunc,tion as a relatively self- contained'and- readily identifiable district, section, or neighborhood of the city; (2) To accommodate a wide. variety =.of uses or_ ",mix- of=_uses in a well ,planned community; - ____.___ __. (3) :._ In a_single.,development - • operation or._ programmed- series.._of _ development operations over an extended -. 'period of time according to an officially 'adopted concept plan and related program for the provision; operation, -and ;maintenance of such areas, improvements,* 'facilities and services as will be for the common use-of all residents or users of the PC,'District. ('70 Code,-App., A, Art. vII, 5 17(2)) (Ord. 4 -1979, passed 3- 15 -79; Am. Ord. 3 -1982, passed 5 -6 -82 Am. Ord. -23 -1986, passed_10 -2 -86) Section 159.139 (F) Development Standards (3) uses permitted. All uses permitted in this zoning code shall be permitted in a PC District. 0 Section 151.51 Definition of Terms Planned Community Development (PCD) A development encouraging ingenuity and imagination in the planning and development (or redevelopment) of suitable tracts of land large enough to accommodate the various uses and activities associated with a planned community under one master development plan that includes a mix of land use types at different levels of intensity. M • WIDE VARIETY OF USES OR MIXED USES is • Ordinance 1, 1990, Northcorp PCD Existing Approved Uses: S 159.089 M -1 Research and Light Industrial Park District IAt Dada Pe t.lctee. -- — - 111 Tne intent et ehL R•.a mb --- ldt 10ucation.1 •M Light Indus ttlal pert Dlst[1et 1• to institutions includ lnq dormSto[fet. provide a prot•oti•e dl,t[!ot tot a parklike development for .utu ally let Snd , I.1 u . hatmonlws industries, r arbh _ fabilitive, and educational institution,. . - primarily r arch an. a...lopmsint ..a limited manufacturing and processing ptovid d .11 .web e... r. in coordane. 111 The n tu[e sod type [ divlso a oil — standards se .tared In Industries permitted In chi. dl,trlbt •111 be geve[ned by Itm performance a t•b:sfds relating to .mote, dust, dirt, If) struetur... «n...y aM other pa[tieuiare utter[ toxic or moa1w, matter ,I: :ou, matter( to uses permitted by this division (h) he reof, including but t limited to vibretlon, not tea flre and explosion na:•rdr gieur r dlwetfve mated alsr rehouses. storage building,, and pump bwaet. electromagnetic Interference[ and stream (qt Mbes.ory u.. to us polluu art•. Dlrlslon IE) hereof sets perelt ba to tar. Nsq..h par. oJerrict�s forth tar..inimo. ntrol necemaary to prevent adverse effect of 1•na uses • eh a, : .tiomal f.elllel.s .M . dining facilities primarily for permitted !n the dts trlct o nee by ot•blt,h.d employ ploy.a, student., or faculty.. Dining property. The district !, se .• to prevld. • healthful lltio ,hall be defined ma, ' i::-ring for • eombinetion of -' 3.. A private dining invl.00m.nt ndustrial, r .•yon, .are edueetlonal facility ernes ,- * -,,red by industry. •etivttlea fart the pr ot.ctten of me.. 1 for e.'Icy..s of that industry. tb :- us • ITm the .....h...t of commercial and ... te.nii•ine... .ever.. to the alcohol to beverage, ,hall be . [ ad mI thin the dining f,b111ty except .alt . opn.. don and . pansien C sur a bination f indo.trial. Fes* ,rear. and hlch shall be cen,u.ee -)thin .duc.tio..I are to protect tar. 1.m,d the dining facility. . uses -ithln this dlatr let from the dv*,, affect. of erne: inuompa tlbl. .•t1,mgY land u:.* se r .are ,c me ,,.. t/ma co reduce place hev!nq •n / "door epublic • 9 e pe<!c . infmu. the :Influent. of the comeinetien of Industrial. . rah, and for dint" 9 c•t.ons in axe s, e! 300. one !*here . hleL Incident to tar. bus ineu edueatio .1 u unef he conduct.d.on' the bus men pre.1 •es, feed [u ld.ntl.1 and cormtteia lane Dees. and dr lob •re prepe[ed and der ved to be consumed -!thin the dining facilities. Ill R.e,e dl.trlbt regulations None) cohelie beverage• hall be ...... . intended to promote the physical •na within the d/n inq facility a eept It !)thin set,) health. safety, mor L. - elf,re, comfort, and eonvenl <nom f the bev <rages !nlen Mall he oun,umad the dining faclli ty. inh b,ta "ts of this district and us e nv iron,. Ihl aetmil s, lei nd Inot (.1 Una aM structure. .bell consumer • wire establi•hmant, Including ...house .ale•). a .....y to be used only for the foilo -tng purpose.. • ^r per mlteee n Omer than (.�� dor.o sett., dealing c. It. [al or�[.s id ends, uses, and per a bounty. or city d or operated studs : fatultytofe.- blisnments ' buildlnq• and' use.. permit led •s Pr...ip.l u that ally _ Ibl Office buildings. the commercial use all not "COPY ore than at of me tool flout a of - -- fb) eea.acbb, experimental Ill bu ildings o any lot or 9, oupr of tote)" common o- nership or testing laboratoc ids. - control. ' --- (I) (L) Warehouses se, one storage building.. Ordinance #1, 1990 Condition #21 21. The following are uses allowed with the submission of each PUD, in addition to industrial and office and other M -1 uses: (Pltase See Condition 6 for clarity) 1. Retail) Wearing Apparel Toys Sundries Jewelry C oera /Photos .Florist Gift shop Delicatessen Bakery Office Equipment Food and Drug :ales (each food or drug store shall be limited to a maximum of 5,000 Sq. ft.) 2. Service Establishments: Barber /Beauty Shop Shoe Repair taundry /ory Clearer Print shop Travel AUnty Employment Office Restaurant Mealth Club 7. Hotel /Motel - One allowed in the project, limited to A I maximum of 120 guest r0ome or suites or combination of rooms and SUIUS. t. Art Canary, Museum, Dance, Art or Music studio. S. Retail sale of beer and wine if in conjunction with restaurant or canvenlencI store. 6. Day Care Center. 7. gar /Liquor Store, *ran approved by Resolution of the City Council. 8. Laundromat 9. Car wash 50., Fraternal Organization U . Comerciat Aecreatlo,s including ancillary driving ranges. Proposed To Be Added To The Mix: MEDICAL USES (all disciplines, providing multi- specialty out - patient care and surgery) including but not limited to Dental and Chiropractor offices. DIAGNOSTIC/CLINICAL FACILITIES including but not limited to: Diagnostic imaging services, such as, but not limited to, Magnetic Resonance Imaging (MRI),X -rays, CT scans, mammography and ultra sound, including diagnostic services developed through technological advancements; Clinical laboratory testing services; Outpatient procedure services; Physical and occupational therapy; and SURGICAL OR DENTAL SUPPLIES STORE (as an ancillary service to a medical use PUD and limited within such PUD to a maximum of 1000 sq. ft.) No medical office or Diagnostic Facility use shall permit overnight stays or offer services which would result in the provision of emergency room services or any other service which would result in emergency vehicle use of these facilities. In addition, no use requiring a certificate of need shall be permitted. The usage shall in no event consist of any one kind of surgical procedure, but rather shall consist of a broad range of surgical procedures performed on both males and females. 5 COMPARABLE COMMERCE CENTERS The following approved industrial/commerce parks permit medical office uses Boca Raton • Knight Commerce Center (Zoned M -3) • Congress Corporate Centre (Located in Arvida Park of Commerce /Zoned M -3) • Boca Commerce Center (Zoned M -3) Palm Beach County • Vista Center (Zoned PIPD) • Palm Beach Park of Commerce (Zoned PIPD) Note: Medical or Dental clinic, Medical or Dental laboratory, business office and professional offices are considered permitted uses for all PIPD approved projects in Palm • Beach County. Per Palm Beach County Land Development Code (adopted June 16, 1992) Section 3.2 Definitions Medical or dental office or clinic means an establishment where patients, who are not lodged overnight are admitted for examination and treatment by one (1) person or group of persons practicing any form of healing or health- building services to individuals, whether such persons be medical doctors, chiropractors, osteopaths, chiropodists, naturopaths, optometrists, dentists, or any such profession, the practice of which is lawful in the State of Florida. Medical or dental laboratory means a facility for the construction or repair of prosthetic devices or medical testing exclusively on the written work order of a licensed member of the dental or medical profession and not for the public. R 7 INDUSTRIAL LAND AVAILABILITY _ Land Use Plan Designations Sept. 1991 Comprehensive Plan .txl:::loped Land 117 ac 0 UNBUILT/ APPROVED 847,000 s.f. ** BUILT/ OCCUPIED 473,000 s.f. BUILT/ VACANT 204,000 s.f.* * Includes 183,000 s.f. available @ Northcorp ** Includes 250,000 s.f. available @ PGA National 183,000 s.f. available @ Northcorp • 400,000 s.f. available @ Regional Center 6 8 NorthCor'p 7. Center October 19, 1992 Mr. Henry Skokowski Urban Design Studios Suite 600 2000 Palm Beach Lakes Blvd. West Palm Beach, FL. 33409 Dear Hank: In response to your inquiry regarding the vacant space here at NorthCorp. Areas Served by Overhead doors (Industrial /Whse, Mfg.) 101,786 SF Areas now demised as office and open areas with 15' . ceiling capacity. (Usable as Ind /Mfg.) 30,118 SF Areas demised as dedicated office space _511244 SF Vacant Space total 183,148 SF Hope this is what you need. Best regards, hn Tiffany • 3960 RCA BOULEVARD, SUITE 6001 PALM BEACH GARDENS, FLORIDA 33410 TELEPHONE (407) 627 -4000 FAX (407) 694 -6709 .• 11 TRAFFIC IMPACT DAVID PLUMMER & ASSOCIATES, INC. CONSULTING ENGINEERS AND TRANSPORTATION PLANNERS September 15, 1992 Richard Walton, AICP - - Planning & Zoning City of Palm Beach Gardens 10500 N. Military Trail.. Palm Beach Gardens, FL 33410 Re: Medical Offices at NorthCorn - ##92817.01 PUD 92 -08 & PUD 92 -09 Dear Mr. Walton: Paragraph 4 9 RE�FIvFO SEP 1: 6 1g2 . Total development of the NorthCorp site with 50 percent general office and 50 Percent industrial use was estimated to produce 42 PNI peak hour northbound to eastbound right -turn vehicles at the Riverside Drive /PGA. Boulevard intersection. The current proposal to allow 70,000 square feet of medical use in West Park Center would increase this volume by. 5 to 47- PM peak hour- trips. Based on studies. conducted by the applicant's . traffic consultant, approximately 62% of this right -turn volume makes a U-turn and ultimately travels westbound on PGA Boulevard. This would indicate that an additional 3 trips per hour will weave across PGA Boulevard and execute a U -turn. This does not represent a significant increase in traffic volumes during the PM peak hour. TRAFFIC CIRCULATION DAVID PLUMMER & ASSOCIATES, INC. CONSULTING ENGINEERS AND TRANSPORTATION PLANNERS September 15, 1992 Mr.- Richard Walton; AICP Planning & Zoning City of Palm Beach Gardens 10500 N. Military Trail... Palm, Beach Gardens, FL 33410 Re: Medical Offices at NorthCoro - #92817.01 PUD 92 -08 & PUD 92 -09 Dear Mr. Walton: Paragraph 6 10 REpFIVFD SEE ) As previously indicated, a critical traffic circulation issue for West Park Center and in fact this entire area is the northbound to eastbound right -turn volume from Riverside Drive to PGA Boulevard and in particular the component of this traffic that weaves across PGA Boulevard and makes a U -Turn to travel westbound. One partial solution is a future roadway extending from RCA Boulevard north, connecting currently undeveloped properties located north and south of PGA. Boulevard, and ultimately intersects with Military Trail. This roadway, which has been shown conceptually on Florida Department of Transportation plans for a PGA Boulevard/SR 811 interchange, would allow westbound traffic to distribute onto Military Trail. Preliminary estimates by the applicant indicates that an 80 foot right -of -way would be adequate for this roadway. ,o °off 1111 ( ��f Buildin j ►11111�11��11 11111 I' � L i 7w:- w ECONOMIC IMPACT Construction Jobs Generated by Northcorp Medical Development Construction (Time Frame = 18 months • 2000+ Jobs created as result of the approval of this project: Architectural drawings, site preparation, foundation construction, concrete and steel, plumbing, electrical, finishing, painting, interior design, landscape installation and maintenance to just name a few. • Additional jobs relate to the construction of the water, sewer and road work which will be created in association with the project as required under Ordinance 1, 1990 which already has bond money set aside. Permanent Jobs Generated by Northcorp Medical Development • Food service to construction workers, doctors and employees in the medical building. • Retail sales • Doctors/Nurses /technicians /assistants /office personnel • Insurance claims processors • Business services: printing, office supplies, office equipment sales and service etc. • • Public /private services: Security, trash collection • Cleaning and Maintenance companies Building Permit Fees Generated by this Project • $16,000 to $20,000+ Annual Tax Revenue Generated by this Project • $130,000 0 11 HOU -06- 02 i HI 1 16-7-5 1ID Df- DHOl)A HH� • I -ic;�• T-- - i-. "1 _ H•1' c_- Denis M. Murphy, N.V. 120 Butler Street ` West palm Beach, FL 33407 November 4, 1992 Mr. Joe Russo 16 Sholdrake Lane Palm Beach Gardena, FL 33418 Rea Amendment to Northcorp PCD e Dear Mr. Russo: Please allow me to introduce myself. My name is Dr, Denis M. Murphy and I Am a resident of the City of Palm Beach Gardena. I am an internist at Good Samaritan Medical Center, I expect to lease an office in a proposed medical building to be located in the Northcorp Center and understand that the Palm Beach Gardens City Council is prosently considering an amendment to the Northcorp Center zoning to allow medical ueein the Dark. r feel that this building presents an exciting opportunity for both myself as a resident. Qf palm Beach Gardens and the co,mmunity. Fuvthe.r, locating my practico in Palm Beach Gardens will allow me to butter treat my patients residing in the Palm Beach Gardens area (currently 25% of my patients are residents of Palm Beach Gardens) . While it ins my hope that I will be able to attet'id the City Council meeting on November 5th at which this issue will bey discussed and voted on, I am not sure if my schedule will allow my attendance. Ac�.ordingly, I wanted to write this letter to inform you of my support for this project and my hope that you will support it oleo for the benefit of all Palm Beach Gardens residents. Your attention is appreciated. DMMIam Ver rul o re, Denis M. Murphy, M.D. • Elisabeth A. McKeen, M.D. 1117 North Olive Avenue Suite 201 West Palm Beach, FL 33401 November 4, 1992 Mr. Michael Martino 320 Balsam Street Palm Beach Gardens, FL 33418 Re: Amendment to Northcorp PCD Dear Mr. Martino: Please allow me to introduce myself. My name is Dr. Elisabeth A. McKeen and I am a resident of the City of Palm Beach Gardens. I reside at 13 Marlwood Lane. I am an oncologist at Good Samaritan Medical Center. I expect to lease an office in a proposed medical building to be located in the Northcorp Center and understand that • the Palm Beach Gardens City Council is presently considering an amendment to the Northcorp Center Zoning to allow medical use in the Park. I feel that this building presents an exciting oppor- tunity for both myself as a resident of Palm Beach Gardens and the community itself since it will bring additional required cancer care services to Palm Beach Gardens. Further, locating my practice in Palm Beach Gardens will allow me to better treat my patients residing in the Palm Beach Gardens area. While it is my hope that I will be able to attend the City Council meeting on November 5th at which this issue will be discussed and voted on, I am not sure if my schedule will allow my attendance. Accordingly, I wanted to write this letter to inform you of my support for this project and my hope that you will support it also for the benefit of all Palm Beach Gardens residents. Your attention is appreciated. Very tru s, Elisabeth A. McKeen, M.D. EAM:sm • Augustin J. Schwartz, M.D. 1117 N. Olive Avenue Suite 201 West Palm Beach, FL 33401 November 4, 1992 Mr. Michael Martino 320 Balsam Street Palm Beach Gardens, FL 33410 Re: Amendment to Northcorp PCD Dear Mr. Martino: Please allow me to introduce myself. My name is Dr. Augustin J. Schwartz and I am a resident of the City of Palm Beach Gardens. I reside at 10261 Seagrape Way. I am an oncologist and Chairman of the Medical Staff at Good Samaritan Medical Center. I expect to lease an office in a proposed medical building to be located in the Northcorp Center and understand that the Palm Beach Gardens City Council is presently considering an amendment to the Northcorp Center Zoning to allow medical use in the Park. I feel that this building presents an exciting opportunity for both myself as a resident of Palm Beach Gardens and the community,itself since it will bring additional required cancer care services to Palm Beach Gardens. Further, locating my practice in Palm Beach Gardens will allow me to better treat my patients residing in the Palm Beach Gardens area (currently 25% of my patients are residents of Palm Beach Gardens). While it is my hope that I will be able to attend the City Council meeting on November 5th at which this issue will be discussed and voted on, I am not sure if my schedule will allow my attendance. Accordingly, I wanted to write this letter to inform you of my support for this project and my hope that you will support it also for the benefit of all Palm Beach Gardens residents. Your attention is appreciated. AJS:sm 0 Ver tr s, !�A Augustin J. Schwa tz, M.D. �0 I SUPPORT NEW JOBS IN PALM BEACH GA DENS On Thursday night, November 5, 1992, the City Council of the City of Prim Beach C�aOM$ 'o "I hold a public hearing to deoide whethor or not to Approve new u805 of land In the Nor €hCorp Corporate Park, wh if approved, will pave the wav for construction Of an 87,500 square foot Medical / Diagnostic Wility immediatoly south of the 1vlaarrlott. In addition, if the petitioner is successful in obtaining the new twos requested, he will build an additional 40,000 square feet of office / industrial support service spaao imtttediately to the east of the new Medical f Diagnostic facility, During the +construction period the fallowing will happen: 1) 2,000+ Construction related jobs will be created, and those people will use ex1iting retail and service businesses in the area during the 16 month construction WHOM period; 2) the ,Roadway intersection at RZ A, Blvd, and Altom4te AIR will be enlarged to relieve :• caZ. �c;3 r; and 3) new water and sewer mains .will be installed expanding existing rIt' tRts in the NorthCorp Brea, The now lk dical / Diagnostic Wility will bring over 200 permanent fblltime jobs to the Pe-Im Beach sat-dens ")rnmunity, "Chic m64n$ mpro potential customers fbr your business. If you 8, pport this type of titan growth in � oui- community, please indicate your support by signing below. l ,s��pparr lh� irat�u c f,��r�v, jc�b,s c�rrca* r1�e ,i� ►t �,►r�,wth this pro /acv r��v�la��r i,� �rrwpostr�, As u uti' air cuftet/nr. brr,rl►res's ()wn& it, t'crr►t, Beach t%rciens, J cask You to supporl their rivIOgt by volihR 17b." "' for expanding fr,se* lit Yorthcorp to Include the Afectironl Uses lie ing re- quested hP the 1wirilaricr. BY: It zee / Business Owner Ploase print name to please print come of Business if Out return feu #iii in Palm Boach Gardons • 40 SUPPORT NEW JOBS IN PALM BEACH GARDENS On Thursday night, November 5, 1902, tho City Counoil of the City of Palm Beaoh (3ardong will hold a public hearing to deoide whether or not to approve new usts of land in the NorthC.'orl) Corporate Parka wltich if approve, will pave the way for construction of an 871500 square foot Medical / Diagnostic facility Immediately south of the Marrlott, In addition, if the, petitioner is successfl:l 1n obtaining the now uses requested, by �Yill build an additional 40,000 square feet of office / industrial support service apace immediately to the tast of the new Medical / Diagnostic (acility. During the construction period the foNowing will hoppen: 1) 2,000+ coM0110ticm relatod jobs will be rereated, and these people will use existing retail and servico businesses in the area during the 18 month construction nuildout period', 2) the Roadway interse(ition at R.C.A. Blvd, and Altornoto AlA will bo enlarged to relieve congestion; and :t) now water and sewer mains will bo installod expanding existing fhellities in tho NorthCorp ores, The now Medical / Diagnostic facility will bring over 200 pormr+nen't fulltimo jobs to the Patin Beach Gardens communhy, This motans more potential customers for your business. If you support this type of clear growth in your community, please indicate yqur support by signing below. I ,support the Idea (f'neti,jabs and /ho rirw groK'th lhis prgleol develope" is proposigg' As u vulzoi andbi, bu.sluess owner Int 11cihn Beach Oardens, f tls'k )1011 to supporl their request by voting "YA" "'for expanding ttst;s° lit Arorthcorp to 1110114de the Afedlcal Uses heing requested by the pn'thione,: Our return fax it is 471 -1241 BY Citizen / Business Owner 4t.VL A1-cx t....JL. ' Please print name !p. r 0 S,_ Please print name of Business If in Palm DOA011 Gardens T '-d CS1?6TZ'r_ 007— H3U39, W-10d iS3M SnIdU 8 :TT r.. SO f (DH I SUPPORT • NEW JOBS IN PALM BEACH GAIaDENS PO`1,h,N'1'IA1, FOR 200 PERMANENT .1O11S IN AREA WITH APPROVAL, On Thursday night, November 5, 1992, 1110 City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land III the NorthCorp Corporate Park, \which if approved, will pave the wily Jot' consU-(ICtlon ol• an 87,500 sq1.1a1'0 loot Nledical / Diagnostic lacility immediately south 01'111e Marriott. In addition, iftlle petitioner is successful in obtaining the new uses requested, he will build an additional 10,000 square feet ol'O ice / industrial support service space immediately to the east ol'the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000 -1 construction related jobs will be created, and these people will use existing retail Mid service businesses in 010 area (luring the 18 month construction buildout period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve . congestion-, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. Tile new Medical / Diagnostic Iacility will bring over 200 permanent tulltime jobs to die Palm Beach Gardens colmnUnity. This means more potential customers 101- your business. 11' you Support this type of' clean growth in your. community, please indicate your support by signing below. 1.�rr /� /�c�r! the icic cr c,/ i�(1i juh.� iuicl !!rc i�c ►i sr� c�r1 l {i lhis prujc c.I c %► c lu/�cr i.� /�r(� /�n.�iir�•. As a ciliZell (11111 %or bus•ille.ss on,ner in /'(r /1n Beetch Carden.\•, / c1.s•/r you Io supporl I/leir reque.vi h), volhl q 'T1,,'S ", /i)r exp(inding uses in Norlhemp to include the Nledic(1/ Uses heing reque.s•led by the pe/ilioner. BY: iti .er1 / P3(tsiness wner = -A --ems Y1 A, u 4e, I Ase print name Please print name ol'Busin6ss if Our return lax // is 471 -1201 in Palm Beacli Gardens Y SUPPORT NEW JOBS IN PALM BEACH GARDENS I' )TENTIAL FOR 200 ]PERMANENT JOBS IN AREA WITH APPROVAL On 'Thursday night, November 5, 1992, the City Council of the City of 1',1lm Beach Gardens will 1101(1,1 public hearing to decide whether or not to approve new uses of land in the NordWorp Corporate Park, which if approved, will pave the way for Construction ofan 97,500 square toot Medical / Diagnostic titcility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet ofollice / industrial support service space immediately to the east of the new Medical / Diagnostic facility. Uuring the construction period the following will happen: 1) 2,0001 construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month Construction buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new N/ledical / Diagnostic Ilhcility will bring over 200 permanent fulltime jobs to the P,dm Beach Gardens commU111ty. This means more potential CUS1OInerS 101' yOUr bIIS►ness. If you support this type of cled,ln growth in your• community, please indiedttc your support by signing below. I .,a pport the ieleu e ff ijeujoh.v am/ /he lieu, grolrlh 111i.v project developer i.v propo.ving. A.v (r cili-eii aml,"or hiahie.v.s• mover hi helm lieoch Garden.v, l u.i•% you it) .v ppor/ ilteir reque.vt by volhig "YA'S " /in. exp(m liu/,, nse.v hi Northcoip to inelude the Alledicerl U..ve.v heiiW reque.vied by the pelitioitcr. Citizen / 131.1siness Owner Please print name Please print name of Business if Our return fax /i is 471 -1201 in Patin Beach Gardens .., FAX 4074718783 CATALFUMO CONST !t 44 ` / SUPPORT NEW JOBS ITT PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Pitrk, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction relatcd jobs will be created, and these people will use existinS retail • and service businesses in the area during the IF, month construction huildout period; 2) the Roadway intersection at R.C,A, Blvd. and Alternate AiA will be enlarged to relieve congestion; and 3) new water and Sewer mains will be installed expanding; existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. if you support this type of clean growth in your e mmunity, please indicate your• support by signing below. I support /he is ea of iwijJohs unc/ the neil, gro►wh this project tie velopel' is prupnsing. As 17 ciliZen a►u.l•'ol, husineS:S owlier• in palm Leach Gardens, 1 ask you re► support their request by V(Nittg T S,S'" fUr f'YI anding use,S it, %%orlhcotp to include 1lie /14l1G'/ical Uves being requested by they petitioner. • Our return fax # is 471 -1201 Citizen / business Owner Please print name Please print name of Business if in Palm Bcach Gardens Pi►2 I • SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PIAZMANI-i:N'1' JOBS IN AREA WITH APPROVAL. On 'Thursday night, November 5, 1992, the City Council 01' the City of Pain) Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction ol'an 87,500 square loot Medical / Diagnostic facility immediately south ol'the Marriott. In addition, il'the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet o1'otlice /industrial support service space immediately to the east ol'the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000 -1 construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction bLllldoll( period'- 2) the • Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent tulltirne jobs to the Palm Beach Gardens community. This means more potential customers for your business. I f you support this type of* clean growth in your community, please indicate your support by signing below. l supporI the is %ct a / I/el vjohs cuu! Me rte it tri•oivlh / /ria deI- e!llper i.v proposili . As t ciier lcl n hsilte�� ruc! ilr ltlu l ! �pries, l u�% you lu �l//�l I lle iri regne.y1 by volhuq "Yl:S" Ibr expmulillg us•e.v in Norlhemp lo include the Alledicid IJ.ve.v heinir requesled h,, the pelirouer. BY AIC17-en- Business 9wwner lnfAh7,2e'S J .11je Af71,9nt2_/r'S Please print name • Please print ►�f Business 11' Our return faX ii is 2171 -1201 in Palm Beach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square loot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000-+- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AI A will be enlarged to relieve congestion; and 0 new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent tulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. l srrhhorl the idea c�/ ne►i jc�h.� arrc! !hc ite►i grn►� lh this project clevelopei is pro��c�.�iitg. AV u eilizerr tmtkor busine.v.v oijwer in Palm Beach Gardens, l crslc yorr to !heir regnesl by volitrg "YL..S "' for experrndi>rg u.ves• in Norlheoip to inelrrile the Medical U.ve.v being r•eque.vlecl b>> the petitioner. BY: i " ) k , Citizen / Busin ss wn , es Please print name • Please print name of Business it' Our return fax # is 471 -1201 in Palm Beach Gardens 0 SUPPORT NEW JOBS IN PALM BEACH GARDENS POTIIINTIAL FOR 200 PERMANt NT J011S IN AREA WITH APPROVAL On 'Thursday night, November 5, 1992, the City Council of tiie City of Palm Beach Gardens Will hold a public hearing to decide whether or not to approve new uses of land in the North('orp Corporate Park, which if approved, will pave the way 1,61. construction ofan 87,500 square loot Medical / Diagnostic lacilily immediately south ol'the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square IM of office / industrial support service space im►r►ediately to the east ol,the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000-1 construction related jobs will be created, and these people will use existing retail and service: businesses il► the area during the 18 month construction buildoUl period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. 11' you support this type of clean growth in your• community, please indicate your support by signing below. l .vipp rt the iced of iielijohs emel the 11c►►) grotrll► lhi.s'projec.•l developer is proposing. Av el cilizeit mill or hii.v'ille,v's o►i'hiCr iii /'ei/iii Beiich (14(11•elenv, / u.vk you to sii/)horl /heir reglfe.vl h)) volilT " }' / "V Jin. e xpuldhig ii.ve.v m Nor/hcoi j) to inchide the Aki icul 0-ve.�' being regiiesle d by Me pelilioner. IN 015r BY: Citizen / Business Owner Please Print name C - C1 S' Please print name of Business if Our return IaX ll is 471 -1201 in Palm Beach Gardens _ Z_ 5 �� FAX 4074718783 CATALFURO CONST � I St PI'ORT NEW JOBS 0 IN PALM BEACH GARDENS F . O l' to IR 200 PERMANENT- s A W T >PP QVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will held a public hearing to decide whether or not to approve new uses of land in the NotthCorp Corporate Park, which if approved, will pave the way for construction ol'an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, il'the petitioner is successftil in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: t > 2,000+ construction related jobs will be created, and these people will use existing retail end service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.('.A. Blvd. and Alternate A 1 A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorlhCorp area. "I he new Medical / Diagnostic facility will bring over 200 permanent Ultime jobs to the Patin Leach Gardens community, This means more potential Customers l'or your business. If you support this type of Clean growth in your community, please indicate your support by signing below. I stippurt the idea gfneiv.jobs atn!the new Kron,th this pt-c eci cleveloper isl7roposing. As ri twizen ctrrdlot, brisinecs ouwer In i'crhtt Beach t'_ mWerts, I ask year to wpporl their request by voting "YL'S m, expcntding tt.tes lit Nctrthcorp to Inchale the Medical (Aes hah regrre.>red by r1l,* peirif; 'U B'Yt (A ia - ( Citizen, Business Owner Please print name Please print name of Business if Our return fax 0 is 471 -1201 in Palm Dcach 0arderns P02 lu 0 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marion. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AI A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. 1 support the idea of new jobs, and the neu, growth this project developer is proposing. As a business owner in Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcor7) to inchide the Medical U.ves being requested by the petitioner. 1, Ail W. Owner 0 9 t. i FRiJM 9. 3.1987 3:44 F. 8 SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL, FOR 200 PERMANENT JOBS IN AREA,WITH APMVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if Approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott, In 8dditiOn, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square Feet of office / industrial support service space Immediately to the cast of the new me.dicAl / diagnostic facility, During the construction period the following will happen: 1). 2,0001- construction related jobs will be created and these people will use existing retail and service bu4inesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.," Blvd. and Alternate AIA will be enlarged to relieve congestion; 31. new water and sewer mains will be installed expanding existing facilities in the Nwilicorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This rneans more potential customers for your business. If you support this type of cleat growth in your community please indicate your support by signing below. I.srrpport the icfea ref mm, obs, curd the neiv growth this project dvveloller is pr01r0,019. As a hli.si►te,ss owner in Palm Beach (;arden.v I ask yon to s-ril)l)nrt their reque-91 by votlrtg "YFS"for' exInvidlrrg ttyvs ir► Northemy) to h►Clutle the Medical (Ives being requested by the pelltioner. Citizen / Br . ' ess Owner • I SUPPORT NEW JOBS 10 PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square (loot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: is 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: Resident E From ; (w ofs 7 " 0 0 ACT I �)E ALARMS /GOUFJ)* SAFE a LOCH; VP4�e &vk 10 43(17 A07 ( 40 7) 564- -`.,:34 r 0 SUPPORT NEW JOBS IN PALM BEACH GARDENS 14 MOO On Thursday night, November 5, 1992, the City Counoil of the City of Palm 9e40lt Oardens with hold a l)ublio hrering to deoide whether or not to approve new uses of lend in the NorthC'orp CorporMe Park, which if approved, will pave tho way for construction of an 87,500 square foot Medical / Diagnostic thoility immediately sputh of the Marriott, 7n addition, If the petitioner iA sucaossfb1 in obtaining the new vs ®s mquested, ho will build an additional 40,000 square feat of office / industrial support owice spaos Immediately to the east of the new Medical / Diagnostic facility, Dming the construction period the following will happen: 1) 2,000+ construction rclatod jabs will be croated, aild these people will use existing retail ,sad service businesses in the area during the 18 month'construction bmildout period; 2) the ,Roadway intersection at R.C,A Blvd, and Alternate AIA will be enlarged to relievo congestion-, and 3) new water and sewer mains will be installed expanding existing facilities In the NorthCorp area, Tiro new MmIlcoi / 066nosiiw fkJIliy will 60'rn$ uvcr 200 permanent fulltihio jobs t6 th6 Palm Boacli Gardena community, Thit moans more potential oustomors for your bu$incss. If you support this type of elean growth in your community, please indicate your support by signing below$ I support the /dou r j'new job,v and ffic� )tow grow /h this prglool develupifr, is proposing. As u vitizen and%or business owner trr t'crlrn Beach OarcAr X, r cask yotl ro Support their tequest by voting „YE' "", for expanaing uses In Northcorp to Include the Medical Uses hauls requested by the 1,etidono r, BY; Citizen 1 Business Owner Our rbt►Arn fhx # is 471 -1201 Please print name IWC 46'Qg'y 6A cc C.Slo 'Irr Please print name of lausinesu if in Pitim Do%oh Oardens �t F FROM H 'STEVEN R! =D_K MD PPR T .;, °r� c11.,11 S UPPORN" • NEW JOBS fN 0 PALM BEACH GARDENS P, 0TE T1AL F'Uiq _00PC, RMANENT JO IN ADVA Will On Thursday night, November 5, 1002, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve now uses of lard in the NorthCorp. Corporate Park, which it`approved, will pave the way for construction of an 87,soo square l'cxit Medical I l: jhgllosti,: facility immediately south of tine Mariotl. In addition, irthe petitinner is successrul in obtainh% the new uses requested, he will build an additional 40.000 square feet of ofFiCe / industrial support service space immediately to the cast of the new tttedleal k,. 'gnostic fac:ilily During the Construction periotf the following will happen: 1). 2,000+ construction related jibs will be created and these people will use existing retail and service businesses in the area ClUrinb the 18 mahths construction bufldout period; 2). the Roadway intersection at R C'.A. Blvd. and Alternate AIA. will be enlarged to relieve congestion; 3 }. new water and sewer mains will be installed expanding existing facilities in the Nonhcorp Brea. The new Medicat / Diagnostic tAcility will tiring over 200 permanent fulltime jobs to the Palm Beach Gardens Community, This incans more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below, I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include th* medical Uses being requested by thq petitioner. BY% J r ik e*-s -- W e n t Ynr�± P.01,,11 0 0 n U I SUPPORT NEW JOBS PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorh Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildOUt period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this tyre of clean growth in your community, please indicate your support by signing below. l srrpport the icleo of*rne If jobs mul the ne►i, gr-o►i,lh Ihi.vhrojecl developer- is prolnos•ing. Av ti citizen wittlor (m.vine.v.v o►vner• hi l'ctlrrr Betrch Car len.v, I ask you to .vrrpport their request by volirrg "}'L'.S "' Jor expanding rr.ve.v in Northeor j) to include the Methcal U.ve.v being regxe.vlecl by the petitioner. BY: CitIzenALISIness Ow r Our return fax I/ is 471 -1201 Flease' VXnt name Please print name of Business if in Palm Beach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS F'OTF,NTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, ifthe petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000 -1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I swppolY the itlell ()/ lie Il jobs and the lie IN gi-oulli Ihis project tlevelol)er- is proposing. As u cilizeli antl%or hiisiness oiiwer iii Palm leach Qu- (Ien.S', I ci.vk yon to siipporl lheil- requesl by voling "YE'S" for expclnding iise.v hi Noi•ihcotp to inchiele the Medical Uses being requeslecl b), the pelilionel -. BY: (2 Citizen / Business Owner Please print name • 1,��SGpr�"� �0,�77/�i.-- r/��rl �_� C ©v�lTy �ssocir� T Please print name of Business if Our return fax ## is 471 -1201 in Palm Beach Gardens N.0 V 4— 5 2 WED 1 5 :'54 C A T A L F U M Q P. 02 F1 .SUPPORT NEW Y JOBS HVI POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROYAIL On Thursday night, November, S, 1992, the City Council of the City of Palm Beach. Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. in addition, if the petitioner is successfial in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,0004- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month constriction buildout period; 2) the Roadway intersection at R.C.A. Blvd, and Alternate A1A will be enlarged to relieve congestion, 3) and new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community, This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 support the idea of n 3V fobs co?d the i]ew growth Ihic project developer is proposing. A.5 a business owner in Palm Reach Gardefl4c, I ask you to ,support theb- request by voting "YES" for eXpancling li.vos Ill Northcorp to incltlde' the Medical Uks being requested by the petitioner. -- BY: XXOMN A-/ Business Owner ~ - DOWDELL BROWN, PRESIDENT • Please print name MOBIL LAND DEVELOPMENT (FL) CORPORATION Please print name of Business if Our return fAx 9 is 471 -1201 "' in Palm Beach-Gardens FAX 4074718783 CATALFUHO CONST • I ST.J PORT NEW JOBS IN PALM BEACH GARDENS PQ3:LN_JJAL FUR 200 PERMANENT J BS IN AMA PP On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction ot'an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, ifthe petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: • 1) 2,000+ constriction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A, Blvd. and Alternate AIA will be enlarged to relieve congestion; and .1) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / diagnostic facility will bring over 200 permanent fulltime jobs to the Nbit Desch Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below, l .support the idea of tie►+Jobs and the neap- owi -th thisnrrjecl tleveloper is proposing. As it cilium urtdiur buviies.s' o►fv►er /it Pa /r►► Beach C.rardens, I ask. jwrt to .s7 1!)port their request by voting "YES" fior expanding tt.ses In 1Vorthcorp to ittelude the Medical Uves being requested by the petitioner. BY: izen / Business Omer Please print name P02 Please print name of Business if Our return fax ft is 471 -1201 in Palm D040 Oardens is r' • • 11 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT .1O11S IN AREA WITH APPROVAL. On 'Thursday night, November 5, 1992, the City Council 01'111C City 01' Palm Beach Gardens will hold a public hearing to decide whether 01' not to approve new uses of' land in the NorthCorp Corporate Park, which if approved, will pave the way liar construction of an 87,500 square IM Medical / Diagnostic facility immediately south of' the Nlarriolt. In addition, il'lhe petitioner is successful in obtaining the new uses requested, he will build an additional 110,000 square 1'eet oPoffice / industrial support service space immediately to the east ol'the new Medical / Diagnostic Facility. During the construction period the following will happen: 1) 2,000-1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the IS month construction bulld0u1 period; 2) the I:oadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion-, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent tullunie jobs to the Palm Beach Gardens c0nununi(y. This means more potential customers for your business. It' you support this type of clean growth ill your• community, please indicate your support by signing below. l . vtpporl late ie let i o/ tteir_lob.y clttcl the Ilea- srro►rllt 111i.v project Ile veloper i.s. propo.s.h1 g. Av it cili-eii UIKI'or bu.vijte.v.%- ou tier tit I ulm Reach Gareletty, I tiA yeti to m1pporl Iheir reque.yl by volhT '77' a` Ibr expa jdit g ttse.v in Norlhcoip to hichtle the Allecicul I.Jve.r beingreltte.rlel by Ille pe liotter. Our return Pax 11 is 471 -1201 Citizen / 136siness Owner Please print name Please pj/1jq name of Business it' in Palm Beach Gardens SUPPORT NEW JOBS fN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the Northcorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south_of tl.e Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion, 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: 0-0& &,— Resident • I • SUPPORT NEW ,YOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City ,Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not. to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility, immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the .Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve 11• congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. if you support this type of clean) growth in your community, please indicate your support by signing below. I.support the idea oj'new jobs and the neiv growth this project developer is proposing. As u citizen anciOr business owner in 11cilfn Beach Gardens, I ask you to support their request by voting "YAS", for expanding rises in Nvrthcorp to include the Medical Uses being requested by the petitioner. BY: Citizen / Business Owner 'S�c1UP Please print name Please print name of Business if Our return fax If is 471 -1201 in halm Beach Gardens SUPPORT NE''V'V JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL. On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if Approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. , During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; 3).. new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. 1 snpporl the idea c f ne }v jobs, atrd the tiriv gro►vlh /his project developer is proposing. As a business ouwei- in Palm Beach Gardens I ask yon to support !heir request by voting "YEY' for expamlitig uses iit ,Norlhcorp to i»clude the Medical Uves being requested by Ilre pelitivnc�r. B tizen / usiness Owner 0. � . I SUPPORT NEW JOBS [1-621 PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction o('an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: . 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY • i �CA(0'e "�-7 Resident • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A'1 A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fuiltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of ne►►Job. •, and the ne►r, lrr•owth this pi-( jest developer is proposing. As o business owner in Pain Beach Cai•c %ns ".Vk you to sup their request by voting "YES" for expanding uses in Northeolp o 'nc ude h d' ! (. -es being requested by the petitioner. 0 BY: K r►t►z n Business Owner f • • • 11 SUPPORT NEW JOBS W PALM BEACH GARDENS ]POTENTIAL FOR 200 1 "ERIVIANEN`I' JOBS IN AREA WITH AITIM On Thursday night, November 5, 1992, the City Council of the City Of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land III the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square toot Medical / Diagnostic facility immediately south of the NlArriott. !n addition, if the petitioner is successliul in obtaining the new uses requested, he will build an Additional 10,000 square feet 01'otlice / industrial support service space immediately to the cast of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000 -1 construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construcliorl bulldllu( period; 2) the I:o,ulway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent tulllime jobs to life Palm Beach Gardens COn11n11111ty. This means more potential customers for your business. ll' you Support this type of clean growth in Your community, please indicate your support by signing below. l .wupporl lie h1co o /'nelr jobs uuul Ilia Heir f,Jro►rlh lhi.v pipjecl de vloper i.s. proposing. Av u ciliZeuu mul'or business imwer ill l'ulm Beuch Cordleav, l uxlc you to s upporl /heir request h), voling "? ES" %or e.eponcling use.v in Norlhcotp to include life Medliced Uve.v hehT requesledl / y the pe ilivmer. Our return lM // is -171 -1201 BY: -- -- CItIz / Business Owner j �0 P.- jv► (k 1- Please I r1 it na►ne Please print name of Business if in Palm Beach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTh.NTIAL FOR 200 1 "EAMIANG:NT .10135 IN AREA WITI -1 APPROVAL. On Thursday night, Noven ber 5, 1992, the City Council of the City of Pfllm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthC'orp Corporate Park, which if approved, will pave the way 1,61. construction ol'an 87,500 square foot Medical / Diagnostic facility immediately south of' the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 410,000 square feet of ollice / indushfial support service space immediately to the east ol'the new Medical / Diagnostic Facility. During, the construction period the following will happen: 1) 2,000 -1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction bUll(Iollt period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing; Facilities in file NorthCorp area. The new Nledical / Diagnostic facility will bring over 200 permanent lulltime jobs to the Palm Beach Gardens community. This means more potential customers For your business. II' you support this type of' clean growth in your community, please indicate your support by signing below. l supporl lair it/eti of )ie-ii jobs• euld Me are ii- groivlh Ibis projrcl deI'eloper is proposilig. As a ciliZeit alld'or hrisitless otviier iii !'cilia Beach Gurdelis, / usk yogi to strpporl /heir requesi by volhW 1,7," exptwdilT uses in Norlhcoip to iireluele the Me Gail Uves behig requesled by the peliliotier. 11 Y: n (. Me .en / Business Owner Please print name PU 7F12, 40 Please print name of Business 11' Our return lilx // is 471 -1201 in Palm Beach Gardens 1-1 05;1992 15:40 FROM 407 694 6511 Tii 4711<01 NEW JOB 41 IN TALM BEACH GARDENS FO "I'E 'TTAi�'I'OR 200 PERMANENT JOBS IN ARE,A WITH APPROVAL On 'Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will Hold a public; llcaring to decide whether or not w approve new uses of land in the NorthC o.i'p Corporatc` Park, which if approved, will Pave the way for construction of lin 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. to addition, if the petitioner is : ucccssf l in obtaining the new fuses requested, he will build an additionnl 40;000 square; rt:t ofofficc / industrial support .ravice space immediately to the east of the new Medical / Diagnostic facility. During the cohstruction period the fallowing will bappew 1) 21,000-1- constilicdon related j0.5 will be created, and these people will use existing retail and service brtsir)e$$es in the aica during the 1$ month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd, 4nd Alternate AIA will be enlarged to relieve •congestion; and' 3) rrevr water and wwer maim will be installed c- ganding existing facilities in the N61,01Corp area, The new Medical / Diagnostic facility will bring over 200 permanent fulitime jobs to the Palm Beach C"zarftns community. This means more potential customers for your business. i tf you support this type of clean growth in your GO)EllltitlU111�y, please indicate your Support by Signing below. l m worl the ick(If v%ne i, jobs caul the 17ew g7-(70h d is prujecl develol ml• i.s pro wsing. As c7 c'llt-"el? a1uL'0i: IMS111e.s.5 rn1'ller in PcIlm 8ecich GC17- clerl.5-, 1 ctsk you to steppor( lhelr 1'equest l7)- voijug +��/J`r, It'r exp( 0117 'N,1" . ill NO (he xfedic(71 U e,s bei77KT�Cgi? esled by t/tE:Upefilionv% 1 B -Y Citizen / usiness Owner —" Okii' return far, A ig 471-1'4"01 Please print name Wed , 'U . Please print name of Business if in Palm Deach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTEN'HAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate park, which if approved, will pave the way for construction of an 87,500 square toot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successfi►1 in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,0001- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildol►t period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve is congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. l srrphort the idea o�'ne►►� jofi.v and the nc ►i� grorrlh this project developer i.v hroposi�tg. A.s• a citizen ancl%or business- oa►wer in Palm Burch Carders, / oslr you to suj)j)ort their request by voting „}•L;S ", fir expernc iugJ 11.ve.v in Norihcotp to inelnde the MecJkal Use.v being requested by the petitioner- BY: Our return fax It is 471 -1201 Clt1Z Busine� Iiov Lvv�.��?n�lsix Please print name Please print name of Business if in Palm Beach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate park, which if approved, will pave the way 1101- consh•uction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will bllil( an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000 -1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction biiildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve • congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. / supf�orr the is %a of ne►i fobs and the ne �i groii lh this Broject cleve/oper is prc� /�osin�,j. Ay u citizeir aml %or bus•itiess• oiiwel- in I'ahn Beach G(rdens-, l a.vk you to su/)1)o1•1 their request by voting "YL'S. ".161• exEwwding nse.s in Northeotp to inchcde the Allet ica/ U.ve.v being r•equestecl by the petitioner-. BY: _ Citizen / Bus ess Owner Please print name ! • Please print name of Business it" Our return fax 11 is 471 -1201 in Palm Beach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPRQVAL On Thursday night, November 5' 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decidc whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,001 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will brim; over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 support the idea of new john and the new growth this prr jeer developer is proposing. As a citizen and %or business owner in 1'alm Heach Gardens, 1, ask Y(MI to support their request by voting "YF.S" for expanding uses;.in Novi corp to)include the Medical Uses being requested by the petitioner. Citizen / Business Owner Please print name Please print name of Business if Our return fax # is 471-1201 in Palm Beach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTh,N'11AL FOR 200 PERMANENT JOBS IN AREA WIT1-1 APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction bUildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve • congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent tulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. l.rrc /�por/ thc ic/ca c�f'�cc►i� jobs aiicll {�c ircrr- gro►►J/h Ihis projec/ cle►�c/ohcr is /�ropos•in�J. fl.�• u cilizen wullor bilshiess or►wer hi Ailrn Beach Garclens, 1 ask you to .Yuhporl their, request Gy volingl "1'L'S "' Jo► exhanding,T use.v in Norlhcotp to inchrde the A4ethcol Use.v being requesleil by the heliliorner•. BY: iel- Citizen / Business Owner co Please print name • Please print name of Business if' Our return fax # is 471 -1201 in Palm Beach Gardens � I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the Northcorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square IM Medical / Diagnostic facility immediately south of the Marion. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: du_�� Resident • • 00 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City , Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buiidout period., 2) the Roadway intersection ,at R.C.A, Blvd, and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community, This mean$ more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I .support the idea of nevi jobs and the new growth this project developer is proposing. As u citizen andOr busluess owner in Nihn Beach Gardens, I ask you to supporl their request by voting "YAS" or expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. itizen / Business Owner r Please print name • Please print name of Business if Our return fax It is 471 -1201 in Palm Beach Gardens C� I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach - Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approyed,_will pave the way -for construction of an 87,500 square loot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail • and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: ; Resident I] I SUPPORT NEW ,SOBS IN PALM BEACH GARDENS PQTENTIAL FOR 200 PERMANENT J0[35 "_AlREA WITH APPIEWYAL On Thursday night, November S, 1992, the City Council of the City of Palm Beach Gardens will hold st public bearing to decide whether or not to trpprove new uses of land in the NvrthCorp. Corporate Pai,k, which if approved, will pave the way for Construction of an 87,500 sclunre loot Nledic:tl / Diagnostic facility immediately south of the Manott. in addition, if tlic petitioner is successful in obtaining they new uses recluestod, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the now medical / diagnostic facility. During the construction perio(f the following will happen: 1). 2,000+ construc:tiun related jobs will be created and these people will use existing retail and service businesses in (lie Area during the 18 months construction buildout period; 2). • the Roadway intersection at K C,A. Blvd. and Alternate AiA will be enlarged to relieve congestion, 3). new water And sewer mains will be installed expanding existing facilities in (tee Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltirne jobs to the Palm Beach Gardens Community. This means more potential customers for y : ar business. If you support this type of clean growth in your community please indicate your support by signing below. I t,Upport the ides of Aew jobs, and they new growth this project developer is proposing. As a resident, of Palm goaoh Gardens I ask you to support their request by voting "YES" for exprand.ing wove in Northcorp to inolude the Medical User being requested by the petitioner. Res 14 elotto • ae�d 9bZEEE8 Lob 9bZEEE8LOb50Wi °3ae13d000 Wd 80 :10 Z6. S© AON I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, tlie'City Z66nc& of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square floot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. if you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: C;;4e� —Resident 40 0 2 4 P Zwi p T. I SUPPORT NEW JUGS I Nr PALM BEACH GARDENS P 0 1 roTE,NIIAL C R 290 PF A WITH N' I, 2 Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NoohCorp Corporme Park, which if approved, will pave the way ror construction of an 87,500 square foot Medical / Diagnostic facility irntnediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses JecluestCd, he will build an additional 40,000 squde feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the followijrg mill happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction budJotft F �rlod, 2) the Roadway intersection at R.0 A. Blvd. and Alternate AI A will be enlarge to relie'. c congestion, and 3) new water and sewer mains will be installed expanding ex!stin facilities in the Noi'thCorp area. The rew Nfediul / Diagnostic facility will bring over 200 permanent fi.ulitim, lobs to (lie Palm Beach Oardens community. This means more potential customers for your `)!»ine [f you support this type of clean growth it) Four community, please indicate your support by signing h16,AoNy. I sltl�llc)rt 01e lryeo ojtte vi jobs erne! the, 11'rsv 1,rr'0141/11 this prujv l (levelnper is ProlV.0119. As a eilize,,r nmlior brr.sh ;e,ss Owner hi I)a1m Beach Gardens, I o.sk )eorr to strl�l)ort their regllest by votilrg "J "J"S" fvt' e.ipapjr1illq tr,sNS Ill /4'arthvni, f7 w itrclrrcle the Medical U.ves heitrg regxtestecl by they 1*etitimier. B Y . uzen / Business Owner ",-)� �\ Please print name Please print naune of Rosiness if Our rewrn fax # is 471-1201 in P31m Beach Gardens J SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.G.A. Blvd. and Alternate Al A will be enlarged to relieve congestion; and :3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 auppori the idea of new jobs curd the new growth this pre feet developer is proposing. As a citizen and'or business owner in Palm Beach Gardens, 1 cask y,ou io support their request by voting "YES"' for expanding uses in Norther lo include the Medical Uses being requested by- the, petitioner. Our return fax # is 471 -1201 BY, I Citizen / B Less Owner vS�,� b Please print name Please print name of Business if in Palm Beach Gardens Far?' — —�. ...THU 1 _ 4_? --T FAX 4074718783 CATALFUNO CONST I SI- VI)ORT NEW J0Bk"--► IN PALM BEACH GARDENS POUNUAL 00 PERMANENT JQB IN A WITRAPPBQVAI On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthC.orp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, ifthe petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd_ and Alternate AIA will be enlarged to relieve congestion; and 1) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm reach Gardens community. This means more potential custorners for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 suppurl the klea r fneujobs aml Me new growth lhis prc jecl cleveloper is proposing. As a e:itizen mtdi�tr business' owner in Palm Beach (:iardens, 1 ask you to vippot7 their request by acting "YL:S'" for exponding tsves In Northcorp to 11chtcle the Medical Uses being requested by f/te pelltioner. BYa�._ Citizen 1 Business Owner • Please print name Please print name of Business if Our return fax H is 471 -1201 in ]Palm Dcach Gardens P02 F J U '•:' - v - = T FA 11 51 _ .t i di. f=1 T A L F 1_1 C'1 0 0 i s t FW JOBS W PALM.... �FACH GARDENS POTENTIAL FOR 200 PER , 'IANEN'I* .,1OAS_1N AREA WiTII AP1' On Thursday night, November Gardens will hold a Public heari in the NorthCorp Corporate 'Pai of an 87,500 square foot Medic In addition, it'thG petitioner is su nn additional 40,000 square feet the east of the new )Medical / 'Di; F' 1.=i 11 1992, the City Cot.rncii of the City of Palm Beach to decide whether of, not to approve new uses of land which if approved, will pave the way for construction ''Diagnostic facility immediately south of the Marriott. 'ssful in obtaining the new uses requested, he will build office'/ industrial support service splice immediately to ostic facility, Dilritig tits cotlsh'uctioll Ixtta od thefollorving will Impperl: 1) 2,000-1- construction related jobs will be created, aricl these people will use existing retail And service businesses ill the area C �urrrl€ the IS nl(711t11 construction buil(lout period; 2) the itondway intersection at ItCA 31vd. and Alternate AlA will be enl,lrbed to relieve congestion, and 3) new water a d sewer mains will be installed expanding existing facilities in the NorthC,'orp area. The new Medical / Diagnostic fay ity will bring over 200 permarnent fulltinie jobs to the Palm reach Gardens community. This means more potential customers for your business. If you support this I type of clean growth in your community, please ind gate your support by signing below. J .tircJ)Jx�rl /lle idea of ilell-_ joG.v cruel it vilizell cunt lol, hll,Yh)e.V.Y 011'11c•r behig 1'eglle.vled by the peliliorrerr. Our return (Ax 11 is 471 -1201 ']c' nc��r� l,>> vtivlh llli.v pre jc'c'! ile>>cylvJn�l' i.v �>IY�hn,vlltl,% A.5' c Peybu neac.•h (Iardeii,v, 1 irvk you to .ti q)jvr! llleil• Iill,tr hiclm -fe Me illedic of Ow-v BY: *en v iness Owner Please print name Please print name of Business if in Palm Beach Gardens • I SUPPORT NEW JOBS IN PALM BEACH GARDENS N.)TENTIAL 1012 200 1'1 RIVIANI N'T JOBS IN AREA WITI -1 AI'I'ROVAL. On Thursday night, November S, 1992, the City Council of the City ol' Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way fir construction of an 97,500 square Im Medical / Diagnostic tactility immediately south of the Marriott. In addition, il'the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square leet o1'office / industrial support service space immediately to the east ol'the new Medical / Diagnostic facility. Du,•irng the construction period the following will happen: 1) 2,000 -I- construction related jobs will be created, and these people will use existing retail arul service businesses in the area during the 18 month construction buil(1out period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Nledical / Diagnostic facility will bring over 200 permanent fiulltime jobs to the Palm Beach Gardens con►numity. This means more potential customers for your business. It' you support this type of clean growth in your community, please indicate your support by signing below. I mipporl the islecr ofrreIi,. joh.v Ill /I/ the rreu- gro►rlh 111i.v projecl Ilevrloper is propo.ving. fl v it cili °err crrnl'o r o► +-rrer ill helm Bem.•h Ccrrdert.v, / u.vk imt to vpporl (heir rerlrre.vt by volillg "YA" "' Jiv exptuidirrg n.ve,v in NorNrcolp to inclncle the /vledicirl Uve.s- hernsr reque.vled b)' the pellllorx'r. 13Y: •��__ Citizen / I usiness Owne►"" Our return lax 11 is 471 -1201 Z)Ylo D • Please print name Please print name of Business if in Palrn Beach Gardens 05,92 11 11 No . �, 05 F . 0 s,lJegosen,Rosenbac TEL: 1-407-659-3300 I,jov 1^AX 407 471 9732 CATALFUM0 I SUPPORT NEW JOBS IN PALM BEACH GARDENS 11QTfNTIAl, FOR 200 VER ANENT jQSS IM AREA WITH APPRO,YA1, On 7'hur3day night, November S, 1992, the City Council of the City of i'elm 1300th Gardens will hold it public hearing to decide whether or not to approve new uses of land in the NorthC'orp. Corporate Park, which if approved, will pave the way for construction (if tin 97,500 square, teat Medical / niAgnnstie facility immediately south of the Mariott. In addition, it' the petitioner is successful in obtaining the nt;w uses requested, he will build an additional 40,000 .,quart foot of office / industrial support service space immediately to the east of the new medical / dingnastic facility, During the construction period the following will happen: 1). 2,000t construction related fobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2), the Roadway intersection at R.C.A►, blvd. and Altcrnnte AlA will bo enlarged to rclicve congestion, 3), now water and sewer mains will be installed expanding existing facilities in the Northcorp area. I'ltc now Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Pahtt Heach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate yoursupport by signing below. 1.Vrrpporl the hleter (�f ne ►v, joGs, curt/ 1he ►tart, grown► Ihi,v prujec,•1 deve•lnher is lirvpovitig. Av cr buMnevx urwivi, w l'o/m fiecich C orders ! crsk you to vgppvri meir request by wofing ITA "' for cx/uu►th wg n.ves• in Ncrrlhcni7► to Include the Medical t/.yes heltrg requevieri by the pelltionei% r at n /Business Owner Ann&' m• be,— GWrtwer-, nr a 4 i o i d mx�d.ow wad ,l M BO"h � ard"L51 FL. 3 34t. tK P02 SUPPORT NEW .TABS IN PALM BEACH GARDEN'S P0- ELNT'1 A„ QR 200 PERMANENT JUI3 IN AREA „[T'1d< A1�['IiU`VAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will told a public hearing to decide whether or not to approvo now uses of land in the NorihCorp. Corporate Park, which iF Approved, will pave the way for construction of an 87,500 square toot Mcdicgsl / Diagnostic facility immediately south or the Marlott, in addition, if tltc petitioner is successful in 0tairing the new ures requested, he will build an additional 40,000 square foot of office / industrial support service space immediately to the esg( of the new 111edicol / ditrgnostic facility. • During the construction perim the following will happen: 1), 2,000+ construction related jobs will be created and these people will use existing retail and service businesses M the area durinU the 18 months construction buildout period; 2). the Roadway intersection At R.C,A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3), new water and sewer mains will be installed expanding existing facilities In the N'orthcorp area, The new Medical / Diat ;mostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community, This means mere puler►tial customers for your business. C� J If you support this type of clean growth in your community phase indicate your support by signing below. I support the idea of new Jobe, and the new growth thin project developer in proposing. As a resident of Palm Beach Gardeniii I aak yota to Support their request by voting "YES" for expanding uvem in Northcbrp to include the Medical Users being requested by the petitio ' . �--� BY t._ Res oat I • SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL 1'012 200 PEA VIANEW11' .10135 IN AREA WITH APPROVAL, On `I'llursday night, November 5, 1992, the City Council 01' the City 01' Palnl Beach Gardens will hole! a I)IINIC hearing to dMde WllCtller 01' 1101 to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way 1o1- construction of an 87,500 square loot Medical / Diagnostic 111cility immediately south of the IVlarnott. In addition, it the I)e1111011e1' IS SIICCCSSR11 in obtaining the new uses requested, he will build an additional 10,000 square feet of ol1ice / industrial Support service Space immediately to (lie cast Of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000-1- construction related jobs will be Created, and these people Will use existing retail and service: businesses in the area during the 18 month construction bull(I011l period; 2) the • Roadway intersection al R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing r(acilities in the NorthCorp area. ,1-,Ile new Medical / Diagnostic liicility will bring over 200 permanent fullume jobs to the Palm Beach Gardens C0n1nunlity. This means more potential Cllstol11e1'S I0l' your bIISInesS. li' you support this type of clean growth in your• community, please indicate your support by signing below. l.vlrpport the idea q1')i iv.joh.v ifi/t/ the Ileiv gi•olv/h developer i.s•/»•opas-ing. fl v a citi °ell tire/ ol. h1f.viue.v.v oijwer iii Palm Beach Gardeav, / a.vk you to support their request by voting "Yl expam1hT im -e.v in Northcoq) to inehide the tlllechcal the-v behT reque.vted by the petitioner. Our return lax 11 is 471 -1201 itizen / Business Owner Za Alee-1 Please )rint name - - A0 / 7-6-,c t�,e��1 I6'P�C,' Please print name of BusinesS if in Palm Beach Gardens � I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square root Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion, 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I supporl the idea of ne►a jobs, alit/ the neii� gr•ow,ih this pr•ojecl developer is proposing. As a busitiess o►iwer nl Palrn Beach Ccrrilens 1 ask you to support their request by voting "YES" for expanding uses in Nol•thcolp to inch/de the Medical Uses heillg requested by the petitioner. BY• tCitizenj,,husiness Owner I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WiTH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the Norfforp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) Z,UVV+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the l8 month construction buildout period; 2) the • Roadway intersection at R.C.A. Blvd. and Alternate Al A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. 0 The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I support the idea of new jahv and the new growth this pre feet dewloper is proposing. As a citizen andi'or business owner in Palm lieach Gardens, 1 a k scar to support their request by voting "YE " for expanding uses in Northcorp to include the Medical Uses being requested by, the petitioner. B , Citizen / Business Owner Our return fax # is 471 -1201 Please print name Please print name of Business if in Palm Beach Gardens • 4• 0 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new, uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for Construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the peti'ti'oner is successful in obtaining, the new uses requested, he will build an additional 40,000 square feet of office / industrial .support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction'related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A, blvd, and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area, The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community, This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I.support the idea r f'neu jobs and the ne►v grog vfh this projecl developer is proposing. As u citizen andOr bu.stness owner in 11c:bn Beach hardens, t ask �vou to support their request by voting "YES or expanding rises in Xurthcarp to include the Medical Uses being requested by the petitioner. BY: izen Business Owner Our return fax # is 471 -1201 .kh.4d 5�aole- Piease print name Please print name of Business if in Palm Beach Gardens I � SUPPORT NEW JABS IN PALM BEACH GARDENS On Thursday night, November 5, 1042, the City Cdunoil of the City of palm Beach Gardens will hold a public hearing to decide whothor or not to- approve new uscs of land in the NorthCorp Corporate Park, which if approved,, will page tho way for constructlon of an 87,500 square foot Medical / Diagnostic fhrility immediately south of tho Marriott. In addition, if'the petitioner is succesAl in obtaining the new usca roquostod, he will build an additional 40,000 square feet of office / industrial support sorvico spade immediately to the east of the new Medical / Diagnostic facility. During the construction period the fallowing will hAppeo., 1) 2,ono+ Gpnstructlon n;lgVd jobs Y411 0; V94t0d, and thcot poople will use existing retail i and service businesscs in the aroa during the 18 month con=ttuction buildm ported; 2) tho Aoadway intersoc+tion at R.C,A, Blvd and Alternala 'AIA will be enlarged to relieve congestion, and 3) now water and sewer mains wl11 .be Installed expanding oxIsting ihaitities in the NorthCorp 4rca, The now Medical I Dlagnostic thollity will brinS over 200 permanent fulltirnt jobs to the palm Beach Gardens (x)tntnunity, This means mve potential oustornare for your buslnoss, if you support this type of cleans growth in your COMMUnity, please indigate your support by signing below s l .rapport the idea of new, jobs crrtd thO Heiv grawth 1h1 prgject deiwlqpW1 Is proposing. As u c:tllretr urn k?w. blulness owner fn Pellm '0000h Gardsp , t tn* You to strpporl their r�eque st by voting " }'XV , for expar &jg ums� Ill Northcorp to inc tuds the Modl cal Uses bet►ig regtrested by the petltihnen Ir BY' � Citizen / Business Owner 1.. XuLicyl • Please, print name Please print. name o Business if Ovr return fax 0 is 471 -1201 In t"'altrt Beach Gardena 1I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT .JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in (lie area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate Al will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: Li Resident • • r] 1 SUPPORT NEW JOBS IN PALM :BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN ARI't"A WI`I'11 APPROVAL On TI►ursday night, November 5, 1992, the City Council OF the City Of Palnl Beach Gardens will hold it public hearing; to decide whether or not to approve new uses of land it) the NordiCorp Corporale Park, which d' approved, will pave the ►way 1b1. collstruclion of an 87,500 square Im Medical / Diagnostic facility immediately south of the Nlarriott. lrl addition, ifthe petitioner is s►lccesslul in obtaining the new uses requested, he will build an additional 40,000 square Peet oPvlTice /industrial support service space immediately to the east oi'the new Medical / Diagnostic Facility. During the construction period the following will happen: 1) 2,000-1- construction related jobs will be created, and these people will use existing_; retail and service businesses in the area duffing the 18 month construction bllildout period; 2) the Roadway Intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion-, and 3) new water and sewer plains will be installed expanding existing; Facilities in the NorthCorp area. The new Medical / Diagnostic lacility will bring Over 200 permanent fulltime jobs to the Palm Beach Gardens C01111n11n11y. This 1110 IS I1101'e potential CLIS10111e1 -S FOr your b►ISnless. I1' yon support this type of* clean growth in your community, please indicate your support by signing below. l .�nhhorl llie itic�r o/ nc�►v joh.� �uul the nely srro►r1h Ilti.� j�rojccl cleveloj�er i.� hrol�o.�in�,�. As (t cili-7e)t mubor bu.vine. s owner in Palm Beach Ccirdenv, l a.vh you to supporl (heir re que svl b y voting "Y],' S" /iv expandbig mve.v in Northmp to inchrcle 1he Medical U.u.r beijT reque.s -led b), the pelilioner. Our retLII n lax Ig is 471 -1201 Please print name we_7—/ !LC,Q _ _ Please print name oFBusiness it' in Palm Beach Gardens 7 r3G 1V� 3 3Sc�a I SUPPORT NEW JOBS 10 PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square toot Medical / Diagnostic facility immediately south of the Marion. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: . 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: Resid t r • SUPPORT NEW JOBS IN PALM BEACH GARDENS P- N'iIdi-FOR 200 PERMANENT JOBS ,I AREA NVU APPIOVAL On Thursday night, November 5, 1492, the City Council of the City of palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of Irtnd in the NorthGorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successfid in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial suppot't service space immediately to the egst of the new medical / diagnostic facility. During tite coil st1•uctign period the following.will happen: • 1). 2,000'- construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A, Blvd, and Alternate AIA will be enlarged to relieve congestion; 3), new water and sewer mains will be installed expanding existing facilities in the Noi7hcorp area. lJ The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community, This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. 1.crrpport the Idea of new jr?h.s•, card the ?iew getm,1h As a brrsltte.r.s owmi, In PaInt Beach (.rardew,s' 1 a.ssk On to support the�h' Ivellre.s't by votilig "YF,S "far• e�7tcrtrdlrtg rises tit Northc•cir�, to Melia the Medical (Ae-s• belrrg requested by the pefitimier. Q , r RVANNIS / Business Owner NOV- 5 -52 THU 17:14 P.03 • i I SUPPORT NEW JOBS IN PALM BEACH GARDENS ]POTENTIAL FOR 200 PERIVIANI±AT JOBS IN AM- A WI'1'11 APPROVAL, On 'Thursday night, November 5, 1992, the City Council of [lie City of Palm Beach Gardens will hold it public hearing to decide whether or not to approve new uses of land ir► the NorthCorp Corporate Park, which if approved, will pave the way 161. construction of an 97,500 square trot Medical / Diagnostic facility immediately south of (lie Marriott. In addition, il•the petitioner is successful in obtaining the new uses requested, he will build an addilional'10,000 square feet of ollice / industrial support service space im►nedialely to the east ol'the new Medical / Diagnostic facility. During; the construction period the following will happen: 1) 2,000-1 construction related jobs will be created, and these people will use existing; retail Mid service businesses in the area during the 18 month construction buildOLlt period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. it, you s(fpport this type of clean growth in Yom- community, please indicate your support by signing below. 1supporl the iuul the iie•w gro►rlh llri.s. pi pjecl developer is- proposilig. A.S. cr c.•ili °ecr creel -iii /ursiliess ouriier hi hilin laeoch Gordeic.v, 1 risk you to supporl /heir request by voliiig expoliclilIg ie.ve.v iii Norlheoip to iiic•hule the Alleelieeil Uve.s- beh-ig rerluesled by the pelilimer. BY: _ _ Citizen / Business Ow r Our relui n lax I/ is 471 -1201 .L -�Qda G--Lk (—Iq-ec Please print name Please print name of Business it' in Palm Beach Gardens From : ACTIUE ALAF.MS /GODPY SAFE y. LOCK 0407)954 -5347 S I SUPPORT NEW JOBS Nov.05.1992 11:51 AM F01 IN PALM BEACH GARDENS L011 y IAL FOR. ;00 RUMANENT JOM TN AMA Wi_ T" RRO VAL On Thursday tiig'ht, November 5, 1492, the City Council of the City of Palm aeaah Clardens will hold a public hearing to decide whether or not to approve new uses of land in the 'NorthCorp Corporate Park, which if approved, will pave the way for construction of an v,Sn0 square foot Medical / Diagnostic thuility immediately south of the Marriott. In addition, if'the petitioner is successful in obtaining the new µsec reque6led, he will build an additional 40,000 square feet of office I industrial support service (ipaGc immediately to the Cast of the new Medical / Diagnostic facility. During the construction period the following will happen'. 1) 2,0001- consiruc;tion related jobs will be croated, and these people will use existing retail • and service busine cs in the area during the 18 month construction buildottt period; 2) tho Roadway intersection at R.C.A, Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorihCorp area, The now Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Reach Gfirdens community, This means more potential customers for your business. If you support this type of clean growth in your community, please Indicate your support by signing below. 1 srypporl the Idea of'ne- w.jobs and the Itc+1v growth Ibis pp 1ec't cic. ivinper is ivol)osing. As u ulilren and,iwr ba,Mies's o►s?ir4cr ill pc1b)l Bcnc'h (iareYen.1, / ask tiVrn to S'tfPP011 their requeu by 1,0011,q "YA'S ".ror expanding rises In Ncn7hcrnI2 to 010114de the Aledicol tlscs being requeste(i by the 17etttioner. BY: siness Owner Pica print lame Please print nakne of Business if our return fax H is 471 -11201 in Palm Drench Cardcno I • SUPPORT NEW JOBS IN PALM BEACH GARDENS PpTENTIAtI 'OR 200 PERA7ANE J� -S IN AREA WlIff APPRQY On Thursday night, November 5, 1992, the City Council of the City of Palm Reach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp, Corporate Park, which if approved, will pave the way for Construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the MRriott. In addition, if the petitioner is successflil in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space Immediately to t1le east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,0001, construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the roadway intersection at R.C.A. Blvd, and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Notillcorp area. The new Medical / Diagnostic Facility will bring over 200 permanent fulltime jobs to the Palm Reach Gardens Community, This means more potential customers for your business. If you support this type of clean growth in your- community please indicate your support by signing below. I mil)port the lifea q/'rrem jobs, and the new gl-ow1h this project (levelolV" is Pr-01)mIng, As a bushiess owner- in 11alrn Beach Gardens 1 ask you to s111>17r>rt rlutir regruesl by voting "Ws" for ex/randing uses in Norfhv()11r 10 ' chf le the Medical t:Jve.v being requested by the petitioner. BY: Uaitizeuslnes • Qwner NOV- 5 -92 THU 17:15 R.05 FAX 4074716783 CATALPt1MO CONST I SUPPORT NEW JOBS IN PALM BEACH GARDENS PQI[ENLIAL EQR 900 EERMANENI JQBS IN AMA W PP On 'Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, ifthe petitioner is successftil in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. 1)uring the construction period the following will happen: t) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCog) area. The new Medical / Diagnostic facility will bring over 200 permanent fblltime jobs to the Palm Dench Gardens community. This means more potential Customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I support the idea gj tie u obs• cantl the new growth This pr(yeel de tie loper Is proposing. As c, vilizen aric%ur husiness owner in Palm Reach rlar(lens, 1 ask ),ou to .sg1)p0r1 (hell' request by outing "YES fear e idingy. ii.ves In Morthcorp to lnelude the Medleal Uses being requested by the petitioner. Citizen / Business 0' wner � P ease print name Please print name of Business if Our return fax H is 471 -1201 in Palm Dcaoh 0ardens P02 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITFI APPROVAL On Thursday night, November 5, 1992, the City - Council of the City of -Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square Im Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing- As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY Resi ent • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marion. In a addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: . 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate Al will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. 1 support the idea of new jobs, and the neis, growth this project developer is proposing. As a business owner in Palm Beach Gardens 1 ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. , BY: G Citfien / Business Owner F I. • 0 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL I-OR 200 1'GRNIANENT .10135 IN AREA WITH AIIPROV On Thursday night, November S, 1992, the City Council of tile City of Palm Beach Gardens will hold it public hearing to decide whether or not to approve new uses of land III the NorthCorp Corporate Park, which if approved, Will paVe tile Wily lot' CClnsIrIIC11011 of an 97,500 square loot lvledical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square legit of office / industrial support service space immediately to the east of the new Medical / Diagnostic litcility. During the construction period the following will happen: l)2,000-1- construction ['elated jobs will be created, and these people will use existing retail and service businesses in the area during the 19 month co►lslrilction bLIIldollt period,' 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing l'acilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I support the ideu ofneu john rrild Ilse rx u, gl- olrllr 1hi.v pl pjecl developer. i.v pl-opo.ving. ,I.v u cili--ell 11111[ v bu.viness oll'irer• in I'unv�, ach Gm-deit.v, I u.vlr you to avrppoll /heir• re que.vl /))/ voting »YI.S» /iu• erperndhnq in NorlhA rp to inehitle the Alledieul U.ve.s• hehkir r•erine.vled by the pelilioner•. Our return hix // is 471 -1201 itizen / Business- Owner f C,ti.w►�,1� Yt�i"� yl>cJl�h�h,_ Please print name yc t! `I Please print name of Business 11' in Palm Beach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS ]POTENTIAL FOR 200 1'ERMANGNT JOBS IN AREA WIT11 AIPPROVAL On Thursday night, November 5, 1992, the City Council of the City of' Palm Beach Gardens will hold n public hearing to decide whether or not to approve new uses of land in the NorthC'orp Corporate Palk, which if approved, will pave the way (or construction of an 87,500 square loot lvledical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet ol'ot7ice / industrial support service space immediately to the cast of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000 -1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buil(1out 2) the • Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent tulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. 11' you support this type of cle"111 growth in yom. community, please indicate your support by signing below. l support the ielelr erne! 1he irvu, ge•ow1h Ihi.v j)r(?jee'l de veluher• i.s•pr•qw.s- iirg. As- o eili--en urrel %err hrrsine s.s m wer ill holm heoeh Gor•delm, I risk year lo /heir redrresi by voliwlr e pmiditW rr.ee.v in ;,- orlfr inchide the Medical U.ce.s heir -W reque.vled by Ilre heliliower. BY: iti;bn / 13ufness Owner Please print name Please print name of I3lIS1nCSS 11' Our return tax ll is 1171 -1201 in Palm Beach Gardens I SUPPORT NEW JOBS IN - PALM BEACH GARDENS POTENTIAL hOI2 200 PERMANENT .JOBS IN A121-!A WIT1 -1 APPROVAL Oil rlThllrsday night, November 5, 1992, the City Council of the City of' Palm Beach Gardens will hold a public hearing; to decide whether or not to approve new uses of land III the NorthCorp Corporate Park, which if approved, will pave the way for construction ol'an 87,500 square loot Medical / Diagnostic Iacility immediately Soutl► 01'the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional '10,000 Square feet of of ice / industrial support service Space iiilnlediately to the east of' tile new Medical / Diagnostic facility. During tike coils tructioll period the following will happen: 1) 2,000-1- construction related jobs will be created, and these people will use existing; retail and service businesses in the area during; the 18 month construction b�ildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve • congestion; and a) new water and sewer mains will be installed expanding existing; facilities in the NorthCorp area. `1'he new Medical / Diagnostic 11,1611ty will bring over 200 permanent filllti►ne jobs to the Palm Beach Gardens COI111111InIty. This 11 Cal"IS I7101'e Potential CIISIOIMI -S for your business. 11' yon snppor-t this type of cle.,>tn growth ill your community, please indicate your support by signing below. l .vtc /� /�ni•l /lcc is %cr a / �1c1I' Jnh.�• cntcl the iie II- �,�i•nn�lh Ihi.� p�•ojcc.'I c %i�� lu��ci' i.�• /�rc� /�r�.�ic��,�. A.�• u cilizen mul "or hu.s-hic.v.v m i iie r iu Perlin Beach G(irdelu, l uslc pni to srcpporl llleir reque.vi by voliiirr "YL•. "'. /nr expanding il.ve.v iii Norllreotp lu ' iehit the Nlediced U.ve.s being regnc.vlud by the pefilimier. Y: _ �('.ltizen / usiness wner 'lease print name - —` eo czo�/-) f/ • Please print name of Business .1, Our return lilx I/ is 471 -1201 in Palm Beach Gardens M0'•. — S —'-+:2 THU 1 0 : Oo s� F�F:Ci 1FEF' I T`r LRE ICI G I h-4G 1� NEW 39.OBS PALM BEAC IAL FOR 200 PE On Thursday night, November 5, 1992, the t Gardens will hold it public hearmt to decide w'. in the NorthCorp Corporate Park, which if App .of an 87,500 square foot Medical / Diagnostic ! In addition, if the petitioner is suoeessftrl in obta An v4jitional 40,000 square feet of office J itidw the east of the new Medical / Diagnostic A, cility. GARDENS RS IN AREA WITH AYPit_U - -A e ity Council of the City of Palm Reach .(her or not to approve new uses of land aved, will pave the way for construction cility immediately south of the Marriott, ring the new uses requested, he will build rial support service space immediately to Dm ing the eomOvoetioti peviod the folk w1rig will happen; 1) 2,0001, construction related jobs will be creat d, and these people will use existing retail and service businesses in the area during the 18 r ontlt construction buildout period. 2) the Roadway intersection at R.C.A, Blvd., and Al ernme Al will be enlarged to relieve • congestion; and 3) new water And sewer mains will be installed expanding existing facilities in the NorlhCorp area. The new Medical / Diagnostic facility will brin4ovee 200 permane »t firlllime jobs to the Palm Beach Gardens community. This means !ti re potential customers for your business. [f you support Otis type o`f clean growth in your community, please indicate yoga' support by signing below. 1 s►►hpnt't !I►e lc %cr c r►c►r� j <�hs' evict tlrc� iri�ii r�nr It lhls jet c c�c! c!e>>c�lc►j�ci' is ltt'itpnsltt,�. As cr cuizeit curcf'nr' busijie s oitwer In Palm Beo:h ( covens, 1' ask yn►r to s►q)1mrt iheir Ytrq rest by mang "YENS W' fvr ex[mttcfi ig rise.v Iii Arotlfto y to I10111te Me R. •dick Mes being reque.stecl by the pelldloner. A Owner P1 se print rrarttd 1 • Plek se pt tit ante of Business if Our return fax # is 471 -1201 i� Palm Beach Gardens F' - 0 1 SUPPORT . NEW JOBS IN P01'ENTiAI FOR 2'ODUE.RMANENT JOBS IN AREA WITH APE$,QYA T. On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve now uses ut' land in the NorthCorp. Corporate Park, which if approved, will povv the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott, In addition, if the petitioner is successfilt in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of'the new medical / diagnostic facility- During the construction period the following will happen: 1). 2,000 +- construction related jabs wilt be. created and these people will use existing retail and service businesses in the area during the IS months construction buildout period; 2), the Roadway intersection at R.C.A. Blvd, and Alternate AIA will be enlarged to relieve congestion; 1), new water and sewer mains will be installed expanding existing fa0lities in • the Northcorp area, The new Medical / Diagnostic: facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this typo of clean growth in youll• community please indicate your support by signing below. I .support the idea n/ nerr_ john' (Illei the new growth lhts pivle uj developer is proposing. As �.i blisillesv o►vner ill 1'cllin Bench Gcxrdens J 0A ytrti to supporl their request by voting "Yb,'.8" fur expcirnffili� Ayes in Norlhcorp to inchide /be Aledival Ilus heing re c -led by the peiiiii3nvl% BY: itizen / Business ne 0 11/05!9 11 :07 a 586 227-6 LAWYER'S TITLE 01 t -J CAS"•£ 05 -9 2 THU 1 0 : 44 CATAL FUM0 SUPPORT NEW JOBS IN PALM BEACH GARDENS F' _ C+ O'F,1vTiAL FpR gOO PF_,RMAN RFA WITH PP >L On Thursday night, November S, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NonhCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott, In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen, . 1) 2,000+ constriction rclated jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A- blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area, The now Medical / Diagnostic facility will bring over 200 permanent f'ulltime jobs to the PaliTi Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. !support the idea of cnui the ne►u, growth this pro /acct (Ave1g1)er is praposing. As a citizen audio►- business mvner in faint Reach ("Tarckns, I ask you io support their request by voling 7F.5" ft» • eximn(iing uses in Not -themp to i)tchcde the ATecliccil Elves heing requvslecl by ilia' petitioner. :' J BY i 7iiien /"Buu`siness Owner micnAFL GLASS _ Please print Marne UNIVERSAf. ),AND TTTLr, 1NG. Please print name of Business if Our return fax # is 471 -1201 in Palm Beach Gardens SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marion. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. 0 The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. 1 support the idea of neu jobs, and the ne►v grorvih this project developer• is proposing. As a business ou ner in Palm Beach Gardens 1 ask you to support their request by. voting "YES" for expanding uses in Northcorp to inchrde the Medical uses being requested by the petitioner. BY: Citi n / Business caner o- iiI I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPRQVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) Z,UUU+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout peEiod, 2) the • Roadway intersection at R.C.A. Blvd. and Alternate Al A will be enlarged to relieve congestion; and :3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community, This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I support the idea of nevv joh.s anal the new },owth this project developer is proposing. As a citizen and /or business owner in I'alm Beach gardens, I avk �,ou co support their request by noting "YF.,5" #)r expanding uses in Northcorp to inchicle the Medical Uses being eeeluested by the petitiar►er. BY-. Citiz usiness Owner Please print name _._..: Please print name of Business if Our return fax # is 471 -1241 in Palm Bcach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS PO'll'ENI'IAll FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, ifthe petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000 -1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction blllldout period, 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Patin Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I snpporl the it o /'ne iii Jobs anti the iie II, gro►i,lh Ihi.v pi ojeel cleveloper is proposing. As u cilizeii cnicl /oi- bushiess owner• hi Palm Beoclh Gardens, I asylo you to srgpporl lheh* regroesl by voling "YL'S "'.Joi• exhcnuling rises in Northcotp to iirchude liter Nkeilical Uses being regneslecl by,lhe peliliorrer•. BY:4AA041 Citizen / Busi ess Owner Please print name Please print name of Business if Our return fax 11 is 471 -1201 in Palm Beach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the • .Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; and )) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. • The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I siq)poi•t the idea of nest, jobs and the tie it, groivih this project de relopei• is proposing. As a citizen anctol- business owne!' in Palm Beach Gat -dens, I ask you to sirppor•t their request by voting "YI'S" for expanding uses in Northcorp to inchide the Meclical Uses being requested by the petitioner. Our return fax # is 471 -1201 IC 066h / 13,71 lwner Please print name Please print name of Business if in Palm Beach Gardens • d, • rAA -'kV I Y I L 2 1 OJ - -GLl l riLr LIILO VV110 1 I SUPPORT NEW JOBS IN PALM, BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not, to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility, immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buiidout period; 2) the Roadway intersection at R.C.A, Blvd, and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community, This mean$ more potential customers for your business, If you support this type of clean growth in your community, please indicate your support by signing below. 1.574pport the idea of nevi jabs and the nets growth this project developer is proposing. As u citizen and0r- business owner in Pcihn Beach Gardens, t ask You to m4pport their request by voting "1'fs',S for expanding uses in Ngr.thcWip to in dile�th Medical Uses being requested by the petitioner. /Citizen / Business Pwner Our return fax fi is 471 -1201 Please print name Please print name of Business if in Palm Beach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL Or, Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the Noi- thC'orp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility initnediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support set-vice space iirt3mediately to the east of the new, Medical / Diagnostic facility. During the construction period the following will happen. 1 j 2,000 r construction related jobs•will be created, and these people will use existing retail and }ervice businesses in the area during the 18 month constriction buildout period, 2) the R.oidway inter,,ection at R -C.A. Blvd. and Alternate Al A will be enlarged to relieve congestion; and 3) riew water and sever mains will be installed expanding e\isting facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulhime jobs to the Palm Beach Gardens community. 'This means more potential customers for your business- If you support this type of clean growth in your fomlr>iunity, please indicate your support by signing below. I sujpl?urt the i,ka of mni jnh.s cruel the ne's't, groic!th tlii,5 prc)jeet cle�,el( -)j)cr is proj)o.cing. As a citizen a'nd•E,;r• business oulner in Palm .Beach «rctrtkns, I ask you to sul)port their request b1v vo iiig 'Th..S "for E.gw-indin�i; rise's in Alorthcc3r r tv inchidw the tti•Metficcrl l.'ses bef"12g requested bj• the petitioner. BY, A3 . nor b,tt?^ Please print name Please print name of Business if Our return f<IX 4' is 4 71 - 1201 in Palm Beach Gardens FAX 4074718783 CATAGFUMQ CQNST 1 SUPPORT NEW JOBS IN PALM BEACH GARDENS PQTEN1'1AL FOR 200 PEHMANENT JQBS IN REA WIJUAPPRQVA14 On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of* an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of ogee / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: • 1) 2,000+- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C'.A. Blvd. and Aiternato AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Pater Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. / support the iclea t f nest jobs• antl the new Krawth ih/s preyed tlevelaper is proposing. As rr vilizen crntl.%ur husiness Olwier to Palen Reach Gardens, 1 ask you to .rupporl !hell, request by volil►g "YE "', or Expatiding aver, In Northcorp Iv /tic/title the Medleal Uves being reque.vert by the petitioner, BY- _ Citizen / siness Owner • Please print name Please print name of Business if Our return fax b is 471-1201 in Palm Daach Gardens P02 • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction ol'an 87,500 square Im Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the-following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. Resident 40 SUPPORT • NEW JOBS IN PALMS BEACH GARDENS POTENTIAL FOR 200 PERMANEN'r JOBS IN AREA WITH APPROVAL On Thursday might, November 5, 1992, the City CounrA of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,0010 square feet of office / industrial support service space immediately to the east of the new Medical / Oingnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses In the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd, and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing • facilities in the NorthCorp area. The new Medical /[diagnostic facility will bring over 200 permanent 110time jobs to the Palm Beach Garda»a coninwnity. This means more potential custorners for your business. if you support this type of clean growth in your community, please indicate your support by st-gning below. I support lite idec7 of veto. jr►hs tnrd they vew X pc►.ri►tg. As Q citizen C ndlol' husiness olwier 1 ►t !'ulm Hwc.h G arde#ps, I tY.4 wo, m sty7nn►7 their reque-vt by voli,►g 71;,4" for ev.x udjhg itse s in Norlheotl,7 to ivchrtle the Medical Uves being rerlttestetd by they petitioner. • Our return fax # is 471 -1201 NO - 5 -92 THI_► 14:1 Citizen / Business Owner CIA- Please print rt`arne lr t � JW,a�l�-c�S� Please frint name of Business if in Palm Beach Gardens G3S P. 01 SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL, FOR 200 PERMANENT JOBS IN ARF;A WITH APPROVAL. On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NortlrCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. , During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Nonbcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gnrdens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I mipporl dre idea (f ar►v jobs, and lire neuv grotivth this project developer ishroposing. A.s a business owner in Palm Brach Gardeim J ask you to support their request by voting "Yl•:S "for expanding uses in Northcorl) to include the Medic .rrs - -bein regites1ed by the petitioner. BY: ' C---- Cit' / usiness Owner Richard J. Haskins, Executive Vice President REPUBLIC SECURITY BANK • 0 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square loot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth . in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: Resident 0 I w SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA W111 -1 APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. Diming the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) (fie Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent tulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I .vrrpporl the ldea of ne►i job.v and the nc ►i irrorrlh Ibis' project lle velo�)er is �)rol)o.ving. As' a citizen i mI10r brr.sine.v.v order• in I'alr// Bench Garilens, 1 as•/r YOU to srrppo/ t their reilue.vt by voting "YL'S" fo/• expirr/dir/g tr.re.v in Northeotp to inchrcle the tlleilical U.ve.v being /•equevecl by the 1e1itione1. Our return fax It is 471 -1201 /�" , W BY: Citizen / Business Owner Please print name Please print name of Business if in Palm Beach Gardens 0 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate Al will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is- proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: R ident 0 C rq j' 7 Flt /�� �/�/✓�E� � I SUPPORT NEW JOBS I PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of'an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In ti addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate Al will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. 1 support the idea of nem, jobs; and the neii, growth this project developer is proposing. As a business owner in Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical_ U.ves being requested by the petitioner. I , % A I / Bu lu 0 f • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the Northcorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic tacility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate Al A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: ` Resi nt • • • • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN ARLA WI`C'II AI PROVA Oil 'Thursday night, November 5, 1992, the City Council o!' the City 01' Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which il' approved, will pave the way fur consU-uction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 110,000 square feet of ollice / indushial support service space immediately to the east ofthe new Medical / Diagnostic facility. During the construction period the following will happen: 1)'-),000-1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction bulldoul period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate A 1 A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in (lie NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. 11' yon support this tYpe of c1c In growth in your• community, please indicate your support by signing below. I .N-upporl Me h let I q rreiijobs urid lire rre►i! sfrow1h IhLY pipjecl cleve/oper i.v propo.vilig. Av it cilizcrr crrrcl %or brrsirress ourrcr irr l'crlm heaclr Carchrrs, I u,�% yorr lo .err /� /�orl Ilreir regllesl h)) volilrg "YA'S ", /in. expcmilirrg rr.s•c.s• in Norlheolp Io irrchrc% the Alleclicirl Uve.v hehkii r•eque.slc cl b), the peliliorrc r. Our return fax 1/ is 1171 -1201 By G� -- �Uzwde�tl ✓lrl �J Cities zen / BLIs►ness Owner Please print name V�tAAk'4VvAs Please print name of Business iT in Palm Beach Gardens 0 0 0 SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPRQVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,UUU+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate Al A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 swppori the idea of new joh.s and the new growth this project developer is proposing. As a citizen and or business owner in 1'alm Beach Gardens, 1 ask You to support their request by +poling "YFS" or expanding uses in Northeorp to include the Medical Uses being requested by the petitioner. Our return fax # is 471 -1201 B �-, _ itizen / la siness Owner Please print name Please print name of Business if in Palm Bcach Gardens FR0P1 9. 3. 1987 3:45 F. 10 SUPPORT NEW JOBS fN PALM BEACH GARDENS POTENTIAL FOR 200 PERnAIYENI i OS IN AREA WITH A,p LOYAL On Thursday night, November 5, 199, the City Council of the City of Palm Beach Gardens will hold A public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way fur construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successfid in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction peNod the following will happen: • 1) 2,000+- construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R A, Blvd. And Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Nonlicorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. / .srrppnrt the Nv4i r?j and the new geowth tho pi,oJeci tlevelol;ier is prplxosing, As a brtc /w,.cs Owpm, in 1'alnr Beach G'ardemy 1 wvk you to sw1y)ort thelr redueW by voting "YF.S" for exl)andtng rrsd.s i►? Northcoil) ro itwhule the Medival Uves being regne,sted by the petitioner. Citizen / Business Owner 0 Cl E 40 I SUPPORT NEW JOBS M1 PALM BEACH GARDENS POTENTIAL FOR 200 Ph:RNVIANLN'1' JOBS IN AREA WIT11 APPROVAL Oil 'Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way Ibr construction of an 87,500 square Im Medical / Diagnostic facility Immediately south of the Marriott. In addition, 11'111C petilioner is successful in obtaining the new uses requested, he will build an additional �I0,000 square lM ol'of� ice/ industrial support service space immediately to the east ofthe new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000-1 construction related jobs will be created, and these people will use existing retail Mid service businesses in the area during the 18 month construction buildout period- 2) the Roadway intersection al R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic (acilily will bring over 200 permanent fulltime jobs to the Palm Buell Gardens conlrnttnity. This means more Potential customers for your business. 11' you support this type of clean growth in your community, please indicate your support by signing below. l .qtr /� /cur! llrc is %rr a / n� ►i' /nh.� �nrcl lh� ilc ►I sfr'ci►rl {r llri.� /�i ujec l cic ►eau /�cr i.� /ern /�n.�iir��. As it cili--en crncl %err husiness o► wer hi P din Beoch Gardens, l (isk ),orr to support /heir regne.s•l by volitig "YAS /or expancling nse.s• in Norlheory) to include the llllediccrl (Ales being regne.s•lecl by the pelilioner. 13 Y: Citizen / Business Owner Please print name Please print name of Business 11' Our return tax I/ is 01 -1201 in Palm Beach Gardens u • L] SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT .10I3S IN ARI-�:A WITH APPROVAL Oil Thursday night, November 5, 1992, file City Council of file City 01' Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way liar construction ol' an 97,500 square Toot Medical / Diagnostic facility immediately south of the Marriott. !n addition, ifthe petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet ol'office / iMLIStlial support service space immediately to the cast of'the new Medical / Diagnostic facility. During; the construction period the following; will happen: 1) 2,000-1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month constn►ction b1IIId01.lt period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate Al A will be enlarged to relieve congestion', and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic lacilily will bring over 200 permanent fulifime jobs to file Palm Beach Gardens community. This means more potential customers for your business. If* you support this type of' cle.,in growth ill your community, please indiciate your support by signing; below. l .�rr /� /�ur•l ! {re is %•rr a /ix►r1uh.� crrrcl Ihc• irc ►►' ,t,Jr'n►i�llr Ilia• /�i'c�j«•l c %�►�clu��cr i.�• /�rc� /�u.�•irt��. fl.�• u cilizeu crrrcl%or brr.virrc.vs o►vrrer hi I'crlm Beoch Carclerrs, / u.4 pm Io ,svppor/ Ihcir r•egrrc.vl by volirrg e,rpurri/irrg rrse.v irr Norlhcolp to inc/rrcle !hc Aledical Llve.v being reque.vlecl by Ile heliliorrer. BY: Citizen / Business Owner Please print na e Please print name of Business if Our return tax 11 is 471 -1201 in Palm Beach Gardens • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if Approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate Al A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY• Resident u �. -9.2 THU 1 0 : 44 FAX 4074718783 CATALFUM0 CON&F w I r SUPPORT NEW 30BS IN PALM BEACH GARDENS F' _ 0 4 QlEriLIAL 00 EERM&NENT-NDS IN A PPROVA, On 'Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will held a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successftrl in obtaining the new uses requested. lie will build an additional 40,000 square feet of ofTlee / industrial support service space immediately to the east of the new Medical / Diagnostic tacility. • During the construction period the following will happen: 1) 2,0001- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 muntb construction buildout period; 2) the Roadway intersection at R.C. A, Blvd. and Alternate A 1 A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / diagnostic facility will bring over 200 permanent fulltirne jobs to the Patin Deauh C3ardens community, This means more potential CusWiners tar your business. w If you support this type of clean growth in your community, please indicate your support by signing below. l st pport the idea r f ►ten jobs and the new xrcn4lh 1111.v rraject developer is proposhrg. As a e:itirrn andlin- hu.viness otitiv►er III 1'crin► Beach Gar(lens, ! ask )!oil to vipport then' request by voting "YES". %ar expanding n.ves !t► Northcorp tv itrclude the Medlcal Uses being requested by the petitioner. 1117 I Our return fix ff is 471 -1201 BY. Citizen /B siness C Please pr t name Please print name of Business if in Fatm acach Gardens P02 11H'- JF'0EN -1 ER0L0(-;`( GRTH-IF TEL : 1- C,,1.,:_, 14,V -05-' 92 THU 11:20 I n : FWi'= �R -EWtOYEn • TEL I r =�: d %�'7 £:, 1 -E:. 1 �L '= A: >;I_ iFJF t!G' -A3 F02 - - - -- I SUPPORT NEW JOBS M ,[* — ENTIAL FOR 200 PERMANENT JOBS IN AREA WIT" APPROVAL On Thursday night, Noveniber S, 1992, the City Coun6l of the City of PAltn Beach Gardens w111 hold a public hearing io decidc whether or not it) approve new uses of land iii ttic NorthCorp. Corporate Park, which if approved, will pave the why for oons1ruction of an 87,500 square loot Medical / Diagnostic facility innnledialely -'0111h of the Mnriott, in addition, if the pelilioner k successful in obtainini; the new uses roqucsted, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the Cast of the iiew nlcdical / diagnostic facility. During the constr•uctioll pet•io(l tine followitag will 1111plietr: 1). 2,000 t eonstructioll relitcd jobs will be orated anJ these >ea(� le will use existin retail the RoTdway intersection at R.C.A, Blvd. and Alternate AIA will be eilari;ed to relieve congestion, 3), new water and sewer mains will be installed expanding existing facilities in the Norlhcorp area, The ne%v Medical / DinUtiostic 1fl61;ty will bring over 200 pei-mmient iull(inic jobs t0 the Palm Beach Gardens Co1rin1unity. This means mote potential customers for your business. If you support this type of cle,eat gli -o wth in your- community please indicate your. support by signing below. I support the idea of new Joba, and the now growth this project developer ie proposing. As a resident of Palm Beach Gardens I ask you to support Choir request: by voting "YES" for expanding uses in Northcorp to Include the Medical Uses being requested by the petitioner. BYr is �� I L 33 c I 1 0 0 0 H SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 support the idea (?f'ne►v jobs and the ne)r gi °oiv1h this prgjeel developer is pi-oposing. As a business oirner in Palm Beach Gartlerns, 1 ask you to support their request by voting "YES" for expanding uses in Northcorp to inch +de the Medical Uses being requested by the petitioner. Our return fax # is 471 -1201 BY: Citizen u ness ner C/ -I-7-Y y Y. _TAJ6 42 AW Please print name Please print name of Business if in Palm Beach Gardens • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the Northcorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square tbot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. I'he new Medical / Diagnostic facility will bring over 200 permanent fulltirne jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type - of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: 6. Resident I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square loot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate Al will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent hilltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY. Res den • r 0 0 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursclay night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthC.orp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, ifthe petitioner is successfi►1 in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I svcppor1 the it let of iie►i, Jabs (ii it the heir, gr•orrlh this In Cleve loper i.v proho.viitg. AV a citizelr niullor bn.vitie,vs owtiel- iii Pnlin Bench Garileti.r, 1 (iA you to .wcpport their request by volhig " }'I .S "' Jor evpnwdirng rc.ve.v in Norlhcorh to iirchcile the Nlet ical U.ve.v being reque.yletl by the petitioner. rtizen / Business Ow Please print narne Our rethrr-n fax 9 is 471-1201 Please print name of Business if in Palm Beach Gardens • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold i public hearing to decide whether or not to approve new uses of land in the Northcorp. Corporate Park, which if approved, will pave the way for construction ot'an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period, 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical I Diagnostic flicility will bring over 200 permanent firlltitne jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: LeieS`� Resi ' n • � as q � I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marion. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent falltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. 1 support the idea of new jobs, and the neii, growth this project developer is proposing. As a business owner in Palm Beach Gardens I ask you to support their request by voting "YES" for expanding arses in Northcoip to include the Medical U.ves being requested by the petitioner. , BY: Citizen / usiness Owner t , rtiL� 11!85:92 12:13 '$I'2 t`UI T 11(]"x►- ..1�2 T1.11,1 1 Ef 4A CATP1. - F=u "n SUPPOR.T NEW JOB IN PALM BEACH CH +GARDENS NUV LJ--J ' y` 14 : �D_ P.02 kQ1E,M1AL FOLt 200 P RM NE BS Id AREA WITH APPROVAL On Thursday night, riovomber S, 1992, the City Council of the City of Palm Peach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an $7,500 square foot Medical / Diagnostic facility immediately sood) of the Marriott. In addition, if the petitioner is successful in obtaining the now uses requested, he will build an additional 40,000 squarq feet of ofl;ico / industrial support service space immediately to the east of the new Medicat / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail . and service businesses in the area during the 18 month construction buildout period; 2) the .Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding, existing fhailities in the NorthCorp area. Thar new Medical l Diagnosk facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. Jf you support this type of clean grow li in your community, please indicate your support by signing below, l sn�ppdrl rht►1dp�x of tne�v jnhy unto the inenl Rr4►+�th chit prc�Juct develnp4�r is prd /�c�P!►tg. As a cl[izen landlvr business owrer /it Palm Reach Garrl'eux, I ask you to support their request by voting "F& for et )wfding trees in Mortheorlp to i►rclude the !Medical Uses hehtg requewed by the petitioner. B' iti / usiness owne1 lease rant nama ' S-5— Please p n name o Business if Our return fax # is 471 -1201 in Palm Beach Gardens THf_1 P. G1 t I • SUPPORT NEW JOBS IN PALM BEACH GARDENS ii,mEWHAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in [lie NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square Foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: I) 2,000-x- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I swpporl the it let of neii joh.v alul they iteii! groar/h Ihi.v project cleveloper is propo.siirg. As cr cilizen mul /or business oiiwei- iii Palen Beoc;h Gardeti.s•, 1 ask you to .vrrppor! their requev by wmhig "YES "' Jor expanding rc.ves in Norlhcoip to itichrde the Nletlical U.ves being requeslecl li►, the pelilioner•. } r BY: f�'fOC� -z.� -� Citizen / Business Owner JN4-Rc DA1 kl c A L "C,-- Please print name Is Please print name of Business if Our return fax It is 471 -1201 in Palm Beach Gardens From : ACTIVE ALARMS /GOABY SAFE & LOCK 1407)964 -5347 Nov.05.1992 12:05 PM SUPPORT NEW JOBS IN a �s. On Thursday night, November 5, 1992, the City Council Of the City of Palm Beach ©�irdens will hold a public hearing to decide whether or not to approve now uses of lend in the NurthCorp Corporate Park, which if approved, will pave the way tot construction of an 87,500 square Not Medical / Diagnostic tlicility immediately south of the Marriott. In addition, if the petitioner 1A eueccssful in obtaining the now useb roquestod, ho will build an additional 40,000 square feet of office / industrial support iorylce space immediately to the out of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be croated, and these people will use existing retail and fovea businesaas in the Area during the 18 month construction buildout period; 2) the .Roadlway intersection at x.C.A, Blvd, and Altemato AlA will bo or,larged to rollCve congestion; and 3) new w$ter and sewer mains .will be lnst4flod expanding oxisting facilities in the NorthCorp area. Tho now Modlcal / Diagnostic facility will bring over 200 permanent Niltime jobs to the Palm Beach Gardens community, This means more potential wstomors for your business. If you support this type of clean growth in your community, please indicate your support by signing below, 1 support the idea rf new, jobs and the new growth this peoJed dew1oper is proposing, As a 0!112x11 urud'wr basksess owner in 1'a1111 Beach (7ardunv; I risk , vif to support Blair r0quu0 by v0019 "YSS" /or expands ?g rises In Northcorp to Include rhty 1KedlCal Uns beinfi, requested by the petitioner. , C isAn / lBusineas fawner � • oil print name t� D -D _ �� C,2-p plea" print name of business if Our roturr, fax N is 471 -1201 in Palm Dwh Cardona P01 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. 1 support the idea of nen' jobs, crud the new roivth this p oject developer is proposing. As a business owner in Palm Beach Gardens ask you to upport their request by voting "YES "for expanding uses in Northcoip to i elude the dieal Uses being requested by the petitioner. \ . l 1 0 BY: 1 \ Wei- i-1 - Citizen / Business Owner R 1 0 I SUPPORT NEW JOBS [lei PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the Northcorp. Corporate Park, which if approved, will pave the way for construction ofan 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities, in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fiilltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: L� /, I.— " Resident �J I SUPPORT NEW JOBS IN PALM BEACH GARDENS PO'T'ENTIAL FOR 200 PI.RMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which 11' approved, will pave the way for construction of an 87,500 square Foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successh►l in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buil(IOUt period, 2) (lie Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve • congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent f illtime jobs to the Palm Beach Gardens community. This means more potential customers for your business. .If you support this type of clean growth in your community, please indicate your support by signing below. 1 svrpport the idea of ne a Jobs alit/ the ne►r gron -Ih Ihix project developer- is proposing. As a business o►i,ner in Palm Beach Garclens, 1 ask yon to snppor•I (heir requesl by voting "YES" for expanding uses in Northcol p to itichide the Medical U.ve.v beitig i-equesled by the pelilioner. Citizen / Business Owner SfNM0va. . '40fA 0 Please print name • kA R.. C-L f- A � CAD 1 t iC, . Please print name of Business if Our return fax ii is 471 -1201 in Palm Beach Gardens � I SUPPORT NEW JOBS IN PALM BLACK GARDENS POTENIIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the city council of the City of Palm $each Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an $71,500 gmmire feint Medical / Diagnostic fticility immediately south of the Mxriolt. In addition, if the petiliotuer i5 successful in obtaining the naw uses requested, he will Wild an additional 40NO square feet of office / industrial support service space immediately to the east of the new medical / diagnostic Nc'slity, During the construction period the following will happen: 0. 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the ire€t during the 18 months construction buildout period: 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water And sewer mains will be installed expanding existing facilities in the Northcotp area. The new Medical / Diagnostic facility will bring over 200 permatient fulttitne jobs to the Palm Beach Gardens Community. This ineans more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I Support this idea of now jobs, and the new growth this project developer is proposing. As A resident of Palm Beach Gardens I ask you to support their request by voting "YES" for sxpanding uses in Northcorp to include the Medical Us *s being requesstod by the petitioner, BY: Reaident» Z0a LILT 'ON zianA �n SZ : T T 26 /90 /T T � I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marion. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of netiv jobs, and the new grotinth this project developer is proposing. As a business owner in Palm Beach Gardens I ask you to support their request by voting "YES" for expanding rises in Northcorp to include the Medical Uses being requested by the petitioner. BY: 181wlc Citizen / Business Owner Cl 0 SUPPORT NEW JOBS I_ PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate park, which if approved, will pave the way for construction of an 87,500 square Foot Medical / Diagnostic futility immediately south of the Marriott. In addition, ifthe petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office/ industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction blllldollt period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent Iulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I .wgppoi-1 the it o/'neII, joli.v alit/ the ne rn gi-mvih Ihi.v project tleveloper is propo.viijg. As tr cilizen and or hu.vine.vs ou tier ill 11crlm Beach Garcleri.v, 1 avk yon to .vtrpport !heir reluesl by voliiig "YES" .161- experwcling n.ves in Norlheorh to inehicle /he A4etlical U.ve.v heirrg r•eque.vlecl by the peliliorrer. Our return fax 11 is 471 -1201 BY: Cit' en 1/usines Owner Please rint name Please print name of Business if' in Palm Beach Gardens NOV 4 -•92 WEI) w 1!5 :.!54 CATAL -PUMO .SUPPORT NEW JOBS IN- PALM POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPIROYAL On Thursday night, November, S, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. in addition, if the petitioner is successful in obtaining the new Uses,requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction .period the following will happen: 1) 2,0004- construction related jobs will be created, and these people will use existing retail. and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd, and Alternate AtA will be enlarged to relieve congestion; 3) and new water and sewer mains will be installed expanding existing facilities in the NorthCorp area: The new Medical / Diagnostic facility will bring over 200 permanent fulltitne jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth In your community, please indicate your support by signing below. 1 support the idea of new jobs coid the new grawth this project developer ly proposing. As a business owner in Palm Becrch Gw-41ens, 1 ask you to support their request by voting "YF,S "for expanding uses in Northeorp to inchrde.the Medical Uses being requested by the petitioner. C.itr n JAME K.. LE A.I.-A-. MANAGER OF ARCHITECTURE, MOB LAND DEVE_ ._� (FL) ease print name: 4672 HOLLY DRIVL ZA121 BEACH GARDENS Please print name of €aK9W!fx Residence Our return fax 9 is 471 -1201 in Palm Beach Gardens FROM • r" I L 9. 3.1987 3:46 SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIEQR 200 PERMANENT JOBS IN AREA W 't`H APPROVAL On Thursday night, November 5, M2, the City Council of the City of Palm Beach Gardens will hold a puhlic hearing to decide whether or not to approve new uses of land in the NorthCorp, Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott, In addition, if the petitioner is successful in obtaining the new user: requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000* construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd, and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area, The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support community please this type of cyan growth in your indicate,your support by signing below. 1 srrpporl the Ith,ey g1tiell' jab's, and the ?few growth this project r.Icr►'efi per Is prolan,ehrg. Ay a buVne.cs 'ov iier In 11alrn Becrc.h .(aa1'ekn.s 1 ask you m Sril)1wrr Melt, requeV by Whig "YES" fir ex /xrnding rises in Northemp try include the Medical Uves being regtiested by the pefilloner. , Citizen / Bt sines Owner F.12 FROM 9. 3.1937 3:45 • I SUPPORT NEW JOBS IN PALM BEACH GARDENS I?Q'I'ENTIAI. RDR 2t)0 PCRnJANENT JOBS IN AREA WTI# APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a puhf is hearing to decide whether or not to approve new uses of land ,in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott, in addition, if the petitioner is 9uCCeMil in obtaining the rim uses regUested, he will build an Additional 40,000 square feet of office / industrial support service space immediately to the cast of the new medical / diagnostic facility. During the construction period the following, will happen: t), 2,000+ construction related jobs will be created and These people will use existing retail And service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; 3), new water and sewer mains will be installed expanding existing facilities in the Nomlicorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulitime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean grom,th in your community please indicate your support by signing below$ l stgj pore the !clan of nmil.joh.v, and the new gr( vih th1.v1)rryev1(levelolyer is proposing. As a hresl►tecs ort'uer in 1'17ln► Beach (.;ardens 1 ask yc>rr to suly)ot-t their request by voling "YES" for ex )anding nse.v in Norlhemy) to Include the Afedival Uves heing requested by the pelllioner. ✓ 'tizen / Business Owner F.11 • 1 -1 SUPPORT NEW JOBS IN PALM BEACH GARDENS NQ' ENT[A rOR 200 PERMANENT JOBS INi ARRE�, WITH AP'E&Q AL On Thursday night, November 5, 1992, the City Council of the City of P41m Beach Gardens will hold a public hearing to deckle whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 sgvara !'not Medical / Diagnostic litcility intntediately south oflite Mariott, to addition, if the politioner is successful in obtaining the new rises requested, he will build an additional 40,000 square feet of office /industrial support service space immediately to the east of the new medical J diagnostic facility. During the construction 1)eriod the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during Cite 18 months construction buildout period; 2). the Roadway intersection at R.C,A. Blvd. and Alternate AlA will be enlarged to relieve congestion; 3). new water and sewer mains wilt be installed expanding existing facilities in the NorthCorp area, The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community, This moans more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below, I support the idea of now Joba, and the new growth this project developer is proposing. An a resident of Palm Beach Gardens I ask you to support their reju:�st by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. 7 - BY t G' Res Ant Marl L /Chf..sir�� �J tJGl1 –r35 — '2 TF{U 05:55 t U: PnY- ' ER– EZ"P_U'rF7 TEL WO: is t ?– E.SCa, � -*E• r H:�: i'tit 1 -1 SUPPORT NEW JOBS IN PALM BEACH GARDENS NQ' ENT[A rOR 200 PERMANENT JOBS INi ARRE�, WITH AP'E&Q AL On Thursday night, November 5, 1992, the City Council of the City of P41m Beach Gardens will hold a public hearing to deckle whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 sgvara !'not Medical / Diagnostic litcility intntediately south oflite Mariott, to addition, if the politioner is successful in obtaining the new rises requested, he will build an additional 40,000 square feet of office /industrial support service space immediately to the east of the new medical J diagnostic facility. During the construction 1)eriod the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during Cite 18 months construction buildout period; 2). the Roadway intersection at R.C,A. Blvd. and Alternate AlA will be enlarged to relieve congestion; 3). new water and sewer mains wilt be installed expanding existing facilities in the NorthCorp area, The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community, This moans more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below, I support the idea of now Joba, and the new growth this project developer is proposing. An a resident of Palm Beach Gardens I ask you to support their reju:�st by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. 7 - BY t G' Res Ant Marl L /Chf..sir�� �J I SUPPORT NEW JOBS IN PALM BEACH GARDENS PO(1'ENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40.,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction b1111CIout period, 2) the • Roadway intersection at R.C.A. Blvd. and Alternate A1A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. 0 The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, Tease indicate your support by signing below. l support the idea o /'ne►i� john c7ne! I/re� iren� �,�r'o►��/h /his pi'oj�c! develok�er' is hropr�.�iirl,�. As cr citizen anchor brfshies.y ou,ller in Palrrr Beach Gardens, 1 ask you to .�trp /nor ! theh* request by rolingr "YES" for expandiirg tr.jes irr Nonhcorh to hichrde the Nletheal Uses beitrg reqrresvecl by the pe/itioner. BY: 4vze' L 4-,4 Citizen / Business Owner Rde' r '& 1il1�YS1c_ Please print name Please print name of Business if Our return fax If is 471 -1201 in Palm Beach Gardens SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 NGRIVIANGN'1' .1013S IN ARPA WITH APPROVAL On 'Thursday night, November 5, 1992, the City Council of the City of Palnl Beach Gardens will hold a public hearing; to decide whether or not to approve new uses of hind in the NOrthC'Orp Corporate Part:, which if approved, will pave the way for constr(lction ol'an 97,500 square loot Medical / Diagnostic facility immediately sOUlh of the Marriott. In addition, if the petitioner is successful in obtaining; the new uses requested, he will build an additional 40,000 square legit ol'of7ice / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000.1- construction related jobs will be created, and these people will use existing; retail Mid service businesses in the area duffing the 18 IIIONh COnsLlllCUOII blllld(1ut pe11C)O 2) the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing; facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring; over 200 permanent filllume jobs to the Palm Beach Gardens community. This means more potential customers for your business. It' You support this type of elegtn growth in your• community, please indicate your support by signing below. I .err /� /)nr I 1 {ie iclr�r a /ire ►I juh.� ir►rcl l {r� rr(►t ��r r)►11 /r Ilri.� j�roje(.'I c %velu�)er i.� /)rt) /)n.�iitg,�. As it eilizerr mul"or busirre.vs mi,lier hi Pohn Beach Carilerrs, I ask yorr to suppor•l llreir reque.vl by ►u)lirrsr "1'L'S "' Ji)r expcuulilIg u.ve.v in Norlhcoip to irrelmle 1he A4edical Uve.v behr g reque.vled by the peliliorrer. 11Y:LC&,Ata ,� l S &'l 35 ACE- gat L Clti"len / Business Owner dose W Please Ant name . V A • ease rint name !'B .iness if Our retui n fax i/ is 471-1201 in Palm Beach , ens • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City _of Palm Beach Gardens will hold a public hearing to decide - whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your conmmu -pity please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: ( Res dent I SUPPORT NEW JOBS � l PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marion. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth ' in your community please indicate your support by signing below. 1 support the idea of new jobs, and the new gro►vth this project developer is proposing. As a business owner in Palm Beach Gardens 1 ask you to support their request by voting "YES" for expanding uses in Northcoi/.) to include the Medical llses being requested by the petitioner. Vitizen / Business Ownet`\ 0 I • SUPPORT NEW JOBS IN PALM LEACH GARDENS POTENTIAL FOR 200 PERIVIANGN'1' .10135 IN AREA WITH APPROVAL Orr Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold it public hearing to decide whether or not to approve new uses of land III the NordiCorp Corporate Part:, which 11' approved, will pave the way h)r construction ol' an 97,500 square Im Medical / Diagnostic facility immediately south of the Nlarriott. In addition, if'the petitioner is successful in obtaining the new uses requested, he will build an additional '10,000 square feet of ollice / indLISt6al support service space immediately to the cast ofthe new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000-1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 19 month construction bUlldout period; 2) the • Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. i r yon support this type of clean growth in your community, please indicate your support by signing below. I support Ilia ic let r ol'nr►ijobs 11n4 1 llrc lien, grorr /h Ibis projecl developer is proposing. As it cili °err caul,"or hrr.s•incss mvncr ir► Perlin B och Carden •, l crsk yon to srrpporl llrcir )-egiie.sl by voling °YA S" /or exponding rises in NorNreorp to inc:•hrde The A edicxrl U.ve.v heing requested by Me pelilioner. lCitizen / I3usinels�Jwner Please print name Cfh2t — Please print name of Business if S 7 01? Our return tirx /t is 471 -1201 in Palm Beach Gardens P S • � i SUPPORT NEW JOBS IN PALM BEACH GARDENS On Thursday night, November. 5, 1942, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if Approved, will pave the way for construction of an 87,500 square foot Medical I Diagnostic facility immediatoly south of the Madott. In addition, if the petitioner is successRd in obtaining the new uses reques(ed, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following wiill"hat)pen; 1). 2,000+ construction related jobs will be created and those people will use existing retail and service businesses in the area during the 18 months construction buildout period, 2). the Roadway intersection at R.C.A, Blvd, and Alternate AiA will be enlarged to relieve congestion, 3), new water and sewer mains will be installed expanding existing Ncilities in the Northcorp area, The now Medical / Diagnostic tiieility will bring over 200 permanent fulitime jobs to the Palm Beach Gardens Community, This means more potential customers for your business, If you support this type of clean growth In your community please indicate your support by signing below. l sul)porl the 141ed q1 twirl jobs, and the new grrni1r1; flits project develol >er Ls prol)oving. As a butlne.cs owner lit 11alm Beach Gardens i ask you to milgwrl their request by wring "YES" for exp andIng uses in Ndrlhcoq to Inchale the 11Ue tval Ares being requested by the pellllaier, - -�iti ~ ! is nes9 Owner C� NOV— 5-92 THU 17:13 P.01 • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to appr_ove_new_ uses oNand — in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate Al A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in _your_ — comma -n -ity pease ^indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting FsS" for expanding uses in Northcorp to include the Medical being requested by the petitioner. f BY: r� sidefit • I n LJ SUPPORT NEW JOBS I PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marion. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. 1 support the idea of neu jobs, and the new groivth this project developer is proposing. As a business ou ner in Palm Beach Gardens 1 ask you to support their request by voting "YES" for expanding uses in Northcoip to include_ the Medical U.ves being requested by the petitioner. A BY: Zolgmwe Ajj Citizen / Business Owner ij t4 0ti:'— S — 2* -rHu • i 0 1 = 213 RRO PER I _rY SUP Rrr NEW SOBS ITI PALM BEAC L FOR 200 PERMA On Thursday night, November 5, 1492, the Gardens will hold a public hearing to decide w in the NorthCorp Corporate Park, which if apt of an 87,500 square foot Medical / Diagnostic In addition, if the petitioner is successful in obt8 an additional 40,000 s(luare feet of office 1 incur the east of the new Medical / Diagnostic facility Dut•ing the cor►structiort pceiod the foil 1) 2,000+ construction related jobs will be crea and service businesses in the area during the 18 Roadway intersection at R.C,A, Blvd. and A congestion; and 3) new water and sewer n- f,,icilitics in the NorthCorp area. DREDf- I "C; F• - 0 1 GARDENS IN" FII ity Couticil of 111e City of Palm BeilCli other or not to approve rim uses of land oved, will pave the way for Construction icility immediately south of the Marriott, wing the new uses t•equcsted, he will build rial support set-vice space immediately to mirig will Imppen: �d, and these people will use existing retail nonth construction buildout period; 2) ilia ternate AlA will be enlarged to relieve gins will be installed exp7nding existing The new Medical / Diagnostic facility will brim an over 200 permanent fulltinic jobs to the Palm 'Beach Gardens community. This means ore potential customers for your busincss. If you Support this type Cotatntunity, please indicate yo I srtl?Imrt the i&a c>f imt' obs and llie new gri a eilize)t atttl,nt, bu.citte.r.s (miller in Palm B regile.st by tinhig "YES" fir eycmdhig ttse,c heing requested by tilt' petilioner. Our return fax # is 471 -1201 'f clean growth in your I- suppol-t by signing below# ti th A v h C firdens, 1 a.rk you to stq)Jtort llieir Nvrthcoth to Inc:hrrle the Afrdict71 UWS n / Elusi6e-S4 Owner Fes':.. Ll_..r2�5 ease Print r'iame ease print nan)e of Busirle,SS if in Palm Beach Gardens ----------------- ..-- E------------------------------------------------ 0 I SUPPORT NEW JOBS fN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,100 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This rneans more potential customers for your business. If you support this type of clean growth in your co mMUnit_y. please __indicateyouur support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: • • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will bold a public hearing to decide whether or not to approve new uses of land in the Northcorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the No* rthcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. IT you support Ibis type -of clear growth try your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. Resident 11/04/92 11:45 '$407 694 3009 OUTLAND REVEL CO I SUPPORT. NEW JOBS I PALM 13EACH GARDENS On Thursday night, November 5, 1992, the City Council of the Clty of Felt" Beach Gardens will hold a public hearing to decide whether• or not to approve new uses of land In the NurthCQrp, Corporate Paris, winch if approved, will page the way fbr constmetion of an 87,504 sgtrnre tom Medical / Din4110160 thcliity Immediately south of the mariott. In ddditlon, if the petitioner is FucccssNI In obtaining the now uses teriuested, he will build an additional 40,000 Square feet of office 1 Industrial support service space immediately to the salt of the new medical / dIgnonle 1ht;iiily. During the construetlot► pet'lod the following will happen: Z). 2,000+ construction related jobs will be created and these people will use existing retail and service bu.slnesses In the area during the 18 months construction Widow period; Z), tbo Roadway Interoectien at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new wAter and sewer moles will be Installed expanding existing fhc1litles in the Northcorp armt, The now Mediad / Diagnostic facility will bring over 300 permanwit fulltlme fobs to the Palm Beoch gardens COmtnunity. This meting more potential cuBtomers for your businem If you support this type of clean growth 11) your community phase indicate your support by signing below. 1 suppott the Idea of new jobs; aNd rile 11CH' groWtlt rhfs f3r0ject clevetolvi- M propoming, As a bte,tlness oulner hr Palter Beach Crardetts I ask You rrt 31tifnt't their request by voting "YAS "for expatrdlnig 11ses lit A101- theoil) fo Inoltrefe the J1-fpOW Uses behig requeved by rho psrltf mer. BY: / Su r ii e Q002 • I SUPPORT NEW JOBS 10 PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 sgUA e 1`60t Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate-your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. v AIL .i Resident FAX 4074718789 CATALFUNO CONST w I ' SUPPORT NEW JOBS IN PALM BEACH GARDENS P _ 0? s A A U V I,c 0 On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction ot'an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott_ In addition, if the petitioner is successftil in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: • t) 2,000+- constnuction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the Roadway intersection at R.C.A, Blvd. and Alternate AIA will be enlarged to relieve congestion; and J) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. • The new Medical / Diagnostic facility will bring over 200 permanent fbiltime jobs to the Palm Beach Gardens community, This means more potential customers Ibr your business. If you support this type of clean growth in your community, please indicate your support by signing below. I suppurt the idea of'neit jabs arnl the neii, g7•vu-1h this prryect tie %,eloper is proposing, As a caner; utidlror husiness outlier In PoIny Retych Gardens, 1 ask you to mipport their request by voling "YLsS" fiot- exPcn►ding usves in Northcorp to Include the Medleol Uves being requested by the pelllirnrer. BY dlen usiT Owner Our return fax if is 471 -1201 Please print name Please print name of Business if in Palm Dzach Gardens Pn2 • • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PEIIMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction ofan 87,500 square floot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing; retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you -support this type of clean - growth i'n yo;!r community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner:. BY: �.- 6 Aipfl eat Resident M0 %.- — S -19 . -r HU 1 0 -- 4'+v 0 r- I PR0SPE I -FIV DREDG I "G I SUPP RT NEW HOBS PALM REAC A GARDVNS RS IN AREA NVFFH A PP On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardciis will hold a public hearing to decide Actlier or not to approve new uses of land In the NorthCorp Corporate Park, which if Ap roved, will pave the way for construction of An 87,504 square foot Medical / Diagnostic acility immediately south of the hlarrlott. In addition, if the petitioner is successtld in obti fining the new uses requested, he will build an additional 40,000 square feet of office / ilidir trial support service space Immedialely to During the mistruction period the follbAvffig rvill happen: J) 4,80(31 1,V1011MAIVII VJQI -4J jvt.'p V"111 tl -;. ti+4 GPI �-� tlf 111 rt14.,4i y \ft%tti Y1llt L43%; V•�.ilng 1'GF[1It and service businesses in the area during the 18 month eonaruction buildout period; 2) the Roadway interection at R.C.A. Blvd. and alternate AlA will be enlarged to relieve congestion, And :1) new water and sewer n sins will be ins-talled expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will brim ove,• 2001permarieni fulltinte jobs to the Palm Beach Gardens community. This means more potential customers for your business. ff you Support this type f cleats growth in your• community, please indicate yoit r support by siping Uelom I suppw-t the Oea of nesiJohs aril the neiv grr) r-th this preyect clevelolmi- is proposing. As it citil-ell coul'6r business dime►• /it A-1hyt Be rch Gordens, I avk you to .stgq?or't lhelr request by uoli►tg "Y1s " ".S'" fir - 0- yam-Iiiig use-v ht Noalicolp to Inc:luele the kfe(licol Me.s being requested by the petilloner. Qur return fax N. is 471 -1201 ,,en /')-ius'lness Gwner'` SIB. OA t�� 1►U se pritlt rtartze P _ ti-1 '? _ _macc,, t� ►��t V� � l� . else trill t ame of Business Rf , in Palm Beach Gardens - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 't - ^ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I i • S• • rna YvrY�ioro�- - I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City .Council of the City of Palm Beach Gardens will hold a public hearing to decide whether, vr'not.to approve new uses of land in the NorthCorp Corporate Park, which if approved; will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of otliee / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction ,period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A, Blvd. and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area, The new Medical / Diagnostic facility will bring over 200 permanent fulitime jobs to the Palm Beach Gardens community. This mean$ morc potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I support the idea rlf'new jabs and the new growth this project developer is proposing. As u citizen andOr business owner in Palm Beach fGrdens, I crsk �vmi to support their request by voting "YESr fir expanding uses in Northcorp to include the Medical Uses being requested by the tI eti #toner . 64a , U4 A A 1, aa4, t� Citizen/ Business Owner Our return fax ft is 471 -1201 BY Please print name Please print name of Business if in Palm Beach Gardcns • c• • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS: IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way 'for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and, these people will use existing retail and service businesses in the area during the 18 month construction buildotlt period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area, The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your Community, please indicate your support by signing below. I support the idea of new jabs and the ne►v growth this project developer is proposing. As u cili en and%nr busluess owne►• in Perlin Beach Gardens, f ask �VQIJ to m4pporl their request by voting "rE S for expanding uses in Alorthcorp to include the Medical Uses being requested by the petitioner. Our return fax li is 471 -1,201 BY: C' tiz I Busi ess Owner Please print n me 0 �" CSc Please print name of Business if in Palen Beach Gardena I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November S, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: is 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion, 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your'support by signing below. I suppor/ the idea of neir johs, and the neiv gr•o►v11i lhi.v pr•t jecl de i elopei-1.v proposing. A.v a busine.vs o►►mer hi Palm Beach Gardcnv I ask yorrr to suppor/ 1heir requesl by nolirng "YES" for expantlhig uses in Nor•themp to inchide the Medical U.ves being requested by the petilioner. , BY: Citizen / Business Owner is 92r - -X� -4-1-L CAL P� A7,q- I SUPPORT NEW JOBS IN .PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marion. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate Al will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent falltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. 1 support the idea of neti>> jobs, and the ner>> groiwth this project developer is proposing. As a business ou ner in Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northem y-) to include_ the Medical U.ves being requested by the petitioner. 0 4 BY: %) i) Q $I � � � Cit n / Busin s wne I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. 1 support the idea of nen, jobs, and the new growth this project developer is proposing. As a business owner in Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcolp to include the Medical U.ves being requested by the petitioner. BY: itizen usiness Owner 1 • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square loot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: is 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: `- R sident U 11 SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an • additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: �tesident 0 Cl I SUPPORT NEW JOBS IN PALM BEACH GARDENS 1'OTLN7'lAt, FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way fa• construction of an 87,500 square foot Medical / Diagnostic facility immediately south of (lie Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in. your community, please indicate your support by signing below. I a'uppor/ the idea (? /' lie 1fjabs ntrcl the nc•n� gl-on,/h lhi.y pi ojecl clei?elol)el- i.v 1)roj)o.si11g. AV a citizen and (W business owner in Palm Beach Gardens, I a.vh you to supporl their request by voting "YES" for exparndirng u.ve,v in Norlhcah to include the Medical U.ve,v being regiieavecl by the petitioner•. Our return fax # is 471 -1201 BY: Citizen / Business Owner Please print name Please print name of Business if in Palm Beach Gardens • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successrul in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. 1'he new Medical I Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type . of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being reques'-.ed by the petitioner. BY: f/ Resid nt I • SUPPORT NEW JOBS IN PALM BEACH GAM)ENS POTI,INTIAL FOR 200 PERMANENT .1O11S IN AREA WI'1'11 APPROVAL, On Thursday night, November 5, 1992, the City Council of [Ile City 01' Palna Beach Gardens will bold a public hearing to decide whether or not to approve new uses of land III the Nor(hCorp Corporate Park, which if approved, will pave the way lilt construction of an 57,500 square loop Medical / Diagnostic facility immediately south of the Mar►'ivlt. In addition, il,the petitioner is successful in obtaining the new uses requested, Ile will build an additional 40,000 square leet of office / industrial support service space immediately to the east ol'the new Medical / Diagnostic facility. D111-in the construction period the following will happen: 1) 2 000 i construction related jobs will be created, and these people will use existing retail and service businesses in the al-ea during the I5 month C01IS011CUo11 buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic lhcility will bring over 200 permanent fulltinae jobs to the Palm Beach Gardens community. This means more potential customers for your business. li' you support this type of* clean growth in your community, please indicate your support by signing below. l .�•trpporl Ihr is %cr ultrc�u� joh.�• cntcl Ilse ne►I� ljrolrlh llri.� l�roje -c.•I c %�►�c�lu��ei• i.�• hrn��u.�iii�,�. f1.1• o eilizctt cr d'or bits-iltess owner itt l'ohn Becrch Gardens, l euk j,ou to snpporl llreir requev b)) volhW 'Th S" Jiv expandittg mve,v in Norlhcoip to include the All dicct/ Uv .s- being re que.wed by Me pe ilioiier. BY: citizen / 3us►ness Own J J -ev) n:Ver L . Alrr_y Please print name . �t?�✓1 6-c'I 0, rev Please Tint na of Buki�ess if Our return llx // is 471 -1201 in Palm Beach Gardens I SUPPORT NEW JOB fN PAL1'V1[ BEACH GARDENS 1'OT ,NIIAL E01! 2 00 PERMANL T JOBS IN AREA WITH A_,,.1PX tQYAL On Thursday night, November 5, 1992, the City CoUnCil Of the City Of Palm Bench Gardens will hold a public hearing to decide whether or not to approve new uses of tend in the NorthCorp. Corporate Bark, which if approved, will pave the way for construction of an 87,400 s(Itrare Fool Medical / Diagnostic facility immediately sokrth of the Mariott. In addition, if the petilioner is successful in obtainirtg the new uses requested, lye will build an additional 40,000 square feet of ofpiCe / industrial support service space irnmodiataty to the east of the new medical / diagnostic. facility, During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these pcople will use existing retail and service businesses in the arvi during the 18 months construction buildout period; 2), the Roadway intersection at R.C.A. Blvd, and Alternate A i A will be enlarged to relieve congestion; 3). new water and sower mains will be installed expanding existing fiscilities in the Northcorp arts. The new Medical / Diagnostic: facility will bring over 200 perrnanont Pulltime jobs to the Palm Beach Gardens Comrrrunity, This means rnore potential customers for your business. If you support this type of clean growth in your Community please indicate your support by signing below. I support the idea of new Joba, and the new growth this project developer is proposing. As s resident of Valet Beach Gardens I ask you to support their request by voting "YES" for expanding uses in NQrthcorp to include the Medical Uses being requested by the petitioner. Resident is I i SUPPORT NEW JOBS IN PALM BEACH GARDENS POTEN'HAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the wily 1101' construct1On of an 87,500 Square loot Medical / Diagnostic facility immediately south of the Marriott. Ill addition, Ifthe petlt1011er IS SIICcessful In obtaining the new Uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,0001- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction bLIIldOUt period, 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent tulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. l srrpporl the idea of ne►I� jobs anti Ihc ncll� grol��lh Ibis project developer is proposirr��. As cr cilizerr and %or business owner in Pcrlrrr Beach Carden.v, I ash you to support /heir request by volitlg "YES" Ior expanding, use.v in Norlhcog) to inclrrile the tl/leclical Uses heing r•egneslecl by the petitioner. BY: Citizen / Business Owner Our return fax It is 471 -1201 Please print name Please print name of Business if in Palm B6e &,, WH HWXW X50 Akere AiA Nk Blob QM*N„ R 3" ' -7) d a--- — , 0 -7 7 0 7 I SUPPORT NEW JOBS IN PALM BEACH GARDENS PO7'E VITAL FOR 200 1 "ERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent ful(time jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of elean growth in your community, please indicate your support by signing below. I suupporl the it let i of'ne ►v john and the ne ►i, grori,1h Ibis projecl cleveloper• is proposing. As a cilizen mul%or business or►,ner in Palm Becuch Gardens, l aslc your to suppor/ (heir reduuesl by voting "YL'S" )r expanding ruse.v in Norlheotp to include the Medical Use.v being recluuesletl by the pelilionel% BY Citizen / Business Owner Our return Pax # is 471 -1201 Please print name Please print name of Business if in Palm Beach Gardens • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction ofan 87,500 square fibot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will. be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltirne jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: R "idenf • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved; will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses.in the area during the 18 month construction buildout period; 2) the • Roadway intersection at R.C.A. Blvd, and Alternate AIA will be enlarged to relieve ' congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This mean$ more potential customers for your business. If you support this type of ' clean growth in your community, please indicate your support by signing below. I support the idea c f nexjabs and the neiv krawth this project developer is proposing. As u citizen anciOr busluess owner to 11alrn Beach Gardens, I cask yvou to support their request by voting "Y' "fior expanding uses in Ncrrthcorp to include the Medical Uses being requested by the petitioner. BY: i en / Business caner Please print name • Please print name of Business if Our return fax It is 471 -1201 in Palm Beach Gardena - rni Zvi �r iv. I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved., will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining. the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month, construction buildout period; 2) the • .Roadway intersection at R.C.A. Blvd. and Alternate -AIA will be enlarged to relieve ' congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area; The new Medical / Diagnostic facility will bring over. ,200 permanent fulltime jobs to the Palm Beach Gardens community, This mean$ more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I sypporl the idea of tiew jabs and the new growth this prglecl developer is proposing. As u citizen an4477- business owner in Palm Beach gardens, t a4 yvou to stapporl their request 17y voting "YES ", for expanding rub's in Northcarp to include the Medical Uses being requested by the petitioner. 3. Citizen / I ss Owner Please print name 0 Please print name of Bus�iness if Our return fax ff is 471 -1201 in Palm Beach Gardena 0 LIJ NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 support the idea of new_ joh.v and the new �,owth this pr(Ject developer is proposing. As a citizen and'or business owner in Palm Heach Gardens, 1 ask ydru to support their request by voting "YF.S" for expanding uses in Northeorp to include the Medical Uses being requested by the petitioner. Our return fax # is 471 -1201 BY. Citizen / Business Owner Please print name Please print name of Business if in Palm Beach Gardens 0 0 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POrhEN'11AL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate A 1 A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1.�t� /�p��r! the i�lcc� cif ne►i� jobs aircl the �te►i� �•ror►�Ih lhi.� project de►�eloper i.� pr�� /�r�.tii�ig. A.V cr citizejr mullor bushie,ys owner in Pa /m Beoch Gorden.v, ! -t.vk your to srrpporrt [heir request by voting expondirrg u.ve.v in Northcolp to inchrde the Nlet icol U.ves being reque.vtecl by the petitioner. Our return fax # is 471 -1201 BY:- Men / Business Owner Please print name Please print name of Business if in Palm Beach Gardens • I H LI F' - _ �y 1 UPPORT NEW J0 I On Thursday night, November 5, 1992, the Cardens will hold a public hearing to decide w in the Nortl,Corp Corporate park, which if app -of an 87,500 square foot Med;cil / Diagnostic In addition, if the petitioner is successful in obt,-, an additional 40,000 Square feet of office / indu the east of the new Medical /'Diagnostic facility During the construction period the full 1) 2,000+ constmction related jobs will be crew And service buSinesSCS in the area during the 18 Roadway imer;;ection at R.C.A. Blvd. and A Congestion; and 3) new water and sewer n facilities in the NorthCorp Area. The new Meifical / Diagnostic facility will bri Palm Beach Gardens community. This means f you support. this type community, please indicate Yo I .supl)ort the kfea (!f itt e jobs avid the new g1,, (t eitizen rnr&6i• business mwei- N Pahn B request by uming "Yls.S" f n, eximir4kg u e,s helrtg mejueslecl by the pelitivrter. T ity Council of the City of Palm Beach enter or not to approve new uses of land oved, will pave the way for constnuction icility iminediatcly south of the Marriott, ling the new uses requested, he will build Hal support service space immediately to m1rig will happen: �d, and these people will use existing retail Month construction buildout period; 2) the ternate AlA will be enlarged to relieve ,ins will be installed expanding existing over 200 permanent fidIdnic ,jobs to the re potential cu4tomers for yokir Visiness, if clean growth in your r support by siping below, th this project tie i,elol t— Isln,q)osing, As ch Gardens, I ask you to sir /)l�pt•t dieIr NU1'tltcvy 10 1111 141, the A-fe(lici7l Mtq zen / Busln£.ss Own .r, se print acme please print name of Business if Our return fax H is 471 -1201 1 in Palm Beach Gardens • • Pliny . CIF} Lit;: `_: Y �W AWNINGS BY ,JAY NOVEMBER D, 199E CITY COUNCIL CITY OF PALM BEACH GARDENS 10500 N. MILITARY TRAIL PALM BEACH GARDENS, FL. 33410 DEAR COUNCIL MEMBER: AS A BUSINESSMAN AND MEMBER OF THE NORTH PALM BEACH, PALM BEACH GARDENS CHAMBER OF COMMERCE, MY CONCERNS HAVE BEEN FOR THE QUALITY OF GROWTH IN OUR COMMUNITIES. IN MY OPINION THE PROPOSED MEDICAL FACILITY, DEVELOPED NY DAN CATALFUMO, I5 THE TYPE OF GROWTH THAT WOULD BE BENEFICIAL TO PALM BEACH GARDENS. IT WOULD PROVIDE AN ENVIRONMENTALLY CLEAN BUSINESS WITH OPPORTUNITIES FOR NEW EMPLOYMENT. AND CERTAINLY AN EXCELLENT TAX REVENUE FOR THE CITY. THERE WILL BE NO NEED FOR CONCERN FOR TRAFFIC CONGESTION IN THAT WITH THE ENLARGEMENT OF THE INTERSECTION OF RCA BLVD. AND ALTERNATE A1A THIS HAS PEEN ALREADY RESOLVED. I URGE THE COUNCIL TO APPROVE THE PROPOSED PROJECT. SINCERELY, JOSEPH PRINZO RESIDENTIAL • COMMERCIAL - INDUSTRIAL 1125 Broadway, Riviera Beach, FL 33404 407 -044 -4444 P.li_i'.,:; . t le, 192 CIF.: SA t • AWNINGS BY JAY NOVEMBER t, 199€ CITY COUNCIL CITY OF PALM BEACH GARDENS 10:500 N. MILITARY TRAIL PALM BEACH GARDENS, FL. 33410 DEAR COUNCIL MEMBER: F.2 AS A BUSINESSMAN AND MEMBER OF THE NORTH PALM BEACH, PALM BEACH GARDENS CHAMBER OF COMMERCE, MY CONCERNS HAVE BEEN FOR THE QUALITY OF GROWTH iN OUR COMMUNITIES. IN MY OPINION THE PROPOSED MEDICAL FACILITY, DEVELOPED BY DAN CATALFUMO, IS THE TYPE OF GROWTH THAT WOULD BE BENEFICIAL TO PALM BEACH GARDENS. IT WOULD PROVIDE AN ENVIRONMENTALLY CLEAN BUSINESS WITH OPPORTUNITIES FOR NEW • EMPLOYMENT AND CERTAINLY AN EXCELLENT TAX REVENUE FOR THE CITY. THERE WILL BE NO NEED FOR CONCERN FOR TRAFFIC CONGESTION IN THAT WITH THE ENLARGEMENT OF THE INTERSECTION OF RCA BLVD. AND ALTERNATE AIA THIS HAS REEN ALREADY RESOLVED. I URGE THE COUNCIL TO APPROVE THE PROPOSED PROJECT. SINCERELY, / f r 4' JOSEPH PRINZO RESIDENTIAL • COMMERCIAL • INDUSTRIAL 1125 Broadway, Riviera Beach, FL 33404 407 -844 -4444 I SUPPORT NEW JOBS M PALM BEACH GARDENS POTENTIAL FOR 200 PEI2IVIANENT .1O11S IN AREA WITH APPROV Oil "IThursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way liar construction of an 87,500 square loot Medical / Diagnostic facility immediately south of the Marriott. In addition, iFthe petitioner is successful in obtaining the new uses reduested, he will build an additional 40,000 square legit 01'0111ce / industrial support service space immediately to the east of the new Medical / Diagnostic Facility. During (lie construction period the following will happen: 1) 2,000 -1 construction related jobs will be created, and these people will use existing retail Mid service businesses in the area durir►g the 18 month construction blllld011( period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve • congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs lip the Palm Beach Gardens community. This means more potential custon►ers For your business. It' you support this type of clean growth in your community, please indicate your support by signing below. I . upporl !lit, idea a /*»e I1,./oh.,• mum the //c tt! groii -M this plpjecl Ile ve loper is / roposilig. As u ciliZeil mul' "or bits less o►viier ill Pahn Reach (Gardens, / tisk .),oil to si ppor/ /heir reques•/ ley volii� r expcnlililiq lists in Norlhemp to hichah the k1pi/ival Uves being rer /uesled by the pelilioner. BY: OWaleZUitizen / Business Owner P Please print nam�rYl�� 0 Please print name of Business iF Our return lax // is 471 -1201 in Palm Beach Gardens 0 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the Northcorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Patin Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY : Resident 9 I • SUPPORT NEW JOBS IN PALM BEACH GARDENS POTEN'1'IA1, FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. n U The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 mq)j)orY the it1e(i c? /'lie ►rjoh.v aiic! the AV ci eilizeii awl/or frrlshiess ouwel- iii Palrn Beach Gcirderl.v, I ask you to suj)por•! !heir request by volhT "YA " %or exhciwling ii.ve,v in Norlhcoip to inchule the Allechcal Uves• being r•equeslecl by the pelilioner. Our return fax 11 is 471 -1201 BY: a'Ot& P °G'l,{,j�r ' Citizen / Business Owner .oder�ck b< feicce Please print narne Please print name of Business if' in Palm Beach Gardens • • • SUPPORT NEW JOBS IN PALM BEACH GARDENS I'OTEN'FIAL FOR 200 PERMANENT JOBS IN AREA WIT1-1 APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction bUlldout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. .vurppor/ /he k /ea a/ rrc ►► jc�hs cunt{ lhE irc ►ir �ri'o►rlh lhi.� pr njc�cl c %vc� {raper' i.� ��ropc�sing. As a busine.v.v ouwwr in l'ahn React Ccirilerzv, I a.vk your to snppo1'1 (heir reyrre.vl by voting "YLS" firr expcirrding ruses in Noi'Iheorp to include the Meciccil Uses beung i•equemed by the petitioner, n Our return fax # is 471 -1201 rV Please print nam Please print name of Business if in Palm Beach Gardens 46 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA wini APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which 11' approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000 -1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve • congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. 0 The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I support the i(lecr (?/'ne II, johs alit/ the nc n, gi- o►i!lh this hrojecl ilevelol)er is /)ropo.silig. AV a lrn.viness ouwwr in l'ahn Reach Gardens, 1 a.vk you to .vnppor•t their reque.vt by voting "YES "fin- expanding nse.v in Northem y) to inchide the Medical Uw.v being equested by the pelilionel% Our return fax # is 471 -1201 21WA MUMMs v �aSa Q 116 cam. Please p ►nt name Please print name of Business if in Palm Beach Gardens • 0 I SUPPORT NEW JOBS a PALM BEACH GARDENS POTENTIAL. FOR 200 PERMANENT JOBS IN AREA wrrl-1 APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which ii' approved, will pave the way for construction of an 97,500 square root Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 19 month construction builCIOUt period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent Pulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 su1)1)o1.1 the hlea of ueu jobs and the weir grou!lh ihishrojecl (1eve1o1)e1• i.vl)rnl)osing. As a business oiruer in Palm Reach Gartleus, I a.vk y,ou to supl)orl their request by voling "YES" fi)r• eqn- imliug uses in Norlhcoil) to inchide the Meili IV, l Uses being requested by the heliliotier. BY: _ Citizen / Business (Wrier C- I Inlet Please print name Please print name of Business if Our return fax # is 471 -1201 in Palm Beach Gardens. • 6 • r: i to i �� �ninr�rcm�z �r��ai I SUPPORT, NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, ,which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction; related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A, Blvd, and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains ,will be installed expanding existing facilities in the NorthCorp area, The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community, This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I .support the idecu of'nevr jabs and the ne►v growth this projecl developer is proposing. As u cidi:.en and Or business owner in Patin Beach Gardens, t ask �yQu t0 sarpport their request by voting "Yfs',S ' for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: Citizen / Business Owner Our return fax # is 471 -1201 Please print name Please print name of Business if in P41m Beach Gardens 1 V& 0 I SUPPORT NEW JOBS fN PALM BEACH GARDENS POT14,N rtt�. 0R w00 PERMANENT JOBS IN AREA WITH APPROVAL On Tinursday nillii, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whettier or not to approve new uses of land in the NorthCorp Corporate Park. which if approved, will pave the way for construction of an 97,500 siluni e fcxtit Medical ! Diagnostic facility immediately solid► of the Mariott. lrn addition, if the petitioner is sriccessful ill Obtaining the new uses requested, he will build an additional 40,000 square feet or A= / industrial s ►.tpport service space immediately to the east cif the new medical 1 diagnostic facility. • Duritig the constructiost period the following will 1111ppen: 1), 2,000+ construction related jeans will be created and these people will use existing retail and set -Vice businesses ill lite area during (lie 18 months construcilen buildout period, 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical I Diagnostic 01cility will tiring over 200 permanent flttltime jobs to the P81111 Beach Gardens Community. This means more potential customers for your business, If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of palm Beach Gardens X ask you to support their request by voting "YES" for expanding uses in Northcorp to 1,nq/lude the Medical Use sing re�quest,ed by the petitioner. / —0,M% // BY: • HOWARD C. ROLLINS, M.-D. 40 SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate Al A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community, This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I support the idea of new joh.v and the new growth this project developer is proposing. As a citizen a?id %or business owner in Perini Beach Gardens, 1 ask you to Support their regrioct by NOtinR "YF,S" for expanding uses in Northcorp to include the Medical Uses heing requested by the petitioner. BY: Pitizen _ / Business Owner L Please print name Our return fax # is 471 -1201 Please print name of Business if in Palm Bcach Gardens SUPPORI NEW JOBS IN :i ,,• `�, POTENTIAL 200 PERMANENT JOBS IN AREA REA y IT111 APPROVAL On Thursday triplet, Novembrr .5, 1992, the' City Council af' the City of balm Beach Qli'devs will hold a public huring to decide whether or nor ro approve new cues of hind in the NorthC orp. Corporate Park, which i appr'oved, wilt pave the way i'or cons(roction cif to 87,5500 square lire l Medical / 04ignostle facility immediately youth of the Mah,-.It. in addition, il`the Petitioner is sucees5lul in obtaining; the new uses requested., he will build art additional l0,000 square feet of office / industri;tl ssrppart service space immediately to the east of the liew medMll / diagnostiq P46lity. During the eonstruction period the following will lml)lml: 1). 2,000-r construction t'clated lutes Nyill be created anti there people: will use existing retail . and service IJUSinesses in ilze lrea duril'trg the 18 months construction buildout period; 2). the Roadway intemetion at WC,A, Blvd, and Alternate AlA will be onlarfed to relieve Congestion; :3), new water and sewor mains will be installed expanding exisling tacilities in the Nortkorp area. The new Mvditltcl / Diagno5lic I;tcility will bring over 200 permanent fulltime, jobs to the Palm Belch Gardens C'ormnunity, This means more. potential customers for your business. If you support tthi4 type of clean growth in. your eommullity plerlse indicate your Support by signing below. 1 , rlpJ)01'/ /171 ickrr Of'11(11' jok, t-md the tiew gmirlh llrk1)twjet:1 (lei,elope)• is•pmposhig. A -ti• o hrr.,h?esy mi,iiet- It) Polm llvoc'lr (;e71,&w.i' 1 risk ,Wu to s1t1)1x01'J the <i , 1'eg1test by liolttlg f014 e.Vp1'Jt1(1%1Jtr itl Noillivow to iltclude tlis} Aledliec:rl, l/,5'c�,s l�erlrlr tE'grr��.slc�il by lire peliihitret., Citizen i BrrS'lness Q C� SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPRQVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square. feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) Z,UUU+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. 0 The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community, This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below, 1 support the idea of new. joh.y and the new }growth this pr( jest developer is proposing. As a citizen and;or husiness owner in Perim Beach Gardens, ! aVk ycm to slipport their request b}, voting "YF.,S" for expanding uses in Northeorp to inclucle the Medical Uses being re yuesiecl by, the petitioner. Our return fax # is 471 -1201 �. BY. Citizen / Business Owner Please print name Please print name of Business if in Palm Beach Gardens E I SUPPORT NEW JOBS ME PA LM BEACH GARDENS POTENTIAL FOR 200 PERMANIW—F JOBS IN ARh:A WITII APPROVAL Oil Thursday night, November S, 1992, the City Council of the City of Pahl Beach Gardens will hold a public hearing to decide whether of not to approve new uses of land in the NorlhCorp Corporate Park, which if approved, will pave the way l lr conslruction ol'an 87,500 square loot Medical / Diagnostic facility immediately south of the Marriott. lu addition, il'the petitioner is successful in obtaining the new uses requeste(l, he will build an additional 110,000 square leet ol'otlice / industrial support service space Immediately to the east of, tile new Medical / Diagnostic tilcility. luring the construction period the following will I)a) )et1: l)2,000-1 constrilclion related jobs will be created, and these people will use existing retail and service businesses in the al-ea (I(Iring tile 18 month construction billldoll( period; 2) the Roadway intersection al R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing; facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. 11' you support this type of clean growth in your community, please intricate your support by signing below. As it cili--ell hilsirress• olrner in hilrn Beach Gordelis, l o.y% pm to support their regiie. •l bt) volitrg "YIDS" %r coxpmidi ig mve•�• irr Norlhcotp to ineluele the Alledicul Uve.v being rec/rre.s•lel by Ilre pelilioner. Citizen / Business Owner U. 1(e e c e- IJo s;,, ss S �r Please print name Our return lilx // is 471 -1201 Please print name of Business if in Palm Beach Gardens • 0 C� I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I support the idea c f'ne►r jobs and the ne►r grornth this project developer is proposing. A.v a bcrsirress o►rwr in I'alm Beach Gardens, 1 ask you to support their- reque.vt by voting "YES" for exparrdirig rises in Northcorp to include the Medical U.ve.v being requested by the petitioner. BY: L -77 Citizen / sin s Owner Please print name -O&EX 3 7'w." L Please print name of Business if Our return fax # is 471 -1201 in Palm Beach Gardens SUPPORT NEW'JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve_ new, uses of land in - .he -Nor : hCorp. -Cor horate-P ark, which ii' approved, will pave the way for construction ofan 87,500 square Root Medical / Diagnostic lacilit %, :wIllediately south of the Mariott, In addition, ifthe petitioner is successful in Obtaining the new uses requested, he will build an additional 40,000 square feet ofoffice / industrial support service space immediately to the east of the new medical / diagnostic facility. 4: During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail • and service businesses in the area during the 'l8 months construction buil(1out period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent Fulltime jobs to the Patin Beach Gardens Community. This means more potential customers for your business, If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: ! "emu-' Resident • i W5<1 S <1 Man?'tejo,- � •P � Cr/L�n.� 3391 � • • C� J I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL, FOR 200 PERMANENT JOBS IN AREA WIT1-1 APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which i1' approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successli►i in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. / support the icleci of tie►iJobs aiul the ileii! gi-mi,th this project ileveln /)er is 1))-o1)osing. As a husiness ouwei- in l'alm Reach GM-dens, l ask y,oli to sulrpo►•/ their regilesl by ►poling "YAS "" for• expanding rises in Norlhcog) to hichide the Medical l..lres being requested by the petitioner. Our return fax ## is 471 -1 201 BY: i224Z9 Citizen / Business Owner Please print name Please print name of Business if in Palm Beach Gardens • • • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I support the idea of Hein jobs and the nern gro►nth this prgject developer is proposing. As a business otinwer in Palm Beach Gardens, I ask you to sttpport their request by voting "YES" for expartditig, uses itt NorthcotE.) to include the Medical Uses being requested by the petitioner. Our return fax # is 471 -1201 BY: Citizen / Business Owner t lz' ic a/Q7 Please print name Please print name of Business if in Palm Beach Gardens H SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PFAMIANEW1' JOBS IN AREA WIT1 -1 APPROVAL On Thursday night, November 5, 1992, the City Council 01'111C City of Palm Beach Gardens will hold a public hearing to decide WliClller 01. 1101 to approve new uses of land in the NorthCorp Corporals Park, which 11' approved, will pave the way liar construction of an 87,500 square loot Medical / Diagnostic facility immediately south ol' the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 10,000 square feet of oliice /industrial support service space immediately to the east ol'the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000 -1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction bLllldOLll period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fillltime jobs to the Patin Beacl► Gardens community. This means more poter►tial customers for your business. 11' you support this type of clean growth in your. community, please indicilte your support by signing below. I A•uppol•I the itictr a /'1jeli' oh.v coal the ne ►1 gro►r1h Ihi.s• projec.•l developer i.v propo.vijig. Av a ciliZeu uucl -'or tmwer hl Ptilm Ileuch Garden.•, I uvk y m 14) .vupporl their reque.vi by volhig ")"ES" .fin- expcuuliug mve.r in Northeotp to hichule the IVletlicul heh-W reque.vl cl h}, the pelititmer. l3Y:.(Sr e5 = —._ Citizen / Business Owner -Sc-0,9T s /Alorf__ Please print name T . On? - T cAw `� S- 6 P ease print name of Business if 01-11- rehlrn tax 11 is 1171 -1201 in Palm Beach Gardens \/ P. 0 • 1 SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FC)R 200 PER�MANENi JOBS IN ARIA WISH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Hardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for constnrc;tion Of 3n 87,500 S(ILIAre foot Medical / Diagnostic facility immediately sout }1 of the Mariott. in addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of ofTice / industrial support service space immediately to the east of the new coed' +cal / diagnostic kility. During the eon'Ovoction lwdod (lie following lVD1 hpl) pert: 1). 2,000+ construction related jobs will be orcated and these people will use existing retail and service businesses in the area during the 18 months construction buildout period, 2). the Roadway intersection at R.C.A. Blvd. and Alternate Al will be enlarged to relieve congestion; 3), new water and sewer mains will be installed expanding existing facilities in the: Northcorp area, The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Conintunity. This means more potential Customers for Your business. If you support this type o- f- rclean growth in your community please indicate your support by signing below. l.srcpport ttre idea f)f ri(rwjohs, anal the new gt osi,th thi ,� prajeel Llc'vvtol)er is propsrr g, As a huOies.s <»s ner -Iii .NiN Reach Oarclen.v I rick yogi to cul)prarl lheir requeM by voting "YES "for eaJ.7aiultrrq rt.ses it) Alorthcnll) to inchi(ty the fecli c7l ( &e.s being requesle(I by the Petitioner, fi Y.` then I r iness Owner Our return fax number is 471 - 1201. ANCHOR FINANCIAL GROUP, INC. Brandywine Centre T 580 Village Boulevard Suite 150 West Palm Beach, FL 33409 ANCHOR REALTY INVESTMENTS, INC. RICHARD T. SOPHER Licensed Real Estate Broker ISSUED TO: ISSUED BY: REGARDING: DATE: TIME; #PGS: TEL.: (407) 478 -8177 FAX: (407) 647 -9992 .7— If there are any problents or questions concerning this transmittal, please contact Anchor Financial Group, Inc. at (407) 478 -8177. Message: P . 0 1 I SUPPORT NEW .SOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagno7 tic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during, the 18 month construction buiidout period; 2) the • .Roadway intersection at R.C.A, Blvd, and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community, This means more potential customers for your business, tf you support this type of cleans growth in your community, please indicate your support by signing below. I support the idea of'new jabs and the nety growth this project developer is proposing. As u citizen and,�7r business owner in Pccljn Beach Gardens, t cuk yell to support their request by voting; "YES for expanding rises in Northcorp to include the Medical Uses being requested by the petitioner. BY�� K 3-&M `L Citizen / Business Owner Please print name • please print name of Business if Our return fax it is 471 -1201 in Palen Beach Gardena 11/04/1992 16:05 FROM TO 14074711201 F.01 SUPPORT NEW JOBS IN PALM BEACH GARDENS wl"at 42 On Thursday night, November S, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of lend in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott, in addition, if the petitioner is successful in obtaining the new uses requested, he will build in additional 40,000 square feat of office / industrial support service space Immediately to the cast of the new medical / diagnostic facility. During the construction period the following will happen: % 1). 2,000+ construction related jobs will be created and thae people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C. A. Blvd. and Alternate Al A will be enlarged to relieve congestion; 3), new water And sewer mains will be installed expanding existing hcilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your businm. If you support this type of clean growth in your community please indicate your support by signing below. 1 mopport the lien of nov jobs, and the new grmth this project developer is propwing As a hu.slness owner In Palm Bench Gardens 1 ask yon to wpport their reelttest by valitig "YF.S "fir expanding uxvs in Nw-thcorp to include the Medical Uses being requested by the petitimler. BY: • / Business Owner 401 • SUPPORT NEW JOBS IN. PALM BEACH GARDENS ' ()-rE TIAL FOR 200 PCRMANENT JQJ!S IN AREA w11TN APMQVAL On Thursday night, November S, 1942, the City Council of ttve City of Palm Beach t~iArderts will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Ptak, which if Approved, will pave the way for Constniction of an 87,400 ccltiaie iixyl Medical / 0iabnostic 11he'114 imr„edixtety srowh of the Marion. to addition, il'thc petiiioner is successful in Obtaining ilte new uses requested, he will build an additional 40.000 square tee► of office / industrial support service space immediately to the east of the rtew medical / diagnostic fAcility. [luring the construction period the following will llal)pen: i y 2,OOU+ construction related jobs will be created and these people will use existing retail SWid service businesses in the aren during tits 18 montlis construction buildout period; 2). the Rordway intersection at R.C.A. Blvd. and Alternate AiA will be enlarged to relieve congestion; 3), new wAltr and sewer stains will be installed expanding existing facilities in the Nor-thcorp aren, The new Medical / Diagnostic facility will bring over 200 permanent fulitirne jobs to the Balm Beach Gardens Community This means more potential eustorners for your business, If you support this type of clean growth in your community please indicate your support by signing beiovl. I support the idea of new jobs, and the new growth thia project deevelopev Is proposing. An a resident of Palm Beach Gardens I ask you to support their z`oquest by votistig "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitionalr. BY esident • • SUPPORT NEW JOBS INr . PALM BEACH GARDENS TENTIAL FOR 200 P1ERNIANEN'T 300 1N Afl KA WRTN A— PRC -VAL On Thursday night, Noveiitber 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing; to decide whether or not to approve now uses of land in the NorthCorp. Corporate Pi<rk, wiaich if approved, will ptive the way for Construction of An 87.500 square 10oi Medical / Diagnostic SRC;'tlity immediately south of the Mariott. In atidition, if' (tie petitiitiier is successful in obtaining the new rises requested, he will build an additional 40,000 squat'e le.e( of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will haipptil: 1). 2,000+ construction ►elated jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). • the Roadway intersection at R.C.A. Blvd. and Attenuate AtA will be enlarged to relieve congestion; z), new water and sewer mains will be installed expanding existing Ncilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 }permanent rulltiine jobs to the Balm Bench Gardens Community. This +rieans more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth thi.ft project developer In proposing. Ash a resident of palm Beach Gardens I ask you to oupport the3,r'r eat by voting "YES" for expanding uses In Northcorp t9. -�nc cie t��,,; al Uses being requested by the petitioner," /'' BY 0 nt I • SUPPORT NEW JOBS IN • • PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I support the idea of tie w jobs and the neiv growth this project developer• is proposing. As a citizen and /or business ovi ner in Palm Beach Gardens, I ask you to support their request by voting "YES" for expanding uses in Northcotp to include the Medical Uses being requested by the petitioner. Our return fax # is 471 -1201 BY: o arW Citize / Business ner Sri J, S !S,le..,, Please print name Please print name of Business if in Palm Beach Gardens I SUPPORT • NEW JOBS IN PALM BEACH GARDENS POTENTIAL 1012 200 PERMANENT ,10135 IN AREA WITH APPROVAL On 'Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to Approve new uses of land in the NordiCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square loci Medical / Diagnostic facility immediately south of tl►e 1Vlarriott. In addition, if the petitioner is successful in obtaining the new uses re(Iuested, he will build fill additional 10,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. Du1-ing thC coils tI'lll'(ion 1)CC10(1 the following will happen: 1) 2,000 -1- construction related jobs will be created, and these people will use existing retail Mid service businesses in the area during the 18 111011th c0nstn►ction bllild01It period; 2) the • Roadway interseclion al R.C.A. Blvd. and Alternate A l A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to [lie Palm Beach Gardens community. This means more potential customers for your business. It' you support this type of clean growth in your• community, please indicate your support by signing below. I .suppoiy /he h1cel a /,iie►ijobs u/m/ the //ell/ l—olr /h 111i.s. pIpjec l (le velopel. ishropo.s•ilig. Av it c.•ili--m mul%On• busiirrss ouviel- iii 1'alrn Beach C;ardeny, I u.s•Ir you In avipporT Their reque.sl by voling expaiidilT n.ves in Nol'lhcolp 1) include The A/edicul IJ, ;e.v beirli,J reque.vied by The pelilionci•. BY: r Citizen / Business Owner el CL.X z g � -- r Please print name • Please print name of Business 11' Our return faX i/ is -171 -1201 in Palm Beach Gardens I • SUPPORT NEW JOBS IN PALM BEACH GARDENS TCNTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthC.orp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction bLllldOUt period, 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. • The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. l .wrpporl l/re iclecr o /'��c►i Jc�b.� cn�c/ /hc i�cFN /;Jror► /h Ibis projt�cl devc/opc -i is prc���o.�iil�l. AV a cilizetr am/, or hu.vine.v.v o►vner irr Palm Beach Garclens, I ask you to .vrrhhor•l !heir request by voling "YL',S "' /or exl)atiditrg rases in Nor/hcotp to inclncle /he Alleilical Uses• heing reque.vlecl by the /)eliGoner. Our return fax It is 471 -1201 BY: Citizen / Business Owner TH Please print name Please print name of Business it' in Palm Beach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTFA I'IAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate park, which if approved, will pave the way for construction of an 87,500 square loot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000-1- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction bllildout period; 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion, and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. 40 The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Patin Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 srtppot-i the itic,ca o/'we►r, jobs alit! the lie rr, gro►rlh This projecl developer i.v propo.vilig. As a citizen ontl'or• lm.viwe.s.v ou wer iii Palm Beach Gm-ilens, I a.vk you to suppor! their reque.vt by voliwg "YA'S" fir expawdiwg use.v in Nor•thcotp to iwchrde the tlletical U.ve.v tieing reques7ed by the peUtiower. BY: Dd& Citizen / Business Owner Our return fax # is 471-1201 S/ r'drl V i 11 C Please print name Please print name of Business if in Palm Beach Gardens 0 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPRQVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial Support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) Z,UVU+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 support the idea of trees. joh.v and the new growth this pre jeer developer is proposittg. As a citizen and /or business owner in Palm Heach Gardens, 1 ask ycm to support their request by voting "YF „ti” lbr expanding uses h7 Northeorp to include the Medical Uses being requested by the petitioner. C tizen I 4siness Owner Our return fax # is 471 -1201 �-r _ N. u a I ru Please p A t name Please print name of Business if in Palm Bcach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square Im Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of ofTice / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the .I8 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of _clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: QQ_1✓l �(/J,P _V 1 G /la Resident I SUPPORT NEW JOBS ELI PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: - �- 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during (lie 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion, 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulitime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: Re ent 0 I SUPPORT NEW JOBS R PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the- NorthCorp- Corporate Park, which if approved, will pave the way for construction of an 87,500 square root Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate -your- support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: Resident 0 2 S- 9 �- (5�) �- • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL. On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. , During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail ' and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed. expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. l miplwn lire idea e 'nety jobs, and the neiv g►•vtirlh this p►•ojeci de,•vrfoper is proposing A.r a bu.0iesv owner in Palm Bench Gardens ! ask yon to .sir rt t/re request by voting "YI:'S" for expanding uses hi Northeorp to in • a the edica U.r . • being requested by the petitioner. (Re � �v � � itize Business Owner. E�+ c f� (;�7 � rr/5,,�1 �!°U G/f a� • I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT .LOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an $7,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 rquare feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000+- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the .Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 support the idea of new john and the new growth this project developer is proposing. As a citizen and /or business cnvner in Palm Reach (.gardens, 1 ask you to support their request by voting "YA'S" for erp[rndin{; 11ses in Northeorp 11) n)rh /de the Mediral 11si m being requested by the petitioner. BY: Aitizen / usiness Owner G Ple a pk iA name ok bc- SeMyr, hA Please nr~nt name of Riicinle� if Our return fax # is 471 -1201 in Palm Beach Gardens hJ Ct — 5 — 'a T t-1 1_I 1 « -- 0 Y F' R Ce S F' E F; I T 'r' L R E D G I " SU PP 1 RT NEW 40135 PALM 13EACA GARDENS , P- ME,'dTIAL FUR 200 PE F' _ Li _ On Thm'sday night, November 5, 1992, the City Council of the City of Palm Beach Gardens wilt hold a public hcarin$ to decide m hethcr or not to approve [low uses of land in the Noill)Corl> Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility inime- diately south of the Marriott, In addition, if the petitioner is successful in obtaining the new u5cs re- quosted, he will build . an additional 40,000 square feet of office / indt strial support service space Immediately to the east of the new Medical / Diagnostic 6614 5. During the construction period the fol owing N011 happen: • 1) 2,000+ construction related jobs will be crew ed, and these pee >ple will use existing retail and service businesses in the area during the 18 month construction buildout period; 2) the Roadway intersection at R.C,A, Blvd. And lternate AlA will be enlarged to relieve conges(ion; and 3) new water and sewer n sins will be installed expanding existing facilities in the NorihCorp area. The new Medical / Diagnostic facility will brig ovee 200 permanent fulltime jobs to the Palm Beach Gardens community. This means pure potential eustomcrs for your business, If you support this type f clean growth in your comir><>tutl<ity, please indicate yo l• support l)y sighing below. ! sul}port the Idety of 1 eip, joAv a11cl the neir g1 -0 vilh th A.+' a citizen aml.lnr bnsiiie.vs Sn�we;- N Ptih 1 Bupc11 C;ctrdejls, l ask you fry stll)pnrt their r•ceque.til by voting e.vj)miding uses [t No1-thcp to Inch0e IN A eclicol (Ices being r•eque.sted by the pelitloner, r1 Our return fax 11 is 471 -1201 BY: A `—ti 7.en / 56 1ness wnez P ease print name rase print n��n7e of f3usi►tieSS tf n Palm Beach 0ardc.ns r I SUPPORT NEW JOBS M PALM BEACH GARDENS POTItATIAL. FOR 200 PERIVIANEAT .10115 IN AREA WIT'I11 AI'I'ROVAL On I'hursday night, November 5, 1992, the City Council of the City of Palm t3each Gardens will hold it public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way lbr construction ol'an 97,500 square Im Medical / Diagnostic ti►cility immediately south ofthe Marriotl. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 10,000 square feet of ollice / industrial support service space immediately to the east ol'the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000-1- C01IS11"L►ChO ►1 Related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction bulldOL►( period; 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing hacilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltinle jobs to the Palm Beach Gardens community. This means more potential customers for your business. It' you support this type , of cle"In growth in your community, please indicate your support by signing below. l .wipporl the ids cr o/ /cli' juts caul /he neiv gro►rlh /hi.pIpjecl developer is proposilig. As cr cilize)i crud -'or hn.rincss ou'ller ill M11111 liccrch Cane n.v, l crsk you /o /heir request ht) volin�r "1'l:',� ", /��r r.�pailding rr.�•es in Nvr/hcorp to include /he Medical Uses being rer/nesled hY the pelilioner•. Our return tilx // is 2171 -1201 BKU?itiz- 0 9 _ Please print name 14 IP' 440/-/- 1�XA96�1�f-' 7, lease print name of Business it' III Palm Beach Gardens 11 SUPPORT NEW JOBS Ila PALM BEACH GARDENS 110TU, TIAL FOR 200 I'GRNVIANENT .1O13S IN ARIA WITI1 AI'14ROVAL, On 'Thursday night, November 5, 1992, the City Council of the City of Palm !leach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way Ii►r construction 01' an 87,500 square fimt Medical / Diagnos(ic fiacility immediately south of the Marriott. In addition, 11'111C petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet ol'oflice / industrial support service space immediately to the east of the new Medical / Diagnostic facility. (hiring the construction period the following will happen: 1) 2,000 -1- construction related jobs will be created, and these people will use existing retail and service businesses in the al-Ca duffing the 18 month construction buildOUt period; 2) the Roadway intersection al R.C.A. Blvd. and Alternate AIA will be enlarged to relieve • congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic litcility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. 11' you sIll)pol.t this type of clean growth in your community, please indicate your support by signing below. 1.vnpporl lhe it let r a /*neiv job.,• iuic/ Ilre /lei v luI-/h lhi.v p njec./ Ile I'eloper i.s. propo.vilig. A.S. o ciliZ it mul,"or birs-hie.v.v o►ri►cr ill 1'erlm Beach Gorde.•ii.v, 1 ad you to m pporl divir reglle.vl by volilig expeiniliirg mve.v ill Norlllcolp to inelude the Alledival I.lve.v being reque.vled by the pe lilioller. Citzerr / Busi ss 0*4+e+- Please print name — -- IV (?jcfq1z:T� • Please print name of Business it' Our return tax 1i is 471 -1201 in Palm Beach Gardens • 0 0 —11/04/1992 16:05 FROM TO 14074711201 P.01 ri SUPPORT NEW JOBS IN PALM BEACH GARDENS 's il twiliq J 3 ja:► ► is ►.: , Mltf M J : On Thursday night, November 5. 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the Northt:orp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marion. In addition, if the petitioner is successful in obtaining the new uses requested, he will build in additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1), 2,000+ Construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). tht Roadway intersection at R.C.A. Blvd. and Altcrnate Al A will be enlarged to relieve congestion; 3), new water and sewer mains will be installed expanding existing Wilities In the Northcorp area. The new Medical / Diagnostic fhcility will bring over 200 permanent fiolltime jobs to the Palm Beach Gardens Community. This means more potential customers for your busine", If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of nest/ john, and the new grrnvth this project develalvr Is proposing. As a husloless owner Ire Palm Brach Gardners 1 ask yon to support direly request by vbling "YES" for expanding rr.crs in Noj thcarp to Include the Medical Users being requested by the petidwi rr. BY: �/ Business Owner FROM • • °. 3.1 987 3:43 I SUPPORT NEW JOBS IN PALM BEACH GARDENS I'Q NUAi1, FOR 200 PCRI ANENT JCl►BS rN AREA 1` U 11 APPROVAL On Thursday night, November 5, 1992, (lie City Council of the City of Palm Beach Gardens will hold A public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if Approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marion, In addition, if the petitioner is SUCCeS91111 in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the eAst of the new medical / diagnostic facility, Turing the construction period the following will hal)pen: 1). 2,0004• construction relAted jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A 1 A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. l sqt porl the Idea of neia fohs, rarellhe new grvtrth thisl7trJect de►rvfigher l.s pr 7ofing. As a brtsine.ts ovvner In Palm Beach (J'Orden.v 1 osk You to alilgwt -1 fhel by voting "YES " ,fir exl)anding rrsvx in Northcvt/) to include„ the Me 11 'al f lsring rec tte.sted by the pe itionet•. )/7 • Citizen 1 P. 7 11 -OS -92 13:26 SS 1SOE, MICHERL SaCHH iR?7 i ID SUPPORT NEW JOBS IN PALM BEACH GARDENS =6b P03 r(),rENTIAL FOR 200 PERMANENT _JQ_W 1N AR A WJ,1" ,,%PPRQVAL On Thursday night, NovemUcr 5, 1992, the City Council of the City of Paim Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NortliCorp. Corporate Park, which if approvod, well pave the way for construction of Pit) $7,500 squaie l of Medical J Diagnostic facility ininiedialely south of the Mariutt In Addition, i1'thc petilioller is successful M obtaining the new uses requesded, tie will build an additional 40,000 square Im of office t industrial support service space immediately to the east of the new rtiedicttl ! dingnostic facility. During the construction 1wriod the following will happen: 1) 1,000+ construmon ieiated jobs will be Created and these people will use existing ret:::' anti service Businesses in the are, disring lite 1$ montlis construction buildout period. the Roadway intersectioti at R.C.A Blvd, And Alternate AIA will be enlarged to relieve congestim, 3). new water, and sewer retains will be installed expanding exisiing facilities in the Nonhcorp area. The new Medical! Diaenostic lacility will bring over 200 pertvrinent fullurpe ,lob,, ro tiq� Palrn Beach Giudens Conwiunity This quchns more potential customers fo your buiiness If you support this type of cltlin growth in your community please indicate your support by signing below, I support the idea of new jabs, and the new grvwtli thifi project developer is proposing. An a residerit of Palm ReeCh Gardenia I ask you to support their i~equeat by voting "YES" for expanding uses in Northcorp to includes the Medical Us** being requested by the petitioner. —r I-~ By: 0 SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPRQVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,()110 Square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,00V+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AI A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I support the idea of ne w joh.s cruel the new growth this project developer i.s proposing. As a citizen and,,6r business owner in Palm Heach Gardenns, I czck ycrr, to support their request by voting "YF.S" fur expanding ruses in Northeorp to include the Medical Uses being requested by the petitioner. BY-. (&Oa-64,_TArm a o Citizen / Business Owner �3F�E�L 4 K} r� Please print Arne Please print name of Business if Our return fax # is 471 -1201 in Palm Beach Gardens HOV 05 '92 11:48 TRAIHOR � LA_� C.0 FLL''} L U M O I SUPPORT NEW JOBS SIN PALS: BEACH GARDENS P a CF. "t37-E."tr1� i L, FQ 3000 PER1 I ',1 � t�..4RF����'_I 1 ial� )�i�V,& On Thursdrty night, November S, l4�iy> the City Couricil of the City of Palm Beach Gardens will hold a pubk, hearing to decide whether or trot to approve new uses of land in the NorthCorp Corporate Park,, which if appr J,ed, will pave the way for construction of IV, 97,Sr.10 square Font Medical / Diagnostic facility immediately south of the Marriott Jr, addition, if the rietitioticr in, st,Lcewsfttl in obtaining the nc +v uses req,ioszed, he will built! Fart additirn:tl 40,0,00 square feet of office 1 ittdustIlal su ;.)port service, space irm,nediatel} to the cast of the new Media) / Diagnostic: facility. During the construction period the follosving will happen: 1) 2,000+ construction related jobs %\, :ll be created, and these peopie: will use ex:,ing retai: and service businesses its the area during the 1$ month. con >truetion buildout period, t) ti'i • Rwdwayj Intersection at R C.A. 'Blvd and Altermoe AI A «'ill be enlarged to reliev" congestion, and 3) ne,.v water and Server train; will Sir, installed expandins exisi Oli facilities in the Not-thCorp area T "he new RMedicml / Diagnostic fociiity will brim, over .200 per•maru,ym jobs to thL F':}ltrt Beach 0 ;miens comm'.trzity. This means more 1>otarytial customers for your busi,%eg5 If you support this type of clean gro with Fn ylouit community, please indicate your support b, ,., signing below, i SJIf)�s:il't 7itt' /t/C�tt L!f »E�ti.. /ci,.�.s It ?rc / cllt� ?k't�' (�*i(',`�t'!r1 !dl/,S'��j'r?I�'.'? CAE' :•P�'G;;'E" it �7f;7�'( }y;lt�� :1 t7 G' % /izdJi tt)JGl`'oJ' liti.tltrf'.t4 owner m 1'eJJJn Re'oCtl (,1r7Yiri' ?1 t', 1 ask yotr to .Stfjit)t : %!'l Jne!" rb'4]mm b , voling "Y S" for expa rfln't? uses .'i't MortiTc0q) to MC114,. the V.-- requested by IN pellilwer. BY: _-- - --�-- -- �'ihren I3USrnte,99 0 vv ti2� vii ) hJ ��_ _ r2 + 1 ru' (1 .1 Please print name G ✓+ t !�_'T PIFa�e prim namF of ;f Our return &x # is 47(1.120 1 in Faun Vk�ich Oa,-dens 0 I SUPPORT NEW JOBS fN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square !loot Medical / Diagnostic facility immediately-south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate Al will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate y_our_s_upport by.signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner ./i BY siaen • I SUPPORT NEW JOBS 10 PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the Northcorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • l). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: Resident • • n 1�J ri SUPPORT NEW JOBS QT1 PALM 13EAC GARDENS P4TENT1A1 FOR tot) Pct RMAN'ENT J , rN AREA WITH A,PPRQYAL On Thursday night, November S, 1992, fife City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorihCorp. Corporate Park, which if approved, will pave the way for construction ofan 87,500 square foot Medical / Diagnostic facility immediately south of the Marion, In addition, if the petitioner is successflrl in obtaining the new uses requested, he will build an Additional 40,000 square feet of office / industrial support service space Immediately to the east of the now medical / diagnostic facility. During the construction period the following will happen: 1), 2,000', construction related jobs will be created And these people will use existing retail and service businesses in the area during the 18 months construction buildout period, 2), the Roadway intersection at R.C.A, Blvd, and Alternate AiA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Notllicorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Oardens Community, This means more potential customers for your business, If you support this type of clean gro`i,th In your community please indicate your support by signing below. / - wel)lpnP1 the lefe a of nem, joh,c, and the new growth this l7rnfecl c1c> v1g1)er 4 pi-ol�mIng. As a bitslness owimi, 1il 11xbo Beech Gardens I a.rk you to sulywrl 11telt, requev by voling "YES" for eal)andhig risks, in North oq) to inchrcle the Medical f /ve.s- being reelneved by the petitioner. i / Business Owner 10V- 5 -92 THU 17:13 P. 02 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 ]VER1V1ANFAT .10135 IN A111'4:A WITH AIVROVA On Thursday night, November 5, 1992, the City Council 01' the City 01' Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which 11' approved, will pave the way liar cowaruction ol'an 87,500 square loot Medical / Diagnostic tacilily immediately south ol,the Marriott. In addition, iflthe petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square fleet of ollice / industrial support service space immediately to ti►e east ol'the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000 -1- construction related jobs will be created, and these people will use existing retail Mid service businesses in the area during the 18 month construction I)MIC1 xit period-, 2) the Roadway intersection at R.C.A. Blvd. and Alternate A t A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing tacilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Patin Beach Gardens community. This means more potential customers for your business. It' you support this type of clean growth in your• community, please indicate your support by signing below. l supporl the idea of tic►i, As• irncl Me lie ►a g•o►rlh llli.v projrcl developer i.v propo.ving. As it cili-zeti oml'or bu.vilin -,v owner ill holm Beoch Gard ein, l om•lt yon to .Yupporl 111eir reque.vl by voling "YES" fin- experndillg rr.u.v in Norlhemp to include the Alle dicul Uve.v being reque.sled by the pelilioner•. BY: r�-06F Citizen / Business Owner. Please print name 1 lease print name oi' Business rfl Our return fax // is 471 -1201 in Palm Beach Gardens • U 0 n SUPPORT NEW JOBS IN PALM BEACH][ GARDENS POTENTIAL F'OR 200 I'LlZMANENT JOBS IN ARh:A WITH APPROVAL On "Thursday night, November 5, 1992, the City Council of the City ol' Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land III the NorthCorp Corporate Part:, which if approved, will pave the way lot' construclion ol' an 87,500 square loot Medical / Diagnostic facility iilunediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet oil ' 'office / industrial support service space immediately to the east of' tile new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,000-1- construction related jobs will be created, and these people will use existing retail and service businesses in the al-ea during the 18 month construction bllll(1o(It period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; and 3) new water and sewer plains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring; over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. 11' you .4,11p port this type of clean growth in your community, please indicate your support by signing below. I snpporl the it let r ofrrr►ijohs 1linI the lie ►i- grorrllh this ppjecl ilev loper is proposilig. As ti ciliZen nrid"or bilsirress• mover ill Milm Geoch G(rrdelis•, J ask you to supporl their request /))) volirrg exp(rrrt1hig uses in Northeorp to hichide the Alledictrl Uw.y behi r requ sled by Me peliliornrr. Our return fax // is 471 -1201 BY: Citizen / 11 usiness Owner 01 0'r Af Please print name Please print name of Business it in Palm Beach Gardens I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square font Medical / Diagnostic. facility imrediately -south of t1:e Mariott. In- addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing - below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm.Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. ., BY:q 1P Resident I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic lacility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail �I and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. IL: you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: � ' Resident 0 • I SUPPORT NEW JOBS �I PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park; - which -if approved, will pave the way -for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, fie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will .use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate- -you -i• support-by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. BY: Resident U SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL, FOR 200 PERMANENT JOBS IN AREA WITH APPRQVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,UUU+ construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction buildout period, 2) the • Roadway intersection at R.C.A. Blvd. and Alternate AlA will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. 1 s-upporl the idea of new jobs ctnd the new growth this project developer is proposing. As a citizen and br husit►ess owner in 11ntm 13eac'h Gardens, 1 ask yml to support their request by voring " f'F.,ti" for expanding uses in Northeorp to inchule the Medical Uses heing requested by the l7etitiorter. BY. Citizen'/ d6sYness Owner ` = uo a Please print name Please print name of Business if Our return fax # is 47 1 -1201 in Palm Beach Gardens • F1 SUPPORT NEW JOBS IM PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Marriott. In addition, if the petitioner is successfill in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new Medical / Diagnostic facility. During the construction period the following will happen: 1) 2,0001- construction related jobs will be created, and these people will use existing retail and service businesses in the area during the 18 month construction bl111dOUt period, 2) the Roadway intersection at R.C.A. Blvd. and Alternate A1A will be enlarged to relieve congestion; and 3) new water and sewer mains will be installed expanding existing facilities in the NorthCorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens community. This means more potential customers for your business. If you support this type of clean growth in your community, please indicate your support by signing below. I .wrppol•l the idea of'ne a jobs crncl the ne►v gro►i,lh ihi.v projeel cleve lopes• I.v propo.ving. As a eilizen ont[oi• busine.vs o►Iwer in Pa /in Beach Gw-clen.v, 1 crslc you to .vnpporl /heir requesl by voling "Y1,,S" for experncling n.ve.v in Norlhcoip to inehrcle the Alleclical U.ves heing regquemec -1 by the pelilionei-. Our return fax # is 471 -1201 BY: A e .6 S 4,* Citizen / Business Owner Please print name Please print name of Business it' in Palm Beach Gardens FR0t4 .W • 9. 3.1987 3:34 F. c SUPPORT PPORT NEW JOBS R PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WffI{�APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold A puhiic hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if Approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott• In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space Immediately to the east of the new medical / diagnostic facility, • luring the construction period the following will hAhpen: l), 2,0004' construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2), the Roadway intersection at R.C.A• Blvd, And Alternate AIA will be enlarged to relieve congestion; 3), new water and sewer mains will be installed expanding existing Acilities in the Norilicorp arcs. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community, This means more potential customers for your business, If you support this type of clean growth in your community please indicate your support by signing below. I - vq)port the Idea gfnew phs, and the new grrow(b (hispioJecv tlevelgl�er is prol)ost1rg, its a busl►tess owner hi Paint Beach I axk you to tinlywt,l thelr' regrrev by voling "YF,S "for• expctrtding uses in Northcor/) to lnelrrcle the Aledtcal L1.ws being requested by the petitioner'. BY: __ . .itize n n 1 Business 04_._. FROM a is • ,..r` 9. z 19 ,7 3:42 I 1. UppoT?-T NEW 3013 IN PALI'1!r BEAC14 GARDENS additional 40,Op0 square feet of office / indusiflaf support service spade ininrediately to the cast of the new medical / diagnostic facility, During the construction period the following will happen: 1). 2,000+ construction related jobs will be Created and these people will use existing retail and service businesses in the area daring the 18 months constniction buildout period; 2), the Roadway intersection itt R.C,A, Blvd, and Alternate Al A will be enlarged to relieve Congestion; 3). new water and sewer mains will be installed expanding existing facilities in the N'orthcorp area. The new Medical I Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community, This means more puterntial customers for your business. If you support this type of clean growth in your community please indicate your support by sd ndng below, I support the idea of now jobs, and the t�sw. growth thJe project developer is proposing. As a resident o2 Palm BeaCh Gardena I ask you to support their raqu�et by voting "YES" ko�r expending uses in Northcorp to include the Medical Uses beinj requested by the petitioner. _ - 8y i t( G� 'Resident F. 6 0 I SUPPORT NEW JOBS I_ PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the Northcorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate A I A will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. 11 The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petit- -orcer . —,, f1 • • ri SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November S, 1992, the City Council of the City of Palm Beach Gardens will Bold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical -/ Diagnostic facility- lnin- tedlately south of the- Marlott. In addition, if the petitioner is successful in obtaining the new uses requested, lie will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. I support the i d project developer Gardens I ask you expanding uses in requested by the ea of new jobs, and the new growth this is proposing. As a resident of Palm Beach to support their request by voting "YES" for Northcorp to include the Medical Uses being petitioner: - ---- - /> BY T SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JQQS r1V AREA WI'1`ff PP RC1VAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction of an 87,500 square foot Medical / Diagnostic facility immediately south of the Mariott, in addition, if the petitioner is successfid in obtaining the now uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the eAst ofthe new ntedical / diagnostic facility. During the construction period the following will halfpen: • l). 2,000- construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3), new water and sewer mains will be installed expanding existing facilities in the Na7hcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This means more potential customers for your business. If you support this type of clean growth in your community please indicate your support by signing below. ! srehpnrt the idea of new jobs•, and the neu, grot►,1h 1hispr(�evt develolmr is pioposIng. As a buVne.ss o►ancr in I alrn Beach Gm -dens l ask yore to su11wr1 1heir requev by voting "YRS "fir exl)anding eeses in Noy ffi oil) to include flit). Uedical Vves being requemed by the Petitioner. BY: _ itize / 8usi»ess Owner - i 10V- 5 -92 THU 17:15 P.04 I SUPPORT NEW JOBS IN PALM BEACH GARDENS POTENTIAL FOR 200 PERMANENT JOBS IN AREA WITH APPROVAL On Thursday night, November 5, 1992, the City Council of the City of Palm Beach Gardens will hold a public hearing to decide whether or not to approve new uses of land in the NorthCorp. Corporate Park, which if approved, will pave the way for construction _ of an 57,500"siluaY foot Medical f Diagnostic facility immediately south of the Mariott. In addition, if the petitioner is successful in obtaining the new uses requested, he will build an additional 40,000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will happen: • 1). 2,000+ construction related jobs will be created and these people will use existing retail and service businesses in the area during the 18 months construction buildout period; 2). the Roadway intersection at R.C.A. Blvd. and Alternate AIA will be enlarged to relieve congestion; 3). new water and sewer mains will be installed expanding existing facilities in the Northcorp area. The new Medical / Diagnostic facility will bring over 200 permanent fulltime jobs to the Palm Beach Gardens Community. This rneans more potential customers for your business. If you support this type of clean growth in your community please indicateyouur support by signing below. I support the idea of new. jobs, and the new growth this project developer is proposing. As a resident of Palm Beach Gardens I ask you to support their request by voting "YES" for expanding uses in Northcorp to include the Medical Uses being requested by the petitioner. .- • GHSTROENTEROLOGY GROUT' TEL 14UV-177 . 7G 1 NU 11 : eu 1 L 1't-11 - -aCK"CI'N'LV 1 CL 'd0 1 =; ._{- i ;,Iii 1111 F ICL raJ: Y�f-- O„7L'� -Q�i7L rl!r,L:lVC Hb (YJ I-•1JG - - --- -- I SUPPORT NEW JOBS IN PALM BEACH GARDENS MEN,rIAL FOR 200 Pr,,RMANENT JOBS IN AREA WILT" APPROVAL On Thursday night. November S, 1992, the City Council of the City of Palm Beach Gardens will hold a public bearing to decide whether or not to approve new uses of land iu the NorthCorp. Corporate Park, whioh if approved. will pave the way for construction of an 87,500 square font Medical / Diagnostic facility immediately south of the Mnriott. in addition. if the petitioner is successrul in (.obtaining the new uses requested, he will build an additional 40.000 square feet of office / industrial support service space immediately to the east of the new medical / diagnostic facility. During the construction period the following will hrtpperr 0-2,0004- construction related jobs will be created and these people will use existin retail the Roadway intersection at R.C.A. Blvd. and Alternate A1A will ba enlarged to relieve congestion; 3)• new water and sewer mains will be installed expanding existing facilities in the Northcorp area, 7 -he new Medical / Diagnostic i4llhy will bring over 200 pennanerit fulitilne jobs to the Palm Renck Gardens Community. This means more potential customers for your business. If you support this type or clean growth in your community please indicate your support by signing below. I support the idea of new jobs, and the new growth this project developer is proposing. he a resident of Palm Beach Gardens I ask you to support their request by voting "Y9611 for expending uses in Northcorp to include the Medical Wee being requested by the petitioner. BY: VW Rd$ dente � CITY COUNCIL REGULAR MEETING, 11 /5/92 PAGE 2 b,fS The City Manager stated Council needed to determine the provider for EMS services for the immediate future. The City Manager stated Council had been provided with 4 options. Councilwoman Monroe felt a major workshop was needed with all parties attending to disseminate the information before making a final decision. Vice Mayor Russo stated he agreed with Councilwoman Monroe, however, felt a decision for the immediate future needed to be made so North County would have some idea as to the term of their commitment. Councilman Jablin stated he was in agreement with vice Mayor Russo, and felt the final decision should be tabled for further discussion. Councilman Jablin felt more input from the public was needed and expressed interest in forming a task force empowered to hold public information hearings to get the public's feelings. Mayor Martino stated his feelings were much the same as they were at the last discussion. Mayor Martino stated he felt the City needed to extend the contact for North County for a period of time from 6 months to 1 year and at the same time, take all suggestions made, arrive at a consensus and proceed. Mayor Martino stated, if a public agency was to be used, he was interested in thoroughly exploring bringing EMS in- house. Mayor Martino stated he will schedule a workshop as soon as possible to thoroughly evaluate all proposals. CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 3 After further discussion, Vice Mayor Russo made a motion extending the existing agreement with North County Ambulance Service to provide the City with ambulance service up through April 1, 1993, seconded by Councilwoman Monroe. The motion was unanimously approved by the City Council. PROSPERITY CENTRE = The City Manager stated the Prosperity Centre site was before the Council because additional right -of -way needed to be obtained for the enlargement of the intersection of PGA Boulevard and Prosperity Farms Road. The City Manager stated staff had plans that would provide the right -of -way by moving the landscaping to the south and rearranging a few of the parking spaces and making a few other modifications listed in the staff report. Rich Walton, Director of Planning and Zoning, addressed the City Council and stated the recently approved Prosperity Centre PUD is located on the southeast corner of PGA Boulevard and Prosperity Farms Road. Mr. Walton stated a condition requiring the interesection to be expanded was included in the Regional Center DRI. Mr. Walton stated the need to enlarge the intersection would take some property from the shopping center. Mr. Walton stated the shopping center owners had revised the site plan to give the required right -of -way to the City. Mr. Walton stated the owners had also requested some minor revisions, i.e., reducing square footage in the main building and increasing the square -- footage in the out - parcel building. CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 4 Councilwoman Monroe made a motion instructing staff to prepare a Resolution for the Consent Agenda for the 11/19/92 City Council Regular Meeting, encompassing the staff report; seconded by Vice Mayor Russo. The motion was unanimously approved by the City Council. s- [:Xaowe- Weia"8� MAYOR MARTINO Mayor Martino reported attending a workshop meeting held at the County Commission Chambers re: Jog Road Thoroughfare. Mayor Martino stated since it was a workshop, no decision was rendered. Mayor Martino reported Vice Mayor Russo and Councilman Jablin were also in attendance at the workshop. Mayor Martino stated the City's goals and objectives concerning this issue were outlined and placed in the record, the City's willingness to cooperate to recognize the policy goal and do whatever will be necessary to remove Jog Road from the Thoroughfare System and the County's Comprehensive Land Use Plan. Mayor Martino stated there were two consensus directions given by the County to it's staff: 1)any alternate routes through the eastern section of the City of Palm Beach Gardens, between Military Trail and the Florida Turnpike, were dismissed as impractical and no further interest of pursuit by the County Commission, and, 2) to complete it's traffic studies and analysis to realize the removal of Jog Road as a link through PGA National. Mayor Martino stated he is requesting the Council to �-% consider adopting the attached proposed resolution to CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 5 emphasize the City's continuing promise to the residents to resolve this issue. Councilwoman Monroe expressed concern the proposed resolution would only protect residents west of Military Trail. Councilwoman Monroe felt residents just east of Military Trail would be greatly impacted by this decision. In response to Councilwoman Monroe, Mayor Martino stated the resolution was consistent with the policies adopted thus far, and after attending the workshop meeting, felt a resolution such as this should be adopted to put into the hands of the Commissioners and staff and have a statement for the LPA meeting. Vice Mayor Russo felt the Resolution was great and was `f needed at the County, however, some modifications could be made. In response to Councilman Jablin, Rich Walton stated he had spoke with Randy Whitfield today and they were still having problems with lost data. They had recreated some data and hoped to be finished by the end of next week. Councilman Jablin felt the Resolution went another step to show the County the City's cooperation and felt the Council should consider approving it. Vice Mayor Russo made a motion to adopt Resolution 103, 1992, supporting the removal of the Jog Road Thoroughfare link from the Palm Beach County Thoroughfare System and Right -o -Way Protection Map and from it's Comprehensive Plan, CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE -..- from Northlake Boulevard to Donald Ross Road, in any location in our City east of the C -18 Canal; seconded by Councilman Jablin. Councilwoman Monroe stated a yes or no vote would not say what she wanted to say. Councilwoman Monroe stated she would have voted for the Resolution if it had stated "east of the Turnpike ". She is concerned the residents east of R Military Trail are going to be in trouble in the near future and did not want to see them left out in favor of a more affluent community. Councilman Jablin stated he was also concerned about Military Trail and shared Councilwoman Monroe's concerns. Councilwoman Monroe stated she would not vote for the Resolution. After further discussion, Councilwoman Monroe made a substitute motion to amend Resolution 103, 1992, by deleting Section 1 and Section 2 and renumbering Section 3 and Section 4, accordingly; seconded by Vice Mayor Russo. The motion was unanimously approved by the City Council. VICE MAYOR RUSSO Vice Mayor Russo recommended forming a Charter Study Commission to look at the City Charter and recommend changes to update the Charter. In response to Vice Mayor Russo, Mayor Martino stated this will be put on the pending list for workshop. COMMENTS FROM THE PUBLIC ,.�lliam Myers William Myers, 1022 Shady Lakes Circle, addressed the City CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 7 �- Council and expressed his appreciation of the removal of Comp Plan Amendment 191 -2. Sam Carsillo Sam Carsillo, 10063 Dahlia Avenue, addressed the City Council re: acquiring the MacArthur building for the police department, FBI crime lab school in Washington, D.C., the City purchasing the property located behind the Klock building, a Palm Beach Gardens library, Comprehensive Plan for bike paths, K -9 units, lack of street lights, districting and strong mayor, and 1 lane on Holly Drive. Mr. Carsillo requested a debate between the candidates before the December 1st Special Election. Milton Stern MD Dr. Milton Stern, 24 Cayman Place, addressed the City Council stating he felt the solution to the Jog Road issue was to address densities and not have an alternate to Jog Road and felt Resolution 103, 1992 was not strong enough. CONSENT AGENDA Vice Mayor Russo made a motion, seconded by Councilwoman Monroe, to approve the following items listed under the Consent Agenda: 1. Approval of Minutes of Regular Meeting, 10/15/92. 2. Approval of Minutes of Special Meeting, 10/22/92. 3. Proclaiming November 22 -29, 1992 as "National Bible Week". The motion was unanimously approved by the City Council. PUBLIC HEARINGS RESOLUTION 89, 1992 Mayor Martino stated the Public Hearing for Resolution 89, 1992, Amendment to Development Order for PGA National Resort Community, DRI, requiring conveyance of r -o -w to Palm Beach CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 8 County for use as a public thoroughfare; reduce density; and requiring a revised master plan within one year, was advertised on 9/30/92 and recessed from the Regular Meeting of 10/15/92. Mayor Martino reconvened the Public Hearing. Rich Walton, Director of Planning and Zoning, addressed the City Council stating the Petitioner is requesting Resolution 89, 1992, be continued until the next City Council Regular Meeting. Mr. Walton stated the property owner had submitted a traffic report within the last two days and staff was in the process of reviewing that information. Sally Black, representing Treasure Coast Regional Planning Council, addressed the City Council stating Treasure Coast would preserve their right to appeal the amendment to the development order which may be approved for the DRI. Councilwoman Monroe made a motion to recess the Public Hearing on Resolution 89, 1992 to the City Council Regular Meeting of 12/17/92, at approximately 8:00 P.M.; seconded by Vice Mayor Russo. The motion was unanimously approved by the City Council. RESOLUTION 97, 1992 Mayor Martino declared the Public Hearing open, which was duly advertised on 10/21/92 and held on the intent of Resolution 97, 1992, Granting a variance re: signage for Oakbrook Square Shopping Center located at 11594 U.S. Highway One. Mayor Martino explained the City Council was sitting as a quasi judicial board regarding this petition. -� Attorney Brant read, for the record, Section 155.18(A)(1) CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 9 authority to grant variance, petition, fee procedure. Chuck Cappella of Ferrin Signs, representing Oakbrook, addressed the City Council and reviewed the drawings for the proposed signs. Mr. Cappella stated the signs would not be changed, except for the fact that Oakbrook Square had changed the colors of the shopping center and the petitioner wished to have the signs match to shopping center. Mr. Cappella stated they were requesting the addition of an aesthetic cap on the existing signs. Mr. Cappella stated the reason for the variance was the addition of an artistic feature. In response to Vice Mayor Russo, Mr. Cappella stated Sign B and C would be 15' 3" high and Sign A would be 13' 9" high. Councilwoman Monroe felt the variance request was beyond the limits of the Sign Code and the Petitioner could provide an aesthetically appealing sign without enlarging it. Terri Spiers, Property Manager for Oakbrook Square, addressed the City Council stating the owners have invested approximately $500,000 in renovations to the shopping center and the modification to the signs would be the last capital improvement for the year and complete the capital enhancement program. Mr. Cappella stated, by the Council granting the sign variance, it would improve the safety aspects of the signs for the public and the aesthetic improvement to the signs would enhance the property values in the area. CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 10 I— In response to Councilwoman Monroe, Mr. Cappella stated the existing signs were larger than permitted by the Sign Code. Councilman Jablin made a motion, seconded by Vice Mayor Russo, to grant the sign variance requested by the Petitioner. In response to Vice Mayor Russo, Attorney Brant stated he read into the record the basic requirements for granting of a variance. Attorney Brant stated the code is clear that economics cannot be a basis for granting a variance. Attorney Brant stated there is no basis for aesthetics. In response to Vice Mayor Russo, Attorney Brant read Section 155.18(A)(1), Authority to Grant Variance, Petitioner, Fee Procedure, into the record. The motion was approved by a vote of 3 ayes and 1 nay. The nay vote was cast by Councilwoman Monroe for reasons previously stated. ORDINANCE 24, 1992 Mayor Martino declared the Public Hearing open, which was duly advertised on 10/21/92, and held on the intent of Ordinance 24, 1992, amendment to NorthCorp PCD, re: uses and clarification of specific conditions. Councilwoman Monroe stated her position on this request has been stated several times. Councilwoman Monroe stated she is a member of the Board of Directors of the Palm Beach Gardens Medical Center. Councilwoman Monroe stated she had requested an opinion from the Ethics Commission today as to .� whether or not she had a conflict of interest. Councilwoman CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 11 Monroe stated the ruling this afternoon by telephone was that she did have a conflict of interest and she requested to be excused from the discussion on this Ordinance and she had completed the required conflict of interest form. Rich Walton, Director of Planning and Zoning, addressed the City Council stating this petition had been before the Council several times. Mr. Walton stated there were two separate petitions. Mr. Walton stated one was a request to amend the PCD to add medical use as a permitted use and one was a request to add a church as a permitted use in the PCD. Mr. Walton stated included in Ordinance 24, 1992 were additional clean up conditions to clarify the original Ordinance. Mr. Walton briefly reviewed the amended language to the Ordinance. Mr. Walton stated staff was satisfied with the amended language to offer it to the City Council for consideration. Mayor Martino stated he was not comfortable with the wording in the first and third paragraph in Section 1., 12. Hank Skokowski, agent for Petitioner, Daniel Catafulmo as Trustee, addressed the City Council stating his client was the contract purchaser of two sites within the NorthCorp PCD, currently in process for PUD approval. The City Manager stated staff had not had an opportunity to review any of the information being submitted tonight. Mr. Skokowski stated Nick Lioce, legal counsel for the property owner, was in attendance this evening. Mr. CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 12 Skokowski stated John Flannigan, representative of Good Samaritan Medical Center, was also in attendance. Mr. Skokowski stated references made in the Jupiter - Courier that this facility is an out- patient surgery center was incorrect. Mr. Skokowski stated he felt the quote made by Mr. Orr in the Jupiter- Courier was also incorrect. Mr. Skokowski briefly reviewed the process the petition had undergone. Mr. Skokowski entered into the public record a copy of a report being referenced by The Coker Group. Mr. Skokowski stated the issue was the demand for health care services in the City of Palm Beach Gardens. Mr. Skokowski entered into the record, and reviewed excerpts from a handout entitled "NorthCorp PCD, Medical Use Amendment, Justification, Ordinance 24, 1992, November 5, 1992, Prepared by Urban Design Studio ". Mr. Skokowski entered into the record signed documents by businesses supporting new jobs in Palm Beach Gardens. Mr. Skokowski also introduced into the record letters from Denis M. Murphy, M.D., Elisabeth A. McKeen, M.D., and Augustin J. Schwartz, M.D., supporting the request by Petitioner. The City Manager stated the quote contributed to him by the Jupiter- Courier was in fact correct. John Flannigan, representative of Good Samaritan Health Pavilions, addressed the City Council and introduced Valeria Goodwin, Assistant to the President, and Cindy Bannick, Vice President of Nursing, who addressed the City Council and CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 13 ..f described the proposed uses. Attorney Brant reminded everyone this was not a court of law, but a legislative hearing. Raymond Royce, representing Palm Beach Gardens Medical Center; Mike Hoffman, CFO of Palm Beach Gardens Medical Center, representing Palm Beach Gardens Medical Center; Dr. V.A. Marks, 3370 Burns Road; Nila Wilbur, 13750 Prosperity Farms Road; Dr. Philip Buttaravoli, 2583 La Cristal Circle; Joan Barice, M.D., 3370 Burns Road; Paul Catania, representing Palm Beach Gardens Imaging Center; Joe Mueller, technologist at Palm Beach Gardens Medical Center; Dr. Roni Sehayik, 1983 PGA Blvd.; and, Schuyler C. Metlis, M.D., 15 St. James Drive, addressed the City Council expressing their `-" opposition to Ordinance 24, 1992 and citing as reasons, inconsistencies with the City's land use plan, no need for facility, service or uses, and no need for additional physicians. Gini Huley, 14898 Palmwood Road and Dr. Louis Mark, 1 Berwick Road, submitted cards in opposition to the Ordinance, but did not speak. Bill Upshaw, Palm Beach Gardens Marriott; David Taylor, representing USAA, owner of Loehmann's Plaza; and, Dr. Andrew Hodge, 1411 N. Flagler, spoke in favor of Ordinance 24, 1992. Brett P. Hill, 8709 Damascus Drive, and Ed Trainor, 4 Governors Court, submitted cards in favor of the Ordinance, but did not speak. Cindy Bannick, 202 Thornton Court and Vice President of Good CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 14 Samaritan Medical Center, addressed the City Council and reiterated the list of proposed medical uses and a breakdown of proposed services. Mr. Skokowski stated the Council had heard that this was an effort to consolidate services in a meaningful up -to -date manner. Mr. Skokowski stated there was very little space available for medical use which was consolidated in this type of volume. Mr. Skokowski stated the Petitioner was willing to live by all other regulations in place in the PCD if the Council approved the medical use. Mr. Skokowski stated the Petitioner was looking for approval which would allow them to develop the facility with a pre - packaged group of uses for a long term. Steve Mathison addressed the City Council stating Attorney Brant earlier this year ruled it was not necessary to take the medical use before DCA for further consideration. Attorney Mathison stated the Petitioner had relied upon that ruling and that was why they were here tonight. Attorney Mathison felt having competition in the City would not drive up costs, but help ensure costs were kept reasonable. Nick Lioce, attorney for CTB Realty Ventures XVI, addressed the City Council and briefly reviewed the NorthCorp PCD. Attorney Lioce stated from the beginning an office building was planned for this site. Attorney Lioce stated the funds coming from the closing of this project, which they have always believed was permitted on this site, was going to CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 15 �-' fund the off -site improvements. Dr. Richard Bergin, Palm Beach Gardens, addressed the City Council stating he felt another surgicenter was not needed. Attorney Brant requested the Chair to make part of this record all records pertaining to the action of the Planning and Zoning Commission and all records pertaining to this Ordinance within the Planning and Zoning Department. Attorney Brant stated, for the record, in reference to Attorney Royce's question as to whether the Land Use Plan should have been amended prior to proceeding with the medical use, Attorney Lioce had stated he concurred with Attorney Brant's opinion and the attorney for the co- petitioner also agreed with that opinion. Attorney Brant stated, to the Council, if that was an issue in reaching a final decision here tonight, in fairness, he would suggest the Council consider some of the alternatives offered by Attorney Royce. That would be a declaratory judgment from DCA or Circuit Court; and if there was any reservation on the issue of land use change influencing a nay vote, then now was the time so state same. Mayor Martino stated as Chairman of this meeting and Mayor of the City, would embrace the comments of the City Attorney offered and offer into the record all comments and /or legislative record keeping the Planning and Zoning Board may have generated regarding this petition concerning the medical use question and enter into the record any and all CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 16 correspondence, conversations, etc., the Planning and Zoning Department may have had regarding this matter. Mayor Martino stated there was a majority policy established early on concerning the question about the need for a comprehensive plan change to accomplish the task discussed. The policy decision was a majority view based on the opinion of the City Attorney it was not necessary and the Council could proceed. Mayor Martino questioned the councilmembers if there was a problem or question in their mind concerning the policy decision that the Council explore the opportunity to seek a declaratory judgment in the courts and /or DCA. Vice Mayor Russo stated the City Attorney gave the Council a decision based on the fact that it was a policy decision of the Council that it could be basically decided either way and it was a decision the Council would have to make. Vice Mayor Russo stated there were 5 councilmembers at that time and 3 voted for it and 2 voted against it. Vice Mayor Russo stated he felt it this was going to proceed, it should have been a comp plan amendment to explore all the issues. Vice Mayor Russo stated, at this point in time, he did not feel it is fair to the Petitioner, who relied on that policy decision by the Council, to go and change that policy decision. Vice Mayor Russo felt he had to make the decision now on the evidence put into the record tonight and all that had been put into the record in the preceding months and did not feel it was fair to go back now through a camp plan CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 17 process. Vice Mayor Russo stated if it was the feeling of the Petitioner and counsel that was the way they want to go, he would not have a problem with it. Mayor Martino stated he had concerns regarding some of the definitions discussed earlier. Mayor Martino stated he would not embrace this ordinance in any way if it was suggesting an opportunity for any member of the medical profession to offer a service that would suggest an operation that would come close to resembling a hospital or clinic that could work itself into a situation that would need to provide convalescence of patients. Mayor Martino stated he would rather embrace the definition of "clinic" as in the zoning code rather that what was in paragraph 12. Mayor Martino stated he would like CT scans and MRI's taken out of the ordinance. Mr. Skokowski stated the Petitioner is agreeable with changing the definition of "clinic" as included in the zoning code and deleting CT scans and MRI's, as requested by the Mayor. Vice Mayor Russo stated the church use had not been discussed this evening, however, felt the property was not zoned to do what they Petitioners wished to do with it and he could not be in favor of this petition on the medical use and the church use as this would change the character of the PCD. Councilman Jablin stated he had the same feelings Vice Mayor CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 18 Russo had expressed, as the land use bothers him, changing the uses that were originally intended and he could not support it. Councilman Jablin stated this was not a business decision, it had to do with the land use. Mr. 5kokowski stated they were interested in getting a decision from the Council tonight and would appreciate their consideration. Donaldson Hearing, gbs &h architects, representing Palm Beach Community Church, addressed the City Council stating this was a PCD and a PCD did provide for a variety of different uses and they were requesting the ability to utilize a few of the lots for the purpose of a church use. Mr. Hearing stated they felt the NorthCorp PCD had a variety of uses and a church use would be highly compatible and was consistent with the City's Comprehensive Plan and requested favorable consideration from the Council. In response to Vice Mayor Russo, Attorney Brant stated the church use could be separated out and the public hearing on the church use could be continued. Vice Mayor Russo stated he did not have a problem continuing the public hearing on the church use. In response to Mayor Martino, Attorney Brant stated the Council could bifurcate the public hearing, close it as to all items except the use of churches based on the time spent in the other use involved in public hearing. The next step would be at the discretion of the Council. Attorney Brant CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 19 stated also included in the ordinance were administrative clean up items which have not been addressed. Attorney Mathison stated they wished to have a vote by the Council on the medical use tonight. Attorney Lioce stated the administrative cleanup items, including the retail use, were acquiescence of the medical use, and if the council was going to vote one way on the medical use and one way on the church use, they would not agree to the amendments to the application. Mayor Martino stated, from a legal standpoint, he felt this should be dispensed with, in total, one way or another, tonight. There being no further comments from the public, Mayor Martino declared the Public Hearing closed. Per a consensus of the City Council, the read, by title only, on second and final 24, 1992. Vice Mayor Russo made a motion, seconded Jablin, to deny Ordinance 24, 1992. The by a vote of 3 ayes with Councilwoman Mo: Deputy City Clerk reading, Ordinance by Councilman motion was approved aroe not in attendance and not casting a vote. RECESS AND RECONVERN—E Per a consensus of the City Council, the meeting was recessed at 12:30 A.M. and reconvened at 12:42 A.M. ORDINANCE 2b, 1992 Mayor Martino declared the Public Hearing open, which was duly advertised 10/21/92, and held on the intent of CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 20 ordinance 25, 1992, amendment to Ordinance 3, 1985, approving a 2 -year extension of time for completion of Gardens Plaza PUD. Rich Walton, Director of Planning and Zoning, addressed the City Council stating the project met the requirements for traffic and this was a time extension and Petitioner had submitted criteria addressing his good faith effort to progress. Mr. Walton stated the Petitioner had withdrawn the request for the covered parking at the southeast corner of the site. In response to Mayor Martino, Mr. Walton stated a condition was included in the Ordinance providing for the collection of impact fees. Y Per a consensus of the City Council, in Section 1. A. 3. "Certificate of Occupancy of Phase II" was deleted and "building permit of Phase II" was inserted. Per a consensus of the City Council, an "Condition 13. No additional roof mounted equipment on either Phase I or Phase II without approval by subsequent Resolution by the City Council." as added. Al Malafatto, representing Petitioner, addressed the City Council stated The Gardens Mall would be seeking the monies from the Petitioner to maintain the landscaping along PGA Boulevard and staff could verify payments were being made. There being no further comments from the public, Mayor Martino declared the Public Hearing closed. CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 21 ,- Per a consensus of the City Council, the Deputy City Clerk read, by title only, on second and final reading, Ordinance 25, 1992. Councilwoman Monroe made a motion, seconded by Vice Mayor Russo, to approve Ordinance 25, 1992, as amended. The motion was unanimously approved by the City Council. RESOLUTIONS RESOLUTION 98, 1992 Rich Walton, Director of Planning and Zoning, addressed the City Council stating Resolution 98, 1992 was for a 3 year time extension on the Crystal Bay PUD (Parcel 2) with the Ballenisles PCD. Mr. Walton stated the original approval was for 52 zero --lot -line residential units. Mr. Walton stated 12 homes had been constructed to date. Mr. Walton stated the new owner of the undeveloped lots was the Channing Corporation who proposes to develop the remaining 40 lots with its own single- family zero lot line homes without modifying the approved density or design of the development. Mr. Walton stated the Petitioner had submitted his criteria for evaluating the good faith efforts and progress of the developer. Vice Mayor Russo made a motion, seconded by Councilwoman Monroe, to adopt Resolution 98, 1992, minor amendments to Crystal Bay PUD, approved by Resolution 90, 1989, Ballenlsles Parcel 2 PUD, re: time extension. The motion was unanimously approved by the City Council. .- SOLUTION CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 22 1992 Rich Walton, Director of Planning and Zoning, addressed the City Council stating Resolution 99, 1992, minor amendment to Crystal Bay PUD, approved by Resolution 90, 1989, Ballenlsles Parcel 2 PUD, re: new models. Mr. Walton stated the Petitioner was requesting to amend the approved setbacks. Mr. Walton stated the Petitioner was requesting a 15' front yard setback to the guest house for 2 of the models. Mr. Walton stated the Petitioner had agreed to limit utility meters to one service for each lot, therefore, the guest house would be serviced from this meter as well as the main house. Further, the Homeowner Association Documents would state that only the entire house would be allowed to be rented and that it would be the responsibility of the Homeowner Association to enforce the rules and regulations that it adopts. Mr. Walton stated the Petitioner had mailed certified letters on October 26, 1992, to the existing residents of the PUD notifying them of the proposed modifications. Mr. Walton stated Petitioner had had meetings with the residents and Petitioner had submitted copies of the certified cards mailed and responses from some residents. Raymond Royce, representing Petitioner, addressed the City Council stating the original developer built and sold 10 single family homes. Two models were also built, one was substantially complete and the other was just a shell. Attorney Royce stated of the 10 units sold, 5 homeowners are CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 23 currently in residence and 5 are out of town. Attorney Royce stated notice was given to all 10 owners dated October 23, 1992. Attorney Royce stated 4 of the residents out of town talked verbally to Mr. Channing and indicated their approval of the modifications. Attorney Royce stated 1 of the parties no one can find and the parties' attorney thinks the gentleman is ill or has passed away. Attorney Royce stated Petitioner had letters from the 5 residents in town approving the modifications. Councilwoman Monroe made a motion, seconded by Vice Mayor Russo, to approve Resolution 99, 1992. The motion was unanimously approved by the City Council. RESOLUTION 1992 Vice Mayor Russo stated he will abstain from discussion and voting on Resolution 100, 1992 and Resolution 101, 1992, as he had a conflict of interest, being he is an officer of the company and was filing his conflict of interest forms. Rich Walton, Director of Planning and Zoning, addressed the City Council stating Resolution 100, 1992, was a minor amendment to Hidden Hollow PUD approved by Ordinance lb, 1987, re: time extension. Mr. Walton stated this was a time extension for development of 56 single family homes on the south side of Northlake Boulevard, known as Hidden Hollow. Mr. Walton stated the original ordinance required all phases of development to be completed by May, 1993. Mr. Walton stated the Petitioner had indicated economic conditions have not been favorable for development. Mr. Walton stated the CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 24 Petitioner was requesting, rather than requiring all phases of development to be completed by May 3, 1992, the infrastructure for the PUD, including the sewer, water, drainage and paving (not inclusive of final lift of asphalt) be completed prior to June 30, 1997. Mr. Walton stated staff had a concern re: landscaping and on the revised Resolution, dated 11/5/92, staff was recommending Section 2. be included. Councilwoman Monroe requested this resolution be postponed until all conditions were reflected in the Resolution. Councilwoman Monroe stated she could not support a 5 year time extension, however, would be willing to consider an extension until 1995. Per a consensus of the City Council, Resolution 100, 1992, will be placed on the Consent Agenda at the 12/5/92 Regular Meeting. The Resolution will reflect all previously approved conditions. RESOLUTION 101, IT9T- Rich Walton, Director of Planning and Zoning, addressed the City Council re: Resolution 101, 1992, minor amendment to coral Cay PUD, approved by Resolution 54, 1989, BallenIsles Parcel 1 PUD, re: time extension. Mr. Walton stated this was a request for reinstatement and a 2 year time extension. Mr. Walton stated they were proceeding with building and the City had not dealt with how to proceed with a PUD inside a PCD. Mr. Walton stated the residential lots had been platted and all of the infrastructure was installed. CITY COUNCIL REGULAR MEETING, 1115/92 PAGE 25 Councilwoman Monroe made a motion, seconded by Councilman Jablin, to approve Resolution 141, 1992. The motion was approved by a vote of 3 ayes and Vice Mayor Russo abstaining. ORDINANCES O 26, 1997- Mayor Martino stated Ordinance 26, 1992, amendment to ITEMS FOR DISCUSSTON CORDANI PROPERTY 25% e vm Prosperity Corporate Plaza PUD, approved by Ordinance 21, 1989, and subsequently amended, re: time extension, was on for workshop. Councilwoman Monroe stated she was not in favor of the project originally and was not in favor of the time extension. Councilman Jablin made a motion, seconded by Vice Mayor Russo, to schedule first reading for Ordinance 26, 1992 for the next Regular City Council meeting. The motion was approved by 3 ayes and 1 nay. The nay vote was cast by Councilwoman Monroe for reasons previously stated. Rich Walton, Director of Planning and Zoning, addressed the City Council, stating this was a discussion for the environmental review of the 25% set aside in the City's Code and Comprehensive Plan. Mr. Walton stated the property was located west of the Beeline Highway and north of the C -18 Canal. Mr. Walton stated the Petitioner would be coming before the Council later with a site plan and rezoning to a CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 26 PUD. Mr. Walton stated the Petitioner had been working with the City since May and had been cooperative in making several revisions to the proposed reservation area. Mr. Walton stated staff still had concerns as documented in Mr. Schnelle's report. Mr. Walton stated staff felt wider upland preserve areas should be left around the major wetlands, in a contiguous manner, to maximize biodiversity and wildlife resources. Mr. Walton stated the current proposal fragments the landscape, leaving narrow preserve areas which staff felt were not capable of functioning. Mr. Walton stated staff was concerned the proposal would not be permitted by the regulatory agencies and the proposed preservation did not further the Save Our Rivers plan or the County's wildlife corridor scheme planned for this area. Mr. Walton stated staff had included several conditions in the staff report for Council's consideration. James Schnelle, environmental consultant, addressed the City Council stating this was a 734 acre tract, with approximately 56% upland transitional and the remaining acreage was wetland areas. Mr. Schnelle stated the wetlands were comprised of three major categories. Mr. Schnelle stated the main concern would be to preserve as many acres of wetlands as possible. Mr. Schnelle stated from the first plan, they had reduced the lake areas by approximately 20 acres and reduced the golf course by approximately 20 acres. Mr. Schnelle stated the wetlands impact had been reduced to CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 27 approximately 88 acres. Mr. Schnelle stated a field survey needed to be performed and have the agencies review the survey and they can determine which wetlands would be impacted. Mr. Schnelle stated they would like a 400' wide opening to provide for a wildlife corridor. Mr. Schnelle stated they were recommending to Council, the applicant be required to, where appropriate, provide an average 150' buffer preserve area around wetland 3, 4, and 12. Mr. Schnelle stated the applicant had provided approximately 104 acres of wetlands, not including the 25 acre water management buffer. Councilwoman Monroe stated when this area was annexed, she expressed concerns at that time with the timing issue because of the provisions of the basic services, i.e. police and fire protection and leapfrog development. Councilwoman Monroe expressed concern with the Petitioner spending lots of time and money on this project and felt they were going into too much depth at this time. Councilwoman Monroe felt these other issues should be addressed before the Petitioner got too far along. Councilman Jablin stated he had the same concerns as Councilwoman Monroe. Michael Tomaro, representing applicant, addressed the City Council, stating the applicant did not have any problem with Mr. Schnelle's recommendations and no problems with staff's recommendations. Mr. Tomaro stated Mr. Schnelle had CITY COUNCIL REGULAR MEETING, 11/5/92 PAGE 28 applicant's proposed language addressing the 150' contiguous buffer. Mr. Tomaro stated the only other specific concern was in Mr. Walton's memo of 11/2/92 re: hydroperiod calculations, mitigation designs and topographic elevations. Mr. Tomaro requested this information fall into place as it typically would in the process. Chuck Voboril, 8718 150th Court N., read a letter from Robert Fetty, 8762 150th Court N., Chuck Voboril, 8718 150th Court N., and Catherine Dwore, 13105 silver Fox Trail, addressed the City Council expressing environmental concerns with the proposal. Councilwoman Monroe stated she was not prepared to vote on this issue this evening, as this land was too valuable environmentally for her to make a decision at this time. Per a consensus of the City Council, the applicant was directed to make the recommended changes to their plan and return to the City Council for further direction. Councilwoman Monroe requested the County's response to the linkage of corridors along PGA Boulevard, the border issued addressed before the proposal came back to Council, and what rights property owners do or do not have re: wetlands. DEVONSHIRE PUD Rich Walton, Director of Planning and Zoning, addressed the City Council stating the Petitioner was requesting to amend the Devonshire PUD, a 337 unit life care facility, to modify the architectural design and site plan. Mr. Walton stated the Petitioner wished to construct a more compact site CITY COUNCIL REGULAR MEETING, 11/5/92 ADJOURNMENT APPROVAL PAGE 29 design, an expanded central amenities facility, a new parking and vehicle circulation system and a different mix and size of unit model types. The project density of 337 units would remain unchanged. George DeGuardiola, representing The Ecclestone Organization, addressed the City Council and reviewed the proposed modifications to the architectural design and site plan for the Devonshire PUD life care facility, Mr. DeGuardiola stated the Petitioner had agreed to comply with all conditions previously approved. Gabriel Salazar, project architect, addressed the City Council and reviewed the layout, architecture of the proposed project, and the phasing plan. Per a consensus of the City Council, staff was directed to prepare a Resolution for workshop and consideration of adoption for the next Council meeting. There being no further business to discuss, the meeting was adjourned at `s? : 2 0 A.M. 1 ) MAYOR MA,r1jTI O RUSS0 Ao"A M. RIEF, ?6` DEPUTY CLERK COU W-0XAN MONROE COL41--fLMAN JABLIN COUNCILWOMAN FURTADO FORM 8B MEMORANDUM OF VOTING CONFLICT FOR COUNTY, MUNICIPAL, AND OTHER LOCAL PUBLIC OFFICERS I AS'I NAMF I IRS 1 NAMI MIDDI r NAME NAME OF BOARD. COUNCIL. COMMISSION. AU'I IIORITY.OR COMMITIEE IACV S$ 0 d S �� CSC C_ cs 61Q? v N CC L MAILING ADDRFSS THE BOARD. COU NCI I., COMMISSION. AUTHORITY OR COMMITTEE ON WHICH I SERVE IS A UNIT OF: CITY O COUNTY O O111ER I.00AI. AGENCY CITY COUNTY i �/M ! t7 �1tT/l! (OJ�'t��NS ��j ✓c7�1� NAME OF POLITICAL SUBDIVISION: �� �L7 � loi�— ©�"`�� DA1 E ON WHICH VO_IE 0CCURRFD j� -✓/ MY POSITION IS: ELECTIVE O APPOINTIVE f I WHO MUST FILE FORM 86 This form is for use by any person serving at the county, city, or other local level of government on an appointed or elected board, council, commission, authority, or committee. It applies equally to members of advisory and non - advisory bodies who are presented with a voting conflict of interest under Section 112.3143, Florida Statutes. Your responsibilities under the law when faced with a pleasure in which you have a conflict of interest will vary greatly depending on whether you hold an elective or appointive position. For this reason, please pay close attention to the instructions on this form before completing the reverse side and filing the form. INSTRUCTIONS FOR COMPLIANCE WITH SECTION 112.3143, FLORIDA STATUTES ELECTED OFFICERS: A person holding elective county, municipal, or other local public office MUST ABSTAIN from voting on a measure which inures to his special private gain. Each local officer also is prohibited from knowingly voting on a measure which inures to the special gain of a principal (other than a government agency) by whom he is retained. In either case, you should disclose the conflict: PRIOR TO THE VOTE BEING TAKEN by publicly stating to the assembly the nature of your interest in the measure on which you are abstaining from voting; and WITHIN 15 DAYS AFTER THE VOTE OCCURS by completing and filing this form with the person responsible for recording the minutes of the meeting, who should incorporate the form in the minutes. APPOINTED OFFICERS: A person holding appointive county, municipal, or other local public office MUST ABSTAIN from voting on a measure which inures to his special private gain. Each local officer also is prohibited from knowingly voting on a measure which inures to the special gain of a principal (other than a government agency) by whom he is retained. A person holding an appointive local office otherwise may participate in a matter in which he has a conflict of interest, but must disclose the nature of the conflict before making any attempt to influence the decision by oral or written communication, whether made by the officer or at his direction. IF YOU INTEND TO MAKE ANY ATTEMPT TO INFLUENCE THE DECISION PRIOR TO THE MEETING AT WHICH THE VOTE WILL BE TAKEN: • You should complete and file this form (before making any attempt to influence the decision) with the person responsible for recording the minutes of the meeting, who will incorporate the form in the minutes. • A copy of the form should be provided immediately to the other members of the agency. • The form should be read publicly at the meeting prior to consideration of the matter in which you have a conflict of interest. CE FORM 88 - 1 -91 PAGE I IF YOU MAKE NO ATTEMPT TO INFLUENCE THE DECISION EXCEPT BY DISCUSSION AT THE MEETING: • You should disclose orally the nature of your conflict in the measure before participating. • You should complete the form and file it within 15 days after the vote occurs with the person responsible for recording the minu of the meeting, who should incorporate the form in the minutes. DISCLOSURE OF LOCAL OFFICER'S INTEREST 1, V ®s � �-@ S 5 0 , hereby disclose that on 11L (a) A measure came or will come before my agency which (check one) inured to my special private gain; or inured to the special gain of (b) The measure before my agency and the nature of my interest in the measure is as follows: Date Fil d 19 9 : by whom I am retained. C" R—, "j NOTICE: UNDER PROVISIONS OF FLORIDA STATUTES §112.317 (1985), A FAILURE TO MAKE ANY REQUIRED DISCLOSURE CONSTITUTES GROUNDS FOR AND MAY BE PUNISHED BY ONE OR MORE OF THE FOLLOWING: IMPEACHMENT, REMOVAL OR SUSPENSION FROM OFFICE OR EMPLOYMENT, DEMOTION, REDUCTION IN SALARY, REPRIMAND, OR A CIVIL PENALTY NOT TO EXCEED $5,000. CE FORM 8B- 1-91 PAGE 2 4 FORM S13 MEMORANDUM OF VOTING CONFLICT FOR COUNTY, MUNICIPAL, AND OTHER LOCAL PUBLIC OFFICERS I AS'l NAMI: I IRS I NAMI MIDDI 1: ' NAME OF BOARD, C'OUNUL. COMMISSION. AU'I HORI1 Y.OR COMM I'll EE tou' vSS® V o SaY/�` j� oC-C.O .G( MAILING ADDRI SS 1 "HE BOARD, COUNCIL. COMMISSION. AUTHORITY OR COMMITTEE ON I SERVE IS A UNITOF`, �WHICH TY ❑ COUNTY O OTHER LOCAL AGENCY CITY COUNIN -C NAM F POI.ITICAI. SIIBUIVISION: / DATE ON WHICH \' "IF_OCCURRED MY POSITION IS: / ELECTIVE O APPOINTIVE WHO MUST FILE FORM 8B This form is for use by any person serving at the county, city, or other local level of government on an appointed or elected board, council, commission, authority, or committee. It applies equally to members of advisory and non - advisory bodies who are presented with a voting conflict of interest under Section 112.3143, Florida Statutes. Your responsibilities under the law when faced with a measure in which you have a conflict of interest will vary greatly depending on whether you hold an elective or appointive position. For this reason, please pay close attention to the instructions on this form before completing the reverse side and filing the form. INSTRUCTIONS FOR COMPLIANCE WITH SECTION 112.3143, FLORIDA STATUTES ELECTED OFFICERS: A person holding elective county, municipal, or other local public office MUST ABSTAIN from voting on a• measure which inures to his special private gain. Each local officer also is prohibited from knowingly voting on a measure which inures to the special gain of a principal (other than a government agency) by whom he is retained. In either case, you should disclose the conflict: PRIOR TO THE VOTE BEING TAKEN by publicly stating to the assembly the nature of your interest in the measure on which you are abstaining from voting; and WITHIN 15 DAYS AFTER THE VOTE OCCURS by completing and filing this form with the person responsible for recording the minutes of the meeting, who should incorporate the form in the minutes. APPOINTED OFFICERS: A person holding appointive county, municipal, or other local public office MUST ABSTAIN from voting on a measure which inures to his special private gain. Each local officer also is prohibited from knowingly voting on a measure which inures to the special gain of a principal (other than a government agency) by whom he is retained. A person holding an appointive local office otherwise may participate in a matter in which he has a conflict of interest, but must disclose the nature of the conflict before making any attempt to influence the decision by oral or written communication, whether made by the officer or at his direction. IF YOU INTEND TO MAKE ANY ATTEMPT TO INFLUENCE THE DECISION PRIOR TO THE MEETING AT WHICH THE VOTE WILL BE TAKEN: • You should complete and file this form (before making any attempt to influence the decision) with the person responsible for recording the minutes of the meeting, who will incorporate the form in the minutes. • A copy of the form should be provided immediately to the other members of the agency. • The form should be read publicly at the meeting prior to consideration of the matter in which you have a conflict of interest. CE FORM XB - 1 -91 PACE 1 IF YOU MAKE NO ATTEMPT TO INFLUENCE THE DECISION EXCEPT BY DISCUSSION AT THE MEETING: e You should disclose orally the nature of your conflict in the measure before participating. • You should complete the form and file it within 15 days after the vote occurs with the person responsible for recording the minutes of the meeting, who should incorporate the form in the minutes. DISCLOSURE OF LOCAL OFFICER'S INTEREST hereby disclose that on r ( + . 19 (a) AA measure came or will come before my agency which (check one) V inured to my special private gain; or inured to the special gain of , by whom I am retained. (b) The measure before my agency and the nature of my interest in the measure is as follows: Date Filed Signat r NOTICE: UNDER PROVISIONS OF FLORIDA STATUTES §112.317 (1985), A FAILURE TO MAKE ANY REQUIRED DISCLOSURE CONSTITUTES GROUNDS FOR AND MAY BE PUNISHED BY ONE OR MORE OF THE FOLLOWING: IMPEACHMENT, REMOVAL OR SUSPENSION FROM OFFICE OR EMPLOYMENT, DEMOTION, REDUCTION IN SALARY, REPRIMAND, OR A CIVIL PENALTY NOT TO EXCEED $5,000. CE FORM 8B • 1.91 PAGE 2 4 FORM 8B MEMORANDUM OF VOTING CONFLICT FOR COUNTY, MUNICIPAL, AND OTHER LOCAL PUBLIC OFFICERS 1 pi ASI NAMF IIRS1 NAN I MII)DIFNAME �� NAME 01 ARD,C' OIIN(, II., COMMISSION, AU'IIIORITY,ORC'OMMIT'TEE MAILING ADDRFSS I HE BOARD, COUNCIL COMMISSION, AIJTHORIIY OR COMMITTEE ON WHICH 1 SERVE IS A UNIT OF: ❑ CITY ❑ COUNTY ❑ 01 HER LOCAL AGENCY CH ' C'OUN1Y NAME OF I'OI.ITICAI. SUBDIVISION: G•�� CJC �� /�� DAl'E ON WHICH VOTE O('CIIRRFD g ��' - / �/ MY POSITION IS: ELECTIVE ❑ APPOINTIVE WHO MUST FILE FORM 88 This form is for use by any person serving at the county, city, or other local level of government on an appointed or elected board, council, commission, authority, or committee. It applies equally to members of advisory and non - advisory bodies who are presented with a voting conflict of interest under Section 112.3143, Florida Statutes. Your responsibilities under the law when faced with a measure in which you have a conflict of interest will vary greatly depending on whether you hold an elective or appointive position. For this reason, please pay close attention to the instructions on this form before completing the reverse side and filing the form. INSTRUCTIONS FOR C'OMPLIANOE ii91TH SECTION ii2.3-i43, F' &OiIDA STATUTES ELECTED OFFICERS: A person holding elective county, municipal, or other local public office MUST ABSTAIN from voting on a measure which inures to his special private gain. Each local officer also is prohibited from knowingly voting on a measure which inures to the special gain of a principal (other than a government agency) by whom he is retained. In either case, you should disclose the conflict: PRIOR TO THE VOTE BEING TAKEN by publicly stating to the assembly the nature of your interest in the measure on which you are abstaining from voting; and WITHIN 15 DAYS AFTER THE VOTE OCCURS by completing and filing this form with the person responsible for recording the minutes of the meeting, who should incorporate the form in the minutes. APPOINTED OFFICERS: A person holding appointive county, municipal, or other local, public office MUST ABSTAIN from voting on a measure which inures to his special private gain. Each local officer also is prohibited from knowingly voting on a measure which inures to the special gain of a principal (other than a government agency) by whom he is retained. A person holding an appointive local office otherwise may para:icipate in a matter in which he has a conflict of interest, but must disclose the nature of the conflict before making any attempt to influence the decision by oral or written communication, whether made by the officer or at his direction. IF YOU INTEND TO MAKE ANY ATTEMPT TO INFLUENCE THE DECISION PRIOR TO THE MEETING AT WHICH THE VOTE WILL BE TAKEN: You should complete and file this form (before making any attempt to influence the decision) with the person responsible for recording the minutes of the meeting, who will incorporate the form in the minutes. • A copy of the form should be provided immediately to the other members of the agency. • The form should be read publicly at the meeting prior to consideration of the matter in which you have a conflict of interest. CE FORM 8B - 1 -91 PAGE I IF YOU MAKE NO ATTEMPT TO INFLUENCE THE DECISION EXCEPT BY DISCUSSION AT THE MEETING: • You should disclose orally the nature of your conflict in the measure before participating. • You should complete the form and file it within 15 days after the vote occurs with the person responsible for recording the min of the meeting, who should incorporate the form in the minutes. l DISCLOSURE OF LOCAL OFFICER'S INTEREST , hereby disclose that on �� �S' 19 (a) A measure came or will come before my agency which (check one) inured to my special private gain; or t/ inured to the special gain of &I" 3g7z:w Dew /�� /(�jz. L��!�2'C by whom I am retained. (b) The measure before my agency and the nature of my interest in the measure is as follows: // -S, f v Date Filed nature NOTICE: UNDER PROVISIONS OF FLORIDA STATUTES §112.317 (1985), A FAILURE TO -MAKE ANY REQUIRED DISCLOSURE CONSTITUTES GROUNDS FOR AND MAY BE PUNISHED BY ONE OR MORE OF THE FOLLOWING: IMPEACHMENT, REMOVAL OR SUSPENSION FROM OFFICE OR EMPLOYMENT, DEMOTION, REDUCTION IN SALARY, REPRIMAND, OR A CIVIL PENALTY NOT TO EXCEED $5,000. CE FORM NB • 1-91 PAGE 2