Page One of Two
JDM PLANNED COMMUNITY DISTRICT
DRAFT CONDITIONS OF APPROVAL
NOVEMBER 22, 1988
REVISED! DECEMBER 15, 1988
1) For the purposes of this PCD, density designations shall be
defined as follows:
LOW 0 - 4 du' s /acre �
MEDIUM 4 --8 du's /acre
HIGH 8 - 12 du's /acre
2) Parcels designated as low density shall be limited to single
family detached housing.
3) Residential development shall be limited to a maximum of 2
storys.
4). The petitioner shall amend the Master Plan to reflect low
density single family development on that portion of parcel 25
that abuts the Gardens Glen development.
5) Residential sales models shall not be constructed in parcels
designated number 26 and 27.
6) A perimeter buffer in accordance with Exhibit B shall be
constructed at the time of development of each abutting parcel.
Page Two of Two
•. ..tip ''t
7) The petitioner shall maintain a residential development
setback from Gardens Glen equal to the setback maintained by
Gardens Glen common to the property line.
In all other areas a minimum setback of 25 feet shall be
maintained from the property line. Furthermore, individual parcel
development setbacks shall be established at the time of PUD
approval of each development parcel.
8) Notwithstanding the petitioners right to security and his
continuing need ,to coordinate and cooperate with the existing
,r
residential communiVy in that regard, the petitioner shall not.
Ce construct any perimeter security system which would affect the
quality and character of exiisting views of the golf course,
lakes and canals thereon from adjacent properties not in the PCD
including fences, walls, hedges, moats or the like.
9) The petitioner shall provide a minimum land area of 1/4 acre
dedicated to the public for a passive park to be located along
the proposed Holly Drive cul -de -sac.
10) The petitioner shall provide for new entrances from PGA
Boulevard and Military Trail and shall provide for the cul -de -sac
construction of Avenue of the PGA and Holly Drive as noted on the
Master plan.
JDM Transportatlon Consideratlons
1. The JDM development will be responsible for constructing site related improvements
as defined In Conditions 2 through 4.
2. The developer will provide the following improvements at the JDM /PGA Boulevard
entrance.
a) westbound left -turn lane
b) eastbound right -turn lane '
c) northbound left -turn lane
d) northbound through lane
e) northbound right -turn lane
f) Intersection signalization when warranted. At such time as the signal is
installed, it will be coordinated with signals at the turnpike entrance and
Central Boulevard (to the extent that it is within the authority of Palm Beach
Gardens, the City of Palm Beach Gardens will require development on the
north side of PGA Boulevard which uses this intersection to participate in the
funding of the traffic signal installation, including signal coordination costs.
3. Military Trail entrance - The developer will provide the following improvements
when an entrance is connected at Military Trail.
a) northbound left -turn lane
b) southbound right -turn lane
c) eastbound left -turn lane
d) eastbound through lane
e) signalization when warranted after connection is made
4..
40297*03Cond J2- JJ.sgg 4 •
4.
S.
Northlake Boulevard entrance - The developer will provide the following
improvements when the development access is constructed for Northlake Boulevard.
a) westbound right -turn lane
b) eastbound left -turn lane
c) southbound left -turn lane
d) southbound through lane
e) signalization when warranted after connection is made
In order to conform with the Palm Beach Gardens traffic performance standards, the
following project staging will be followed.
Stage l:
Initial access will be provided via PGA Boulevard. Improvements defined in
Condition 2 will be constructed prior to the issuance of Phase I certificates of
occupancy. Up to 670 permits may be issued .upon completion of the entrance
improvements.
State 2:
Stage 2 will include building permits for 671 to 1,200. units. To obtain certificates
of occupancy for Stage 2, one of the following conditions must be met:
a) connection to Military Trail
b) connection to Northlake Boulevard
c) Six - laning of PGA Boulevard between the development entrance and Military
Trail.
Stage 3:
Stage 3 will include building permits for 1,201 to 1,600 units. To obtain certificates
of occupancy for Stage 3, two of the following three conditions must be met:
a) connection to Military Trail
b) connection to Northlake Boulevard
c) Six - laning of PGA Boulevard between the development entrance and Military
Trail.
r
4029ro3Cond 12 -1 S.sg j : ; •2-
I®
rrt�lcy• Hur rr
6.
7.
$tan- 4:
Stage 4 will include building permits for 1.601 to 2,384 units. In order to obtain
certificates of occupancy for development in Stage 4, the following conditions must
be met:
a) connection to Military Trail
b) connection to Northlake Boulevard
c) Six- laning of PGA Boulevard between the development entrance and Military
Trail.
el) Sa_._,nd Tvrnp'%KQ En+r.'rC -k1P6A
Military Trail and Northlake Boulevard will not be used as main development
entrances until the capacity of these roads are improved (providing for a four -lane
divided section). .
The developer will work with Palm Beach Gardens and Palm Beach County tQ seek
implementation of the off -site improvements listed below:
a) six -lane PGA Boulevard from east of Florida's Turnpike to Military Trail
b) four -lane Military Trail from Northlake Boulevard to PGA Boulevard, including
intersection improvements at PGA Boulevard and at Northlake Boulevard
(currently programmed by Palm Beach County for FY 89 -90)
c) four -lane Northlake Boulevard from development entrance to Military Trail
It is recognized that the roadway impact fee obligation associated with this project
is approximately $1.6 million.