HomeMy WebLinkAboutMinutes Council 092360CITY OF PALM BEACH GARDENS
SPECIAL MEETING OF CITY COUNCIL
Upon call of the Mayor a special Council meting, of the City of Palm
Beach Gardens was held at 2:00 PM on September 23rd, 1960, at 1001
Park Avenue, Lake Park, Florida.
The Clerk announced a quorum to be present, and waiver of notice by all
Council members.
HOUSTON TEXAS GAS & OIL
CORPORATION: SERVICE
AGREEf7NT: R. J. Morgan,
presented to u-
tion of natural gas to the City and its residents and industries.
After discussion the following Resolution was un-
animously enacted:
RESOLUTION
WHEREAS, the CITY OF PAIM BEACH GARDENS, Florida, a Florida municipality
incorporated under the laws of Florida on June 20, 1959, and
WHEREAS, it is the desire of the City Council to provide natural gas
utility service to the residential, commercial and industrial establish -
ments in the City, and to that end has had an engineering and economic
feasibility study made of the proposed natural gas distribution system,
and
WHEREAS, said study shows that the construction and operation of such a
system would be economically feasible, can be financed and will produce
extensive benefits to the City and its inhabitants, now therefore
ES IT RESOLVED that the Mayor of the CITY OF PALM BEACH GARDENS be and
hereby is authorized to execute a Service Agreement for General Service
with Houston Texas Gas and Oil Corporation for the quantities of natural
gas shoran for the third year in said engineering report.
The meet" g then adjourned.
-- Norman D. Rowl d, City Clerk
Herbert B. Thompson, Mayor
z �_
ENGINEERING REPORT
AND
FEASIBILITY STUDY
FOR A
NATURAL GAS DISTRIBUTION SYSTEM
TO SERVE THE
CITY OF PALM BEACH GARDENS,
FLORIDA
i�
OCTOBER 1, 1960 r
Cf �-
CITY OF PALM BEACH GARDENS, FLORIDA
1001 PARR AVENUE
F LAKE PARK, FLORIDA
TABLE OF CONTENTS
Page
I.
THE SERVICE AREA . . . . . . . . . . . . . . . . . . .
. . 1
II.
BASIS OF STUDY
Numberof Customers . . . . . • • • • • • • • • • . •
• • 2
Gas Consumption . . . . . . . . . . . . . . . . . . .
. . 2
Maximum Day Requirements . . . . . . . . . . . . . .
. . 3
Revenue. . . . . . . . . . . . . . . . . . . . . . .
. . 3
Operating Costs. . . . . . . . . • . • • • • • • • •
• • 4
Description of Distribution System . . . . . . . . .
. . 4
Financing . . . . . . . . . . . . . . . . . . . . . .
. . 5
Feasibility . . . . . . . . . . . . . . . . . . . . .
. . 5
SCHEDULES
1.
Number of Customers and Gas Requirements . . . . . . .
. . 6
2.
House Construction Schedule and Estimated Number . . .
of Residential Gas Customers . . . . . . . . . . .
7
3.
Operating Costs and Net Revenue . . . . . . . . . . . .
. . 8
4.
Proposed Natural Gas Rates . . . . . . . . . . . . . .
. . 9
5.
Proposed Natural Gas Rates - Comparison With
Other Florida Natural Gas Rates . . . . . . . . . . .
. . 10
6.
Natural Gas Distribution System Cost Estimate
and Required Investment ($) . . . . . . . . . . . . .
. . 11
7.
Schedule of Debt Service Requirements. . . . . . . . .
. . 12
8.
Debt Coverage Ratio . . . . . . . . . . . . . . . . . .
. . 13
THE CITY OF PALM BEACH GARDENS
'1_1 PROPOSED NATURAL GAS DISTRIBUTION SYSTEM
I. THE SERVICE AREA
The City of Palm Beach Gardens, Florida was incorporated as a
municipality on June 19, 1959, and comprises approximately 6.5 square
miles located approximately five miles north of the City of West Palm
Beach, Florida. It is bounded on the west by the Sunshine State Parkway,
on which the Houston Texas Gas and Oil Corporation's main natural gas
pipeline is located, and is bounded on the east by the Atlantic Ocean
resort areas of North Palm Beach and Lake Worth. The City is presently
under development and has five miles of paved streets, eight miles of
water lines, and eight miles of sanitary sewer lines. When completed, it
will provide for 12,000 residential lots and 1,000 acres for industrial
sites. The sanitary sewer and water supply plant has already been in-
stalled with capacity for approximately 25 per cent of the ultimate re-
quirements.
There are numerous manufacturing plants located in the surrounding
area. The Radio Corporation of America has a plant under construction in
the City of Palm Beach Gardens. The floor space of this plant comprises
210,000 square feet, and the plant will commence operations in January of
1961 with a complement of 1,000 employees. This complement will be in-
creased to approximately 2,500 by January of 1962.
Since the inception of the development, prospective residents and
prospective industries have repeatedly requested natural gas service such
that now, with the construction of residences and industrial plants under way,
it is imperative that natural gas be made available as quickly as possible.
- 1 -
II. BASIS OF STUDY
Number of Customers: The number of natural gas customers was es-
timated on the basis of 50 per cent of the houses constructed, as shown on
SCHEDULE 2, which was conservatively estimated to have 1,250 houses con-
structed by December of 1963. The commercial customers were estimated on
the basis of the construction schedule for the shopping center which will
provide the basic commodity requirements for the residents of the houses.
Gas Consumption: The natural gas sales quantities were determined
by months for a full three -year period, again based on the house building
schedule for the number of natural gas users for each month. A minimum of
four natural gas burning appliances will be installed in each house, with
some provision for selection on the part of the prospective home buyer.
It was estimated that this selection will result in the following composite
average customer consumption:
Consumption No. of Appliances Total Annual
Type of Appliance Therms per Year Per 10 Customers Consumption
Cooking 60 9 530
Hot Water Heating 80 10 800
Refrigeration 175 9 1,575
Space Heating 220 5 1,100
Clothes Dryer 40 4 160
Gas Light 150 4 600
Incinerator 150 1 150
TOTAL 42 4,915
Average No. Appliances Per Customer - 4.2
Average Consumption Per Customer Per Year - 491.5 Therms
The monthly consumption of natural gas by customers along the lower
East Coast of Florida is unique in that it does not adhere to the degree day
incidence. This can be attributed somewhat to the fact that natural gas cus-
tomers with some other type of fuel for space heating will depend upon certain
2 -
of these natural gas appliances for "chill chasers" for limited periods,
while others will use their natural gas cooking stove to supply all of
their space heating needs. The monthly consumption for normal humanistic
requirements, expressed as a per cent of the annual consumption, was used
in this study in resolving the annual customer consumption to a monthly
basis. These percentages were:
Month Per Cent of Annual Consumption
January 12.4
February 10.6
March 9.8
April 8.6
May 7.3
June 6.8
July 6.2
August 6.4
September 6.7
October 7.0
November 8.2
December 10.0
100.0
Maximum Day Requirements: The maximum day requirements were deter-
mined on the basis of a 66 per cent load factor for the maximum month, which
was determined from a detailed analysis of natural gas system send out for
the Lower East Coast of Florida. Commercial customers' monthly and maximum
day consumptions were determined in a similar manner as the above for resi-
dential, with the small commercial customers using 705 therms per year and
the large commercial customers using 1,540 therms per year.
The actual load characteristics used for the R.C.A. plant were
determined from consultation with company representatives.
Revenue: SCHEDULE 3 shows the revenue and operating costs. The
revenue was determined by applying the rates from SCHEDULE 4 against the
monthly consumption quantities for each class of service. SCHEDULE 5 is a
- 3 -
comparison of these proposed rates with those of three other Florida nat-
ural gas companies. Companies "A" and "B" are situated along the Lower
East Coast of Florida, while Company "C" is farther north in the approxi-
mate center of the State.
Operating Costs: The operating expenses were determined to be
$50.00 per customer for the first year; $40.00 per customer for the second
year; and $30.00 per customer for the third and subsequent years. The same
personnel will also operate the other utilities of the City.
The present effective rate of the Houston Texas Gas and Oil Cor-
poration provides for 5.5 cents per therm for firm gas; an application is
pending for increasing this rate to 5.9 cents per therm. The net revenue
has been determined under two conditions, each based respectively on these
rates.
�.. Description of Distribution System: The cost of the proposed sys-
tem is shown on SCHEDULE 6. The city gate will include odorization facili-
ties and provide space for future pressure regulators. The 6 -inch and 4 -inch
welded steel feeder main to be installed prior to January of 1961, has been
designed for high pressure operation. This main is so located, and its capa-
city is such, that it can supply gas to all areas proposed to be served. It
will provide high pressure service as may be required to all commercial and
industrial areas. The residential areas will be served through a system of
plastic mains and plastic yard service lines at pressures under 50 psi.
through district pole -type regulators from taps along this high pressure
feeder main.
All materials required for the initial construction period are on
hand. Construction crews, presently engaged in other work in the City, are
- 4 -
ready to commence construction at the prices used in determining the costs
of the proposed system.
Financing: The plan of financing, as shown on SCHEDULE 7, has
been agreed to by both the City and the bond purchasers on the basis of
5 per cent interest, with complete bond retirement by the end of the 22nd
year of operations. The first three - years' interest will be included in
the bonded debt, and the first three- years' financing requirements will be
made available as needed.
Feasibility: Economic feasibility was determined on the basis of
debt coverage, which is shown on SCHEDULE 8. The debt coverage ratio is
conservative in view of the conservative number of customers estimated and
the relatively high bond interest rate. The proposed natural gas rates are
slightly lower than those presently in effect in the Lower East Coast of
o.� Florida, which will make them attractive to new residents.
U
- 5 -
SCHEDULE
1
CITY i0F PALM BEACH GARDENS
NUMBER OF CUSTOMERS AND
GAS REQUIREMENTS
1961
1962
1963
Number of Customers (Year End)
Residential
125
325
625
Commercial Small
3
6
10
Commercial Large
2
3
5
R.C.A.
1
1
1
TOTAL CUSTOMERS
131
335
641
Annual Sales (Therms)
Residential
40,880
115,910
257,700
Commercial Small
1,300
3,440
6,205
Commercial Large
820
3,410
6,290
R.C.A.
9,365
9,365
9,365
TOTAL SALES
52,365
132,125
279,560
Unaccounted for (3%)
1,595
3,945
8090
TOTAL PURCHASES (Therms)
53,960
136,070
287,950
MAXIMUM DAY REQUIREMENTS (Therms)
445
985
1,710
u
M:E
v
- 7 -
SCHEDULE 2
CITY OF PALM
BEACH GARDENS
HOUSE CONSTRUCTION
SCHEDULE AND
ESTIMATED NUMBER
OF RESIDENTIAL GAS CUSTOMERS
Month
1961
1962
1963
Houses No.
Natl.
houses No.
Natl.
houses No.
Natl.
Completed Gaq
Cust.
Completed Gas
Cust.
Completed Gas
Cust.
January
100
50
275
137
800
400
February
110
50
300
150
850
425
March
120
60
330
165
900
450
April
130
65
360
180
950
475
May
145
72
400
200
1,000
500
June
160
80
450
225
1,050
525
July
175
87
500
250
1,090
545
August
190
95
550
275
1,130
565
September
205
102
600
300
1,170
585
October
220
110
650
325
1,200
600
November
235
117
700
350
1,225
612
December
250
125
750
375
1,250
625
v
- 7 -
SCHEDULE 3
CITY OF PALM BEACH GARDENS
OPERATIN� COSTS AND NET REVENUE
Operating Costs:
as ( /Therm
Operations(l)
TOTAL OPERATING COSTS
NET REVENUE
At Gas Cost of 5.9G /Therm:
as
Operations
TOTAL OPERATING COSTS
NET REVENUE
2,960 7,500 15,800
6,650 13,400 19,200
9,610 20,900 35,000 35,000 35,000 730,510
2,786 11,831 33,595 35,000 35,000 713,212
3,176 8,045 17,000
6,650 13,400 19,200
9,826 21,445 36,200 37,000 37,000 770,471
2,570 11,286 32,395 33,000 33,000 673,251
(1) Operating costs to include Operations and Maintenance; Customer Accounting
and Collecting; Sales; General and Administrative; $50.00 /customer, first
year; $40.00 /customer second year; and $30.00 /customer third year.
- 8 -
Total For
1961
1962
1963 1964
1965 22 Years
$
$ $
7--s
Revenue:
Residential
10,290
29,790
64,450
Commercial Small
306
772
1,402
Commercial Large
307
676
1,250
R.C.A.
1,493
1,493
1,493
TOTAL REVENUE
12,396
32,731
68,595 70,000
70,000 1,443,722
Operating Costs:
as ( /Therm
Operations(l)
TOTAL OPERATING COSTS
NET REVENUE
At Gas Cost of 5.9G /Therm:
as
Operations
TOTAL OPERATING COSTS
NET REVENUE
2,960 7,500 15,800
6,650 13,400 19,200
9,610 20,900 35,000 35,000 35,000 730,510
2,786 11,831 33,595 35,000 35,000 713,212
3,176 8,045 17,000
6,650 13,400 19,200
9,826 21,445 36,200 37,000 37,000 770,471
2,570 11,286 32,395 33,000 33,000 673,251
(1) Operating costs to include Operations and Maintenance; Customer Accounting
and Collecting; Sales; General and Administrative; $50.00 /customer, first
year; $40.00 /customer second year; and $30.00 /customer third year.
- 8 -
M
LMWA
SCHEDULE 4
CITY OF PALM BEACH GARDENS
PROPOSED NATURAL GAS RATES
(Available to All Classes of Service)
Minimum Monthly Charge - $12.50
First
5
Therims
used
per month
$2.50
Minimum
Next
20
Therms
used
per month
@
.25
Per
Therm
Next
975
TherSms
used
per month
@
.17
Per
Therm
Next
1,000
Therms
used
per month
@
.14
Per
Therm
Next
3,000
Therms
used
per month
@
.11
Per
Therm
All Over 5,000
Therms
used
per month
@
.08
Per
Therm
Monthly Consumption
Total
Average Rate
(Therms)
Monthly Bill
p /Therm
0
$
2.50
5
2.50
50.00
10
3.75
37.50
15
5.00
33.30
20
6.25
31.20
30
8.35
27.80
40
10,05
25.10
50
11.75
23.50
75
16.00
21.30
100
20.25
20.25
200
37.25
18.60
500
88.25
17.65
1,000
173.25
17.32
2,000
313.25
15.15
5,000
643.25
12.85
loM
1,043.25
10.43
25m
2,243.25
9.00
50M
4,243.25
8.50
loom
8,243.25
8.24
- 9 -
u
SCHEDULE 5
CITY,OF PALM BEACH GARDENS
PROPOSED NATURAL GAS RATES
COMPARISON WITH OTHER FLORIDA NATURAL GAS RATES
Consumption
Palm Beach Gardens
Therms Per Month
Proposed Rate Co. "A"
Co. "B"
Co. "C"
RESIDENTIAL-
2
$ 2.50 $
2.10
$ 1.75
$ 1.75
5
2.50
2.68
2.00
1.97
10
3.75
4.13
4.00
3.07
20
6.25
6.73
7.10
5.27
30
8.35
9.33
9.10
7.07
40
10.05
11.63
11.10
8.87
50
11.75
13.93
13.10
10.37
75
16.00
18.43
16.70
14.07
100
20.25
22.93
20.30
17.57
COMMERCIAL SMALL:
10
3.75
4.13
4.00
2.77
20
6.25
6.73
7.50
4.47
50
11.75
14.53
16.75
9.57
100
20.25
27.53
30.50
18.07
200
37.25
52.03
55.50
35.07
500
88.25
111.03
112.50
83.07
1,000
173.25
201.03
207.50
163.07
COMMERCIAL LARGE:
100
20.25
150.00
50.00
60.00
500
88.25
150.00
90.00
60.00
1,000
173.25
175.00
170.00
120.00
5,000
643.25
535.00
770.00
570.00
10,000
1,043,25
985.00
1,250.00
1,100.00
u
- 10 -
u
SCHEDULE 6
CITY OF
PALM BEACH GARDENS
NATURAL GAS DISTRIBUTION SYSTEM
COST ESTIMATE AND REQUIRED INVESTMENT
($�
Construction
Period
1961
1962
1963
City Gate
3,500
Mains
48,400
19,890
17,465
29,020
Services
1,160
9,685
11,185
18,580
Meters
1,500
5,360
5,830
9,890
Regulating Equipment
4,000
2,000
Sub -Total
54,560
38,935
34,480
59,490
Contingencies (10 %)
5,500
3,900
3,500
6,000
Engineering and
Supervision (10 %)
6,000
4,200
4,000
6,510
TOTAL CONSTRUCTION
66,060
47,035
41,980
72,000
Tools and Work Equipment
2,000
2,500
Office Furniture and
Fixtures
1,940
1,465
520
Sub -Total
70,000
51,000
42,500
72,000
Escrowed Interest
6,400
9,000
13,200
TOTAL FUNDS REQUIRED
70,000
57,400
51,500
85,200
ACCUMULATED
70,000
127,400
178,900
264,100
11 -
U
(1) Interest estimated @ 5 per cent.
First three years` interest to be borrowed and included in the debt.
- 12 -
SCHEDULE 7
CITYiOF
PALM BEACH GARDENS
SCHEDULE OF
DEBT SERVICE REQUIREMENTS
Principal
Plus
Year
Debt
Interest(')
Principal
Interest
1.
1961
$ 1,27,400
$ 6,400
$
$ 6,400
2,
1962
178,900
9,000
9,000
3.
1963
264,100
13,200
8,300
21,500
4.
1964
255,800
12,800
8,700
21,500
5.
1965
247,100
12,400
9,100
21,500
6.
1966
238,000
11,900
9,600
21,500
7.
1967
228,400
11,400
10,100
21,500
8.
1968
218,300
10,900
10,600
21,500
9.
1969
207,704
10,400
11,100
21,500
10.
1970
196,600
9,900
11,600
21,500
11.
1971
185,000
9,300
12,200
21,500
12.
1972
172,800
8,600
12,900
21,500
13.
1973
159,904
8,000
13,500
21,500
14.
1974
146,400
7,300
14,200
21,500
15.
1975
132,200
6,600
14,900
21,500
16.
1976
117,300
5,900
15,600
21,500
17.
1977
101,700
5,100
16,400
21,500
18.
1978
85,300
4,300
17,200
21,500
19.
1979
68,100
3,400
18,100
21,500
20.
1980
50,000
2,500
19,000
21,500
21.
1981
31,000
1,600
19,900
21,500
22.
1982
11710(
600
11,100
11,700
TOTAL
171,500
264,100
435,600
U
(1) Interest estimated @ 5 per cent.
First three years` interest to be borrowed and included in the debt.
- 12 -
1W
SCHEDULE 8
CITYIOF PALM BEACH GARDENS
DEBT COVERAGE RATIO
I. Based on 5.5 cents per Therm Gas Cost:
Total Net Revenue ($) 713,212 = 1.64
Total Debt Service Requirements ($)
II. Based on 5.9 cents per Therm Gas Cost:
Total Net Revenue ($) 673?251 _ 1.55
Total Debt Service Requirements ($) 435,600
- 13 -