HomeMy WebLinkAboutDRC - 100506 - PUD 06-09-11 Sunoco Gas StationDevelopment Review Committee Meeting
Petition PPUD- 06 -09 -11
Sunoco Gas Station
October 5, 2006
Present at Meeting
Todd Miller, Principal Planner
Judy Dye, LBFH City Engineering
James Brown, City Building Department
Officer Jules Barone, City Police Department
Scott Fetterman, City Fire Rescue
Kevin McGinley, Land Research Management, Inc.
Richard Wensing, Richard Wensing Architects & Planners, PA
Thomas A. Vani, S &S Enterprises, Inc.
The meeting took place in the Council Chambers of the City of Palm Beach Gardens on Thursday,
October 5, 2006 and started at 11:11 a.m.
Purpose of the Meeting
This Development Review Committee was held at the request of Mr. Kevin McGinley, Land
Research Management, Inc. on behalf Of S &S Rentals, Inc. to rezone a 0.8 acre parcel at the
corner of PGA Boulevard and Prosperity Farms Road from Commercial General 1 (CG 1) to
Planned Unit Development (PUD) to allow for the redevelopment of an existing gas
station/convenience store. Currently the subject property is operated as a "Speedway" gas station.
Todd Miller distributed a package to those in attendance with comments for discussion. Comments
and discussion followed on topics listed.
Memo from Todd M. Miller, 10/4/2006, Re: Development Plans — Site Plan
All site lighting shall be in compliance with Section 78 -182 of the City Code, entitled
"Illumination of uses and buildings ", as amended by Ordinance 26 -06. Messrs. McGinley,
Wensing and Vani assured staff that the lighting would be per their requirements.
Memo from James Brown, 10/3/2006, Re: General Comments
James Brown re- stated his comments from subject memo that separate permit(s) and application(s)
would be required for paving, drainage, water and sewer improvements, common area
landscaping, common area irrigation, common area site lighting, signage, fire sprinklers and fire
alarms (if any). Applicants agreed that permits, applications and inspections would be done as
required.
Comments from Scott Fetterman, Deputy Chief Fire Rescue
Scott Fetterman discussed his concern that the site plan did not indicate an emergency generator
location and asked how the applicants proposed to meet the requirements of new State Legislation
requiring that emergency generators be available to gasoline stations. Mr. Thomas Vani, the
owners representative, stated they will have a portable generator fueled by on -site diesel. Mr.
Richard Wensing stated the generator would have a transfer switch and that he will have it
identified on the site plan and submitted to the City.
DRC Review Meeting Date: 100506 Page 1
Sunoco Gas Station
Memo from Bruce Gregg, Director of Operations SEACOAST UTILITY AUTHORITY,
dated September 27, 2006
Judy Dye and Todd Miller discussed this memo with the applicants regarding Seacoast's concern
that the site plan and landscape plans need to clearly depict the proposed water meter, backflow
preventer, and water service line. The applicant assured staff that the site plan would address these
concerns.
Memorandum from City Police Department Special Operations Bureau, Officer Jules
Barone — Convenience Store /Gas Station Needs and Miscellaneous Comments
Officer Barone discussed these comments with the applicants, expressly commenting that they
would need a waiver for the lighting and that the lighting needed to be upgraded in the back,
noting the State requirements for safety. Richard Wensing stated they would do as Officer Barone
requested and Thomas Vani said they would also have wall packs installed. Mr. Vani said this was
going to be a raze and rebuild project and the floor plans had been re -done per Sunoco
specifications. Officer Barone asked if security would be provided as required by the City, the
applicants assured him security requirements would be fulfilled as required including fencing and
screening. Mr. Vani will coordinate pricing the fencing and screening. Judy Dye will coordinate
with the Code Enforcement Department regarding signage as mandated by the City.
LBFH Inc, memorandum dated September 27, 2006 from Judy Dye
This memorandum covered the Engineering Department comments including certification issues,
non - certification issues, and conditions of approval. Judy Dye told applicants she needed
clarification regarding a Boundary and Topographic Survey. Kevin McGinley stated he would see
that the requested survey was provided.
Judy Dye revised Item #4 of the memo to read "handicapped sign" rather than "stop sign ". Item #5
referring to cross access was discussed. Kevin McGinley asked if there was an easement. Thomas
Vani said he would get with the property owner to find out for sure. Items #6 and #7 regarding a
Drainage Statement and Site Electrical /Photometric Plan have already been provided to the City as
requested. Todd Miller responded to Item #8 about revising the Waiver Justification Statement to
reflect the current City Land Development Regulations (LDR). Mr. Miller will e -mail the code to
Messrs. McGinley, Wensing and Vani. They will check to assure they are in agreement with
Sunoco, they will adjust if need be to meet the code and will coordinate with Officer Barone. The
remainder of items #9, #10 and #11 regarding LDR requirements are all Council granted waivers
and not to be settled at this meeting.
Judy Dye asked for a draft letter on the date of the Development Order (DO). Mr. Vani will have it
drafted and comply. Judy Dye will confirm the language and notify Mr. Vani. Mr. McGinley
stating that it will contain the standard County conveyance language. Judy Dye told the applicants
that their County contact is Tony Miller.
Todd Miller stated he wanted to keep a good schedule and he will e -mail a schedule. Mr. Vani
stated they are "under the gun" from Sunoco to have permit by the end of the year. Judy Dye asked
if a courtesy review would help. She commented that everything should be run concurrently.
James Brown agreed that construction, building plans, site review and development order should
be run concurrently to meet the first meeting of Planning Zoning Appeals Board (PZAB) in
November, so they could present to Council in December for 1St and 2nd readings in a timely
DRC Review Meeting Date: 100506 Page 2
Sunoco Gas Station
Scott Fetterman asked applicants what they needed for environment. Mr. Vani stated they were
doing it now, and were working on a closure report. Kevin McGinley stated a Plan of what has to
be done needs to be done now so Scott Fetterman can stamp and sign off in order to meet what
City Engineering needs. Mr. Vani stated he would be in contact with Engineering by October 6
2006, with planning update.
With no further items to discuss, the meeting was adjourned at 11:50 a.m.
Submitted by:
�- % T 6'3D N`1 clef l6
-Rc'-� a, Tuesd Craig
Municipal Services Coordinator
DRC Review Meeting Date: 100506 Page 3
Sunoco Gas Station
CITY OF PALM BEACH GARDENS
MEMORANDUM
TO: Judy Dye (w /attachments)
Doug Wise (w /attachments)
Mark Hendrickson (w /attachments)
Julius Barone (w /attachments)
Scott Fetterman (w /attachments)
Bruce Gregg (w /attachments)
Mike Morrow
Layle Knox
Christine P. Tatum
DATE: September 21, 2oo6
FROM: Todd Miller, Principal Planner ;
Jack Doughney
Alan Boaz
Kelvin Wise
Charlotte Presensky
Rick Kania
Todd Engle
Angela Wong
Mike Kelly
SUBJECT: Development Review Committee Meeting
MEETING DATE: k
A Development Review Committee meeting will be held on Thursday, October 5, 2oo6
at ii:oo am., in the Growth Management Department conference room to review the
following development application:
Petition PPUD- o6- o9 -il: A request from Mr. Kevin McGinley Land Research
Management, Inc., on behalf of S&S Rentals, LLC to rezone an o.8 acre parcel at the corner
of PGA Boulevard and Prosperity Farms, Road from Commercial General i (CG1) to Planned
Unit Development (PUD) to allow for the . redevelopment of an existing gas
station /convenience store. Currently the subject property is operated as a "Speedway" gas
station. Please note that this application was previously approved by the City in
April of 20oi, but permits were not issued by the established build -out date,
causing the Development Order to expire. Other than a few changes to the
landscape plan, the previously approved plans remain relatively unchanged.
The applicant will be in attendance at this meeting. Our office requests your participation in
the review of this project. Please review this request` and attend the meeting if- possible,
bringing written comments. If you cannot attend, please forward any, comments or
outstanding issues relative to the subject petition to our office. Should you, have no
comments, please indicate so next to your name below and forward this _memo to our office.
Application materials and plans for review are available in the . Growth. Management
Department.
Thank you for your ongoing cooperation and assistance. Please contact our office at 799-
4236 should you have any questions.
Doug Wise, Building Official
Julius Barone, Police
Scott Fetterman; Fire Marshall
.Mike Kelly, Parks Director
Charlotte Presensky, Recreation Director
Mark Hendrickson, City Forester
Judy Dye, LBFH , s.
Layle Knox, NPBCID
Rick Kania, Waste Management
Tonya Deal, PBC School Board
Bruce Gregg, Seacoast Utilities
Mike Morrow, Public Works
'Jack Doughney, Com. Serv. Administrator
Kelvin Wise, Code Enforcement Supervisor
Christine P. Tatum, City Attorney
Alan Boaz, Florida Power & Light
` J
_Angela Wong, Operations Manager
Todd Engle, Director of Const. Services'
Attachment: Development Plans
c: Kara Irwin, Growth Management Administrator
Stephen Stepp, Police Chief
Patricia Snider, City Clerk
Nancy E. Stroud, Assistant City Attorney
Page 2 of 2
CITY OF PALM BEACH GARDENS
MEMORANDUM '
Memo to File
From: Todd M. Miller, Growth Management Department
Date: October 4, 2oo6
Re: DRC Comments — PPUD o6- og- 0000ll: Sunoco Gas Station:
Requesting rezoning from. CG -1 to PUD to allow for the redevelopment of
an existing gas station/ convenience. store.
Cc: Talal Benothman, Planning Manager
File
I have reviewed the above - referenced project -and have the following comments :`
Development Plans
Site Plan
1. All site lighting shall be in compliance with Section 78 -182 of the City
Code, entitled "Illumination of uses and buildings ", as amended by
Ordinance 26 -o6.
Memorandum - 'Page 1 of .1
..Todd Miller
From: James Brown
Sent: Tuesday, October 03, 2006 10:33 AM
To: Todd Miller
Subject: Petition PPUD- 06 -09 -11
Attachments: image001.png
•
tSUILUINU UIVIZIsuro
10500 N. MILITARY TRAIL • PALM BEACH (.
(561) 799 - 4201
To: Todd Miller
From: James Brown
Regarding: Petition PUD- 06 -09 -11
Date: October 3, 2006
Based upon a review of the submitted documents.we have the following certification_
comments:
1. No certification comments
The following general comments affect this project, should be duly noted by the applicant:
1. Separate permit(s) and application(s) will be required for: paving, drainage, water and.
sewer improvements, common area landscaping, common area'.irrigation,,common area
site lighting, signage, fire sprinklers and fire alarms (if any).
Please feel free to contact me at extension 42691if l.may assist you further in this or any other,
matter.
MEMORANDUM
TO: Todd Miller, Principal Planner DATE: October 2, 2006
APPROVED:
FROM: Scott Fetterman, Deputy Chief
RE: PPUD- 06 -09 -11
Fire Rescue has reviewed the above referenced PUD petition and has the
following comment and concern:
• The site plan does not indicate an emergency generator location.
How does the applicant propose to meet the requirements of new
state legislation requiring that emergency generators be available
to gasoline stations?
Thank you for your assistance and consideration in this matter. Please
contact me if you have any questions or any future changes are proposed.
September 27, 2006
Mr. Todd M. Miller
Planning & Zoning Division
City of Palm Beach Gardens
10400 North Military Trail
Palm Beach Gardens, FL 33410
RE: Sunoco Station — PGA Boulevard and Prosperity Farms Road
Dear Mr. Miller:
We offer the following comment on your transmittal September 21, 2006 concerning the
referenced project. The applicant needs to revise the site plan and landscape plans to clearly
depict the proposed water meter, backflow preventer, and water service line. It appears that the
proposed landscaping may conflict with these facilities.
Please call if you require additional information.
Sincerely,
SEACOAST UTILITY AUTHORITY
Bruce Gregg
Director of Operations
dp
cc: R. Bishop
J. Callaghan
J. Dye
J. Lance
d
-7
PALM BEACH GARDENS POLICE DEPARTMENT
a
SPECIAL OPERATIONS BUREAU
INTEROFFICE MEMORANDUM
TO: TODD MILLER, PRINCIPAL PLANNER
FROM: OFFICER JULES BARONE
SUBJECT: PPUD- 06- 09 -11- SPEEDWAY GAS STATION (PGAIPROSPERITY FARMS)
DATE: SEPTEMBER 22, 2006
Comments:
Convenience Stores /Gas Stations Needs
1. Lighting locations shall not conflict with landscaping (to include longterm, tree canopy growth).
2. Lighting on building shall be around perimeter of all sides and on pedestrian walkways surrounding
the building.
3. Have adequate lighting within and outside the establishment to make the store less appealing to a
potential robber by making detection more likely.
4. The parking lot / gas pump area of the store shall be well lit during nighttime hours of operation.
5. Metal Halide lighting shall be used for parking lot and pedestrian walkways.
6. Landscaping should not obstruct view of windows and walkways so employees and patrons are able
to see their surroundings.
7. Install convex mirrors and keep signs and shelves'low; where they don't obstruct employee view.
8. Install a drop safe. Have signage indicating that little cash is kept on hand.
9. Install video surveillance equipment and closed circuit TV (CCTV) to deter robberies by increasing
the risk of identification.
10. Install silent alarms to notify police in the event of a problem.
11. Lock doors not in use.
12. Limit access into the store during late night hours by installing bullet- resistant enclosures with pass -
through windows.
13. Put height markers on exit doors to help witnesses provide more complete descriptions of assailants.
14. Use door detectors to alert employees when persons enter the store.
15. Control access to the store with door buzzers for nighttime use or closing hours.
16. Bathrooms should be located in a conspicuous location where there will be a high volume of
pedestrian traffic. Additionally, bathroom doors should be eliminated and replaced with what has
been termed as a "maze" entry/exit. Having this design allows for quick escape in and emergency
situation, a roll down shutter can be used to secure the bathrooms during closing hours.
17. Telephone kiosks should be placed in convenient and conspicuous locations, but not in close
proximity to businesses. Many times having a telephone kiosk close to businesses provides a
legitimate location to conduct illegitimate activity. By having telephone kiosks away from businesses
it will help to prevent and / or eliminate potential illegitimate activity.
18. Cashier station area shall be centrally located or rear of the store for good visibility. For enhanced
natural surveillance front glazing should be free of signs. Shelf orientation should not prevent clerks
from observing customers.
19. If location is to have an eating area it should be located at the front of the store utilizing small seat
and table design to attract adult customers.
Miscellaneous:
1. Any storage areas with exterior roll up doors should be target hardened (IE: Secured locks,
connected to alarm system).
2. Place fuel tanks and fuel pumps in an isolated area of the parking lot away from buildings and flow
of parking lot traffic.
3. Fuel tanks and fuels pumps should be secured areas (not easily accessible).
CC: Chief S. Stepp
Files
2.
CONSULTING CIVIL ENGINEERS,
SURVEYORS & MAPPERS
CIVIL
AGRICULTURAL
WATER RESOURCES
WATER & WASTEWATER
TRANSPORTATION
SURVEY & MAPPING
GIS
"Partners For Results
Value By Design"
3550 S.W. Corporate Pkwy.
Palm City, FL 34990
(772) 286 -3883
Fax (772) 286 -3925
www.lbfh.com
MEMORAN1, UM
TO:
Todd Miller
FROM:
Judy A. T. Dye
DATE:
September 27, 2006
FILE NO.
06 -4474
SUBJECT: Sunoco at PGA Boulevard and Prosperity Farms Road
(PPUD -06 -09- 000011)
We have reviewed the following plans and information for the above referenced
project received September 22, 2006:
• City of Palm Beach Gardens distribution memorandum.
• Development Application and supporting documents prepared by Land
Management Research Management, Inc.
• Justification Statement — Rezoning and Site Plan Approval.
• Justification Statement — Waiver Requests.
• Copy of Palm Beach County Traffic Division letter dated March 6, 2006.
• Environmental Assessment.
• Drainage Statement prepared by Simmons & White, Inc.
• Water Management Calculations prepared by Simmons & White, Inc.
• Site Plan (Sheet A0.1) prepared by Richard Wensing Architects and Planners, PA.
• Landscape Plans (Sheets. LP -1 and LP -2) prepared by Jon E. Schmidt -and
Associates, Inc.
• Floor Plan and Details (Sheets A -1 to A -4A and A -10) prepared by Richard
Wensing Architects and Planners, PA.
• Site Electrical/Photometric Plan prepared by- Richard Wensing Architects and
Planners, PA and Coburn and'Associates, Inc.
• Boundary Survey prepared by Wallace Surveying.
• Site Development Plans (Sheets l — 4 of 6) prepared by Simmons & White, Inc.
We have the following comments: .
Certification Issues
1. The applicant shall provide a Boundary and Topographic Survey identifying
existing contours at one -foot intervals extending .100 feet beyond the parcel
boundaries in accordance with LDR Section 78 -46. .
2. In accordance with LDR Section 78- 371, the applicant shall add the following note
to the site plan and engineering plans, "All handicap accessible ramps shall meet
all applicable local, regional, state, and federal accessibility guidelines and
regulations. Any modification shall be approved by the engineer -of- record."
3. The applicant shall ,revise the Site Plan (Sheet A0.1) to identify the wheel stops
consistent with the Landscape Plans and Paving and Drainage Plans, and in
accordance with LDR Section 78- 344(e).
\ \pbgsfile \Growth Management \Planning_and_Zoning \tmiller \Case Files \Sunoco.Station \LBFH
Sunoco ,cation (PGA Blvd. and Prosperity Farms Rd.) ( Page 2 of 6
LBFH File No. 06 -4474
4. The applicant shall revise the location of the stop sign shown at the northeast
corner of the proposed building. The proposed stop sign shall be place outside of
the five -foot sidewalk.
The applicant shall clarify on all plans if cross access to /from Prosperity Center
will be provided along the east property boundary. Additionally, we suggest the
applicant provide a stop sign and stop bar for the ingress from Prosperity Center
into the Sunoco site.
6. The applicant shall revise the Drainage Statement to specify that the parking lots
and driveways will be protected from the 5-year/1-day storm event consistent with
LDR Section 78 -523.
' The applicant shall provide a Site Electrical /Photometric Plan signed and sealed by
a professional engineering licensed in the state of Florida in accordance with LDR
Section 78 -46.
The applicant shall coordinate with City staff and revise the Waiver Justification
Statement to reflect the current City of Palm Beach Gardens Land Development
Regulations (LDR). i
ft
The applicant shall revise the Site Electrical /Photometric Plan to eliminate the
footcandle values greater than` 100 for consistency with the previously approved
plans and consistent with Ordinance 6, 2001. The applicant has requested a waiver
from Section 95(e) of the Zoning Code however, the applicant shall revise the
waiver request to identify the correct code, LDR Section 78 -182. Please note we
remain in support of the City's LDR requirements.
10. The applicant has requested a waiver from Section .185(A) of the Zoning Code
which requires loading spaces however, the applicant shall revise the wavier
request to identify the correct code, LDR Section 78 -362. The applicant has
provided a justification statement for this waiver indicating the cross - access point
with the property to the east prohibits the placement of-a designated loading space.
The applicant further explains the area adjacent to the dumpster can serve as an
adequate loading area without interfering with parking and circulations. Please note
we remain in support of the City's LDR requirements. .
11. The applicant has requested a waiver from Section 179(h) of the Zoning Code
which requires a minimum 100 feet of off street stacking distance however, the
applicant shall revise the waiver request to identify the correct code, LDR Section
78- 344(h). The applicant has provided a justification statement for this waiver
indicating the proposed redevelopment is significantly more conforming to code
than the existing development and that stacking cannot be met due to the limited
size of the parcel. Please note we remain in support -of the City's LDR
requirements.
\ \pbgsfile \Growth Management \Planning_and_Zoning \tmiller \Case Files \Sunoco Station \LBFH
Sunoco cation (PGA Blvd. and Prosperity Farms Rd.) Page 3 of 6
LBFH File No. 06 -4474
Non - Certification Issues
NOTE: All engineering /infrastructure plans are considered conceptual during the
planning and zoning review phase and are subject to further review during the final
construction review. These non - certification comments shall be satisfied prior to
construction plan approval and the issuance of the first land alteration permit_
1. The applicant shall revise the plans to indicate reinforced concrete pipe (RCP) for
drainage pipes under all load bearing pavement areas. The drainage pipe shown at
the northeast corner and the southwest corner of the site are identified as PVC on
the Paving and Drainage Plans.
2. The applicant shall revise the Water Management Calculations to justify the soil
storage as a function of the season high water table.
3. The applicant shall revise the Water Management Calculations for the "Existing
Discharge to SR 786" The applicant shall consider using the Santa Barbara Unit
Hydrograph method consistent with the post - development analysis submitted.
4. The applicant shall justify the stage /storage data shown in the surface water
management (SWM) model.
5. The applicant shall justify the Tail Water assumption represented in the Water
Management Calculations.
6. The applicant shall provide bleeder sizing calculations justifying the 0.667 -foot
bleeder identified in the Water Management Calculations.
7. The applicant shall revise the weir coefficient identified in the SWM model from
0.6 to a value more consistent with a sharp- crested weir.
8. The applicant shall revise the invert elevation of the bleeder identified in the SWM.
model (elevation = 3.0 -feet) and Paving and Drainage Plan (elevation = 3.5 -feet)
for consistency.
12. Prior to the issuance of the first land alteration permit, the applicant shall.provide a
copy of the following approved permits, as applicable:
a. SFWMD
b. NPBCID
C. PBC
d. FDOT
e. PBC Health Department /FDEP
f. NPDES
9. The applicant shall provide a cost estimate for the project, including public
infrastructure and all landscaping and irrigation costs for review and approval by
the City in order to establish surety. The cost estimate shall be signed and sealed by
an engineer and landscape architect registered in the state of Florida. Surety will be
\ \pbgsfile\ Growth_ Management \Planning_and_Zoning \tmiller \Case Files \Sunoco Station \LBFH
rnmMP."k
Sunoco .,cation (PGA Blvd. and Prosperity Farms Rd.) ( Page 4 of 6
LBFH File No. 06 -4474
based on 110 % of the total combined approved cost estimates and shall be posted
with the City, prior to the issuance of the first land alteration permit.
SUMMARY OF ENGINEER'S ESTIMATE
of Probable Construction Costs
for On -site and Off -site Public Improvements
Grading _
$
Sanitary Sewer
$
Water
$
Storm Water Maintenance
$
Subtotal
$
Landscaping
$
Irrigation
$
Subtotal
Is
otal
Is
110 %Total Required Surety
Is
10. The applicant shall provide a cost estimate for the on -site project improvements,
not including public infrastructure, landscaping and irrigation costs (which were
previously submitted by the applicant): for review and approval by the City. The
cost estimate shall be signed and sealed by an engineer and shall be posted with the
City prior to the issuance of the first land alteration permit.
SUMMARY OF ENGINEER'S ESTIMATE
of Probable Construction Costs
for On -site Non Public Improvements
Grading
$
Sanitary Sewer
$
Water
$
Storm Water Maintenance
$
Total
Is
11. The applicant shall indicate the structural numbers for the asphalt pavement areas
in accordance with LDR Section 78 -499, Table 41. The applicant shall provide a
table indicating the layer, materials, LBR.FBV, material thickness, FDOT layer
coefficient; the SN for the pavement section, base section, and subgrade section;
and the total SN for the total pavement'section and the required SN in accordance
with the FDOT Flexible Design Manual.
\ \pbgsfile\ Growth_ Management \Planning_and_Zoning \tmiller \Case Files \Sunoco Station \LBFH
Comments
Sunoco — cation (PGA Blvd. and Prosperity Farms Rd.) Page 5 of 6
LBFH File No. 06 -4474
Conditions of Approval
"Applicant shall copy to the City all permit applications, permits, certifications
and approvals. " (City Engineer)
2. "Applicant shall provide all necessary construction zone signage and fencing as
required by the City Engineer. " (City Engineer)
"Prior to issuance of the first land alteration permit, the applicant shall prepare a
plat, which shall be approved by the City and recorded. " (City Engineer)
4. "Prior to construction plan approval and the issuance of the first land alteration
permit, applicant shall provide cost estimates in accordance with LDR Section 78-
309 and 78 -461 and for on -site project improvements, not including public
infrastructure, or landscaping and irrigation costs for review and approval by the
City. The cost estimates shall be signed and sealed by an engineer and landscape
architect registered in the state of Florida and shall be posted with the City, prior
to the issuance of the first land alteration permit. " (City Engineer)
"The construction, operation and /or maintenance of any elements of the subject
project shall not have any negative impacts on the existing drainage of
surrounding areas. If, at any time during the project development, it is determined
by the City that any of the surrounding areas are experiencing negative drainage
impacts caused by the project, it shall be the applicant's responsibility to cure said
impacts in a period of time and a manner acceptable to the City prior to additional
construction activities. " (City Engineer)
"Prior to issuance of the first land alteration permit, applicant shall submit
signed /sealed /dated construction plans (paving /grading /drainage and water /sewer)
and all pertinent calculations for review and comment. (City Engineer)
7. "Applicant shall comply with any and all Palm Beach County Traffic Division
conditions as outlined in PBC . Traffic Division equivalency and concurrency
approval letters. " (City Engineer)
\ \pbgsf le\ Growth_ Management \Planning_and_Zoning \tmiller \Case Files \Sunoco Station \LBFH
3 Sunoci, Nation (PGA Blvd. and Prosperity Farms Rd.) Page 6 of 6
LBFH File No. 06 -4474
"Prior to construction plan approval and the issuance of the first land alteration
permit, applicant shall schedule a pre permit meeting with City staff. " (City
Engineer)
9. "Prior to the issuance of the first land alteration permit the applicant shall provide
to the City letters of authorization from the applicable utility companies allowing
landscaping and light poles to be placed within the utility easements. " (City
Engineer)
10. "In accordance with LDR Section 78- 441(c) the applicant shall prepare and
submit a boundary plat for subject site for review and approval by the City. The
boundary plat shall be approved by the City Council and placed in the- Official
Records of Palm Beach County prior to the issuance of the first land alteration
permit for the subject property. (City Engineer)
11. "Applicant shall note the City's Public Works Division at least 10 working days
prior to the commencement of any work/construction activity within any public
right -of -way within the City of Palm Beach Gardens. In the case of a city right -of-
way, the applicant has at least five working days to obtain a right -of -way permit.
Right-of-way permits may be obtained at the Building Division. Failure to comply
with this condition could result in a Stop Work Order of all work/construction
activity within the public right -of -way and the subject development site. " (Public
Works)
The applicant is requested to return a copy of our comments with the applicant's
acknowledgement of each comment and the response. Compliance will expedite
the subsequent review.
JATD /ph
cc: Kara Irwin — Palm Beach Gardens (kirwingpb flg_com)
Kevin McGinley — Land Research Management, Inc. (lrmigbellsouth.net)
\ \pbgsfile\ Growth_ Management \Planning_and_Zoning \tmiller \Case Files \Sunoco Station\LBFH
s
Development Review Committee
Sunoco Gas Station
SIGN IN SHEET
NAME
L
1.
Ae-,P',
5 +�,�u�a2D �t���rN� ✓'
6.
ORGANIZATION %.
TEL. #
;1� ]UCH
[IQA
7,9 S . y3OO
6 % 248(
7.
i SD�y CRAiG' me
8.
1
;%rte --1 er1 Iro,.,� yt i.%�- �G�� /� '7��.— �/ot
10.
LAND USE PLANNING & ZONING
ffkml MARKET RESEARCH & ANALYSIS
ENVIRONMENTAL ASSESSMENTS
KEVIN McGINLEY .
President
LAND RESEARCH MANAGEMENT, INC.
2240 Palm Beach Lakes Blvd., Suite 103
West Palm Beach, FL 33409 (561) 686 -2481
LRMIQbellsouth.net FAX 681 -1551
Ricki d Wensing AIR
Richard Wensing Rkhitdds Planners, PR
Northpolnt Buslness plaza 901 Noithpolnt Porkwoy `• Sulte' 109'
j Weit Palm Beach; Florida 33407 eZ61. 6841988 fex 561.684.1990
RR CO0218
i
Thomas A. Vani
President
1p.. E -mail: tomv qss -fl.COM
ENTERPRISES, INC.
400.High Point Drive, Suite 500 • Cocoa, Florida 32926
Telephone: 321 /636 -0200 • Fax: 321/636 -8406
Centry 21 Baytree Realty • S SC S Petroleum, Inc. • S & S Rentals, LLC
S & S Express Car Rental, Inc. • Alamanda Key, LLC
a