Loading...
HomeMy WebLinkAboutAgenda P&Z 082807.August 28, 2007 Randolph Hansen Dennis SoComon Craig XunkCe NichaeCPanczak Douglas PenneCC Barry Present Jonathan D. Rubins Joy Hecht (is, Aft.) -Amir XaneC(z^`` Aa.) CITY OF PALM BEACH GARDENS 10500 N. MILTARY TRAIL • PALM BEACH GARDENS, FLORIDA 33410 -4698 MEMORANDUM DATE: August 28, 2007 TO: Planning, Zoning and Appeals Board Members FROM: Growth Management Department SUBJECT: Planning, Zoning and Appeals Board Meeting Tuesday, August 28, 2007 - 6:30 P.M. Enclosed is the agenda containing the items to be presented on Tuesday, August 28, 2007. This meeting will be held in the Council Chambers, Palm Beach Gardens Municipal Building, 10500 North Military Trail, beginning at 6:30 p.m. Enclosed with this memorandum are the following items: • 1. An agenda for the meeting; and 2. A compact disc containing PowerPoint presentations 3. A Growth Management Department staff report for the items to be heard. As always, the respective Project Managers' telephone numbers and e-mail addresses have been provided in case you have any questions or require additional information on any petition. This will help us offer better staff support in the review of these applications. Nina Sorenson, Administrative Specialist II, will call to confirm your attendance. Kara L. Irwin, AICP Growth Management Administrator �J is • CITY OF PALM BEACH GARDENS PLANNING, ZONING, AND APPEALS BOARD Agenda Cover Memorandum Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA- 07 -03- 000005 Subject/Agenda Item: Petition PUDA- 07 -03- 000005: Waterford/Wyndham Garden Hotel Planned Unit Development (PUD) Amendment Public Hearing & Recommendation to City Council: A request by Cotleur & Hearing, Inc., on behalf of Pinnacle Hospitality, Inc., to amend the Waterford/Wyndham Garden Hotel PUD to allow a structural addition between two existing buildings to provide a new entry, central lobby, and drop -off area; eliminate suites in order to increase the number of hotel rooms from 77 to the 90 previously approved; eliminate a public restaurant; add an exit at the north end of the site; add architectural enhancements to existing building; and provide a courtyard garden. The 1.85 -acre parcel is located on the east side of U.S. Highway 1, approximately one -tenth of a mile south of PGA Boulevard. [ X ] Recommendation to APPROVE with one additional waiver [ ] Recommendation to DENY Reviewed by: Originating Dept.: Finance: Planning & Zoning City Attorney: Growth Management N/A Action: Allan Owens Project [ ] Approved Manage . Jackie Holl an, AICP Administrator [ ] App. w/ conditions [ ] Denied Christine P. Tatum, Esq. Development Compliance: Planner ount ant: ] Rec. approval 961) ftc ] Rec. app. w/ conds. [X] Quasi — Judicial [ ] Rec. Denial Ketty Labos ere Bahareh Wolfs, AICP [ ] Legislative Fees Paid: [ X ] Yes [ ) Continued to: Principal P nner: [X] Public Hearing Advertised: [ X ] Required Attachments: • Applicant Narrative Todd Miller, AICP Date: Aug. 17, 2007 • Location Map Growtf nagement Admintor: Paper: Palm Beach Post • DRC Comments • Reduced Plans Property Posted w /Sign: Date: Aug. 13, 2007 • Ordinance 13, 2005 • Resolution 44, 2005 • Ordinance 14, 1996 Kara Irwin, AICP Approved By: City Manager: • Ordinance 18, 1992 Affected parties: [X] Notified 8/17/07 • Ordinance 53, 1988 [ ] Not Required Ronald M. Ferris • EXECUTIVE SUMMARY • Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA- 07 -03- 000005 The subject petition is a request to allow the expansion of the 77 -room Waterford Hotel by adding a new 2,436 square -foot lobby structure that will connect two existing buildings. The proposed structure will include a covered drop -off area with a bypass lane. Thirteen suites will be converted back to single rooms, which will increase the number of rooms to 90, as originally approved. The existing restaurant will change from public use to a breakfast bar and lounge area for hotel guests. Also included are facade improvements to the existing buildings, minor site plan improvements, and a new landscaped courtyard adjacent to the new lobby. In addition, a new exit will be added on the north side of the site for emergency purposes. Four waivers were previously approved through the adoption of Resolution 44, 2005. With this petition, the applicant is requesting one additional waiver to reduce the size of the loading zone area. Staff recommends approval with conditions and one additional waiver to reduce the size of a loading zone. BACKGROUND On February 16, 1988, the City Council adopted Ordinance 53, 1988 approving the four- story Garden Suites Hotel PUD with a total of 90 rooms. On February 21, 1991, the City Council approved Resolution 22, 1991, which allowed an additional building sign for the hotel. On August 6, 1992, the City Council adopted Ordinance 18, 1992, which allowed the construction of a swimming pool facility. Ordinance 14, 1996 approved an amendment that permitted the demolition of a bank on the property, and approved construction of a 7,507 square -foot two -story ancillary building with an underground parking garage. The uses permitted in the ancillary building included meeting space, professional office, and a continental breakfast service for hotel guests. On May 5, 2005, the City Council adopted Ordinance 13, 2005, which amended Ordinance 53, 1988, Ordinance 18, 1992, and Ordinance 14, 1996, and also transferred the site plan and related conditions to Resolution 44, 2005. This resolution approved, in part, the restaurant use and allowed 13 suites, which reduced the number of hotel rooms from 90 to 77. Previously, outdoor seating and outdoor musical entertainment associated with the public restaurant had been a concern of the Twelve Oaks residential community located immediately east of the site within unincorporated Palm Beach County. Three conditions prohibiting these activities were included in Resolution 44, 2005, and are proposed to remain in effect. 2 Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA- 07 -03- 000005 • LAND USE & ZONING The subject site has a future land -use designation of Commercial (C), and it is zoned Planned Unit Development (PUD) Overlay with an underlying zoning of General Commercial (CG -1). Please see Table 1 for adjacent property uses and zoning designations. CONCURRENCY Traffic The Palm Beach County Traffic Division has reviewed the traffic statement for the proposed modifications to the hotel and has determined that these changes do not have a significant impact on the adjacent roadway network. This County traffic concurrency approval is contingent on a build -out date of December 31, 2008. Drainaqe A drainage statement from the applicant indicates that the surface water storage remains the same for all areas of the site, except the proposed building addition and the proposed landscape courtyard area. The overall pervious /impervious areas are consistent, and the storage volumes for the proposed site development exceed that • which currently exists on the site. • PROJECT DETAILS Access The subject site currently has a two -way driveway for ingress and egress to the site. A second exit for emergency vehicles is proposed at the north end of the site. Because of the addition of the lobby structure, minor vehicle area modifications are proposed. Parking As required by Section 78 -345, 1.1 parking spaces are required per hotel room, for a total of 99 required parking spaces. The required parking spaces have been provided, with 86 spaces being aboveground and 14 spaces in the underground parking area. An additional four handicap parking spaces have been provided aboveground on the east side of the site. The existing multi - purpose area is utilized as storage, an exercise room, and as a gathering space for patrons staying at the hotel, for which no parking is required. The space that was previously used as a public restaurant is proposed to be used only as a breakfast bar and lounge area for hotel guests. Thus, no additional parking is required for this space. 3 Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA- 07 -03- 000005 . Landscaping A landscape plan has been provided that utilizes both existing and new landscaping materials consisting of ornamental trees, palms, large and medium shrubs and accent plants, vines, and groundcovers. In order to accommodate the site modifications, some existing trees and other landscape materials will be relocated to other areas on site. Additional landscape materials are being added, which will supplement the existing plantings within the buffers and along the building foundations. A new landscaped courtyard east of the proposed lobby building will consist of 2' x 2' square pavers with 6" sod between the pavers. A new fountain and an 8 -foot wall will provide privacy at the east end of the courtyard. In addition, a landscaped buffer and a 6 -foot high privacy wall already exist along the east property line, which provide visual and sound barriers between the site and the Twelve Oaks condominium development. The landscape plan has been reviewed by the City Forester, and he is satisfied that all outstanding issues have been addressed. Architecture The architecture of the new connecting lobby structure will continue the "Spanish Mediterranean" theme and character of the two existing buildings. These two buildings, • which currently feature towers, pre -cast bandings, and scoring, will also have architectural enhancements to the facades. The new drop -off area will feature a portico with columns and a tower feature, which the applicant states has been designed to contribute to a more commanding "sense of presence" on U.S. Highway One. The body color of the buildings will be Sherwin Williams "GO145 Optima Yellow" and "OC90 Harvest Gold" trim with white accents. The earth tones of the tile roofs will be continued with the new addition. Signa.ge There is an existing monument sign is being proposed with this petition. intended for hotel patrons only, no existing monument sign. Previously Approved Waivers at the main entry to the site. No additional signage Because the breakfast bar and lounge area are signage for such functions will be allowed on the The following four waivers were previously approved through the adoption of Resolution 44, 2005: 1. Section 78 -344, Construction and Maintenance, to allow for 53, 9.5 -foot wide parking spaces. • 11 Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA -07 -03- 000005 • 2. Section 78 -153, Nonresidential Zoning District Regulations, to allow for a 41 -foot front building setback. 3. Section 78 -153, Nonresidential Zoning District Regulations, to allow for a building height of 50 feet. 4. Section 78 -153, Nonresidential Zoning District Regulations, to allow an eight -foot waiver (for a 7 -foot wide) landscape buffer adjacent to residential. The applicant requests the above waivers be continued and that one additional waiver be approved regarding a reduction in size of the loading zone. Please see Table 2. Additional Waiver Request ' {�g`X { F1'? & q + ti"'i L y P �� ' I'll . `: p g $ L d• .` ' c . ' } i • • • • • (1) The applicant states that this existing loading space has served the site since the previous approval and would, therefore, like to continue its use with the • current dimensions. It is staff's opinion that by providing additional landscaping and a courtyard amenity the applicant has provided an innovative design which justifies the continued use of the existing loading space. Staff has no objection to this waiver request. DEVELOPMENT REVIEW COMMITTEE (DRC) COMMENTS: Attached are the most recent comments received from the DRC members, along with the applicant's responses. Included are comments from Fire Rescue and Police Department representatives, who state they no longer have any concerns or issues. Furthermore, the applicant has revised the landscape plans to address comments by Seacoast Utility Authority. LBFH, Inc., the City's engineering consultant, has reviewed the revised plans and is satisfied that all certification issues have been addressed. STAFF RECOMMENDATION Previously, outdoor seating and outdoor musical entertainment associated with the public restaurant had been a concern of the Twelve Oaks residential community located immediately to the east in unincorporated Palm Beach County. Three conditions prohibiting these activities were included in Resolution 44, 2005, and are proposed to • remain in effect. 5 Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA- 07 -03- 000005 • Staff recommends APPROVAL of Petition PUDA- 07 -03- 000005, with one additional waiver and the following conditions: En_gineerinq: 1. Applicant shall copy to the City all permit applications, permits, certifications and approvals. (City Engineer) 2. Applicant shall provide all necessary construction zone signage and fencing as required by the City Engineer. (City Engineer) 3. Prior to construction plan approval and the issuance of the first land alteration permit, the Applicant shall provide cost estimates in accordance with LDR Sections 78 -309 and 78 -461 and for on -site project improvements, not including public infrastructure, or landscaping and irrigation costs for review and approval by the City. The cost estimates shall be signed and sealed by an engineer and landscape architect registered in the State of Florida and shall be posted with the City prior to the issuance of the first land alteration permit. (City Engineer) 4. Prior to the issuance of the first land alteration permit, the Applicant shall provide a cost estimate for public infrastructure, landscaping, and irrigation. The cost estimate shall be signed and sealed by an engineer and landscape architect registered in the • State of Florida. The cost estimate shall be based on 110% of the total combined approved cost estimates and shall be posted with the City prior to the issuance of the first building permit. (City Engineer) 5. The construction, operation and /or maintenance of any elements of the subject project shall not have any negative impacts on the existing drainage of surrounding areas. If, at any time during the project development, it is determined by the City that any of the surrounding areas are experiencing negative drainage impacts caused by the project, it shall be the applicant's responsibility to cure said impacts in a period of time and a manner acceptable to the City prior to additional construction activities. (City Engineer) 6. Prior to issuance of the first land alteration permit, applicant shall submit signed /sealed /dated construction plans (paving /grading /drainage and water /sewer) and all pertinent calculations for review and comment. (City Engineer) 7. Applicant shall comply with any and all Palm Beach County Traffic Division conditions as outlined in PBC Traffic Division equivalency and concurrency approval letters. (City Engineer) 8. Prior to construction plan approval and the issuance of the first land alteration permit, applicant shall schedule a pre - permit meeting with City staff. (City Engineer) 0 6 Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA- 07 -03- 000005 • 9. Prior to the issuance of the first land alteration permit the applicant shall provide to the City letters of authorization from the applicable utility companies allowing landscaping and light poles to be placed within the utility easements. (City Engineer) 10. Applicant shall notify the City's Public Works Division at least 10 working days prior to the commencement of any work/construction activity within any public right -of -way within the City of Palm Beach Gardens. In the case of a city right -of -way, the applicant has at least five working days to obtain a right -of -way permit. Right -of -way permits may be obtained at the Building Division. Failure to comply with this condition could result in a Stop Work Order of all work/construction activity within the public right -of -way and the subject development site. (Public Works) Building: 11. Separate permit and application will be required for: paving, drainage, water and sewer improvements, landscaping, irrigation, site lighting, signage, fire sprinkler and fire alarm. (Building) Police CPTED: 12. Prior to the issuance of the first Certificate of Occupancy, lighting locations and building addresses shall not conflict with landscaping, including long -term canopy • growth. In addition, landscaping shall not obstruct the view of windows, building address numbers or walkways. (Police Department) 13. Prior to the issuance of the first Certificate of Occupancy, the Applicant shall provide a timer clock or photocell sensor engaged lighting above or near entryways and adjacent sidewalks. (Police Department) 14. Prior to the issuance of the first building permit, the Applicant shall provide a street address system depicting street names and numerical addresses for emergency response purposes. Address system depiction shall be in 8.5" x 11" map format. (Police Department) 15. Prior to the issuance of the first building permit, the Applicant shall submit a construction site security and management plan for review and approval by the Police Department. Non - compliance with the approved security and management plan may result in a stop -work order for all construction activities. (Police Department) 16. Prior to the issuance of the first Certificate of Occupancy, all on -site lighting shall be installed, including the existing underground parking garage, and shall include all exterior pedestrian walkway lighting, which shall utilize 12 foot pedestrian scale light poles. All on -site lighting shall consist of metal halide or equivalent lighting approved • by the Police Department. (Police Department) 7 Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA- 07 -03- 000005 is 17. Prior to the Issuance of the first Certificate of Occupancy for the lobby addition building, the Applicant shall provide a timer clock or photocell sensor engaged lighting above or near entryways and adjacent sidewalks for said building. (Police Department) 18. Prior to the issuance of the first Certificate of Occupancy for the lobby addition building, all entry doors shall be equipped with a metal plate over the threshold of locking mechanism and case hardened deadbolt locks on all exterior doors with minimum one (1) inch throw; door hinges on the interior side of each door, and the main entries to the lobby addition building shall be wired for closed- circuit digital camera surveillance system. (Police Department) 19. Prior to the issuance of the first Certificate of Occupancy for the lobby addition building, all numerical addresses shall be placed at the front and rear of each building. Each numerical address shall be illuminated for nighttime visibility, shall provide bi- directional visibility from the roadway (when applicable), shall consist of twelve (12) inches in height, and shall be a color different than the color of the surface to which it is attached. The rear doors of a building with multiple tenants shall have an illuminated 6 -inch room number placed on or along side door. (Police Department) • 20. Prior to the issuance of the first Certificate of Occupancy for each building, elevator cab interiors which are not completely visible when door is open, shall have shatter - resistant mirrors placed in a location approved by the Police Department. (Police Department) 21. Prior to the issuance of the first Certificate of Occupancy, the existing four -story building on the north end of the site shall have street address numbers placed on the roof -top parallel to U.S. Highway One. Such numbers shall only be visible from the air. The numerals shall be white blocked letters of weather resistant material, four feet in height, and 18 inches wide. (Police Department) 22. Prior to the issuance of the first Certificate of Occupancy for each building, interior stairwell doors shall have glazing vision panels, five inches wide by 20 inches in height. Areas beneath stairways at ground level shall be fully enclosed. Fully enclosed stairways with solid walls shall have shatter resistant mirrors at each level and landing placed to provide visibility around corners. (Police Department) Planninq & Zoning: 23. Prior to the issuance of the first building permit, the Applicant shall post escrow or make payment in -lieu for Art in Public Places in accordance with the City Code. if the Applicant is proposing art on site, an application for art approval shall be submitted • prior to the issuance of the first building permit, and the art shall be approved prior to E Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA- 07 -03- 000005 . the issuance of the first Certificate of Occupancy. If the art is not approved prior to the issuance of the first Certificate of Occupancy, the City shall have the option of withdrawing the escrow. (Planning & Zoning) 24. At no time shall staging of construction vehicles and /or service vehicles occur within a public right -of -way. All vehicular construction activities shall occur on the hotel site. (Planning & Zoning) 25. Prior to issuance of the first building permit, the Applicant shall demonstrate safe access and segregation of the construction areas from the public areas. (Planning & Zoning) 26. Prior to the issuance of the first building permit for vertical construction, the Applicant shall install a six (6) foot tall construction fence with a privacy tarp surrounding the construction area of the property. (Planning & Zoning) 27. The Applicant shall coordinate and receive approval from the Growth Management Administrator prior to the closing of any public sidewalk. (Planning & Zoning) 28. Prior to the issuance of the first building permit for each phase, digital files of the approved plat shall be submitted to the Planning and Zoning Division, and approved civil design and architectural drawings, including floor plans, shall be submitted prior • to the issuance of the first Certificate of Occupancy for each phase. (GIS Manager) 29. Prior to issuance of the first building permit, required digital files of the approved plat in its entirety transformed to NAD 83 State Plan Coordinate System shall be submitted. Prior to issuance of the first Certificate of Occupancy, approved civil engineering as -built design and architectural drawings shall be submitted in digital format. (Planning & Zoning) 30. No general public restaurant, bar, or lounge use shall be allowed on the premises. The breakfast bar and lounge shall be for hotel patrons use only, and no signage shall be allowed on the entry monument sign advertising a restaurant, bar, or lounge. (Planning & Zoning, Code Enforcement) Resolution 44, 2005 - Revised Conditions of Approval: 1. All mechanical louvers shall be painted to match the surrounding wall. (Planning & Zoning) 2. Musical entertainment, including, but not limited to, bands, instruments, and speakers shall be prohibited in all outside areas on site. (Planning & Zoning, Code Enforcement) . 3. Outdoor seating for the restaurant breakfast bar and lounge area shall be 9 Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA- 07 -03- 000005 • prohibited, no food and beverage service shall be permitted in any outside area, and the all existing outdoor seating and food and beverage service operation shall cease immediately upon the adoption of this Resolution. (Planning & Zoning, Code Enforcement) rff�rrmnl"a Erna. .._ 6. Within 45 days from the effective date of this Resolution, the applicant shall convert the existing meeting room area to a multi - purpose space to be utilized for hotel guests. (SATISFIED). This multi - purpose space shall be limited to lobby space, storage, an exercise area, or to address the needs of guests staying at the hotel. No outside meetings, such as banquets or receptions, shall be permitted on site. (Planning & Zoning, Code Enforcement). 7. The parking area below the ancillary building shall be 100% clear of all hotel and restaurant storage, including the walled -in area located in the rear of the underground parking area, immediately following the adoption of this Resolution. • The walled -in storage area shall be converted into two parking spaces immediately following the adoption of this Resolution. (Planning & Zoning, Code Enforcement) 8. Within six months from the effective date of this Resolution, the applicant shall construct two additional vertical feet to its existing concrete wall located along its eastern boundary line. The existing concrete wall separates the applicant's property from the Twelve Oaks Condominium Association, Inc. The applicant shall apply for and obtain all necessary permits. The two -foot addition shall be built and painted to match the existing wall. (SATISFIED) 9. The applicant shall use its best efforts to secure all necessary consent and permits to construct a fence to secure the approximately fifteen feet of unsecured property along the southeast corner of the applicant's property to prevent pedestrian traffic between its property and the Twelve Oaks Condominium Association, Inc. Said concrete wall or fence shall be built to the same vertical height of the existing concrete wall located along its eastern boundary line. Said wall or fence may include a lockable gate. If said wall is constructed of concrete, it shall match the existing concrete wall and painted to match the existing wall. (SATISFIED) 10. The applicant shall prohibit swimming past dusk and use its best efforts to prevent excessive noise between the hours of 9:00 p.m. and 8:00 a.m. • jholloman /case files/Wyndham akaWaterford /Staff report PUDA -07 -03 -00005 PZAB.doc Bull • Subject Propert y Waterford/Wyndham Garden Hotel North Wendy's Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA- 07 -03- 000005 Planned Unit Development/ Commercial General Commercial (PUD /CG -1) General Commercial I Commercial (CG -1) South Planned Unit Development/ Professional Office The Towers Office Professional Office Building (PUD /PO) U West U.S. Highway One & Northern Trust Bank East Twelve Oaks Condominiums r� U Planned Unit Development/ Commercial General Commercial (PUD /CG -1) Residential High — Palm Residential High — Beach County Palm Beach County 11 • 7 • Date Prepared: July 27, 2007 Meeting Date: August 28, 2007 Petition: PUDA -07 -03- 000005 Minimum Site Width 300.8 feet Yes 100 feet: (measured at front building setback line) Maximum Building Lot 20.81% Yes Coverage: 35% Maximum Building Height: 50 feet Waiver previously 36 feet approved Setbacks: Front: 45.7' Waiver previously Front: 50 feet North Side: 53.8' approved for 41 -foot front Side: 15 feet South Side: 59.5' setback Rear: 15 feet Rear: 52.7' Parking Required: 99 spaces Yes 99 spaces Parking Space Size: 9.5' x 18.5' Waiver Previously 10'x 18.5' Approved Landscape Buffer 7 -foot Waiver Previously Adjacent to Residential: Approved 15 -foot 12 �J • U Cotleur& Hearing 1934 Commerce Lane • Suite 1 • Jupiter, Florida August 20, 2007 Landscape Architects I Land Planners I Environmental Consultants 33458 • Ph 561.747.6336 • Fax 561.747.1377 • Lic. #LC- C000239 To: Jackie Holloman, City of Palm Beach Gardens Cc: Kenneth Ufkin, Twelve Oaks Condominium Association, Inc. Eleanor Wehrman, Twelve Oaks Barry Norton, Twelve Oaks Jim Geiger, Titan Don Hearing, Cotleur & Hearing, Inc. From: Ali Kalfin, Cotleur & Hearing, Inc. Re: Wyndham Garden Hotel Meeting Minutes 8.20.07 The meeting was held at 10 AM at the Twelve Oaks club house. Ken Ufkin, Eleanor Wehrman and Barry Norton attended from Twelve Oaks. Don Hearing and Ali Kalfin attended on behalf of Wyndham Garden Hotel. Jim Geiger, the owner of the hotel, was also in attendance. Don Hearing reviewed the site plan and architectural addition proposed for the future Wyndham Garden Hotel with Ken, Eleanor, and Barry. He explained that Jim Geiger was requesting these improvements to attract a quality hotel flag for the property. To secure a flag like Wyndham versus a Motel 6, the hotel must have internal connections from the guest suites to the amenities in the other building. The hotel must also have a central lobby area. The homeowner association manager and the homeowners understood these requirements but wanted to make sure that both the noise and smell elements from the hotel would be limited. They had issues with the previous owners regarding both loud music and outside grilling. Jim confirmed that outside grilling, happy hours, etc. would not occur on his property and that loud music would not be played outside. Eleanor and Barry explained that they were happy that the space would now be well used and occupied by a good element. They said they realized that people would be outside but requested that the noise and smell factors were kept at bay. Construction of the addition was also discussed. Jim Geiger confirmed that the hours of construction would be limited to day time only and limited on weekends. He also added that 32 security cameras had been recently installed on the property. Eleanor and Barry said they would attend the PZAB meeting on the August 28th, 2007. • Cotleur& Hearing Windsor Gardens Hotel (a.k.a. Waterford Hotel) Site Plan Amendment Justification Statement Introduction February 26th, 2007 The 1.85 -acre property located on U.S. Highway 1 in the City of Palm Beach Gardens is currently approved for a 77 room hotel and a +/- 1,700- square foot restaurant open to the public. The property was recently sold to Pinnacle Hospitality who would like to return the site to its original approval of straight hotel with no public rest�nt m5-Q,. The applicant is requesting a major amendment to a PUD to perms 0 otel rooms and hotel accessory uses. The applicant is also proposing several upgrades to the subject property to improve the current site conditions. The upgrades included within this request are: • 1. Structural addition between existing buildings to provide for new entry, central lobby and drop -off area 2. Facade improvements to existing buildings 3. New courtyard to be located between existing buildings as site amenity 4. Minor vehicular area modifications 5. A second exit to U.S. Highway 1 Specific Requests and Fees PCD or PUD Amendment $2,250.00 Total Fees $2,250.00 APPLICANT Pinnacle Hospitality Attn: Jim Geiger 11231 US Highway 1, Suite 381 Palm Beach Gardens, FL 33401 Cotleur& Hearing ryr Windsor Gardens Site Plan h :ndment 2.26.07 Justification Statement Project Team • AGENT / PLANNER / LANDSCAPE ARCHITECT Cotleur & Hearing, Inc. Attn: Don Hearing / Alessandria Kalfin 1934 Commerce Lane, Suite 1 Jupiter, Florida 33458 P: 561 - 747 -6336 ext. 128 F: 561 - 747 -1377 ARCHITECT Ames Design International Attn: Shane Ames 203 Dixie Boulevard Delray Beach, FL 33444 P: 561- 274 -6444 F: 561- 274 -6449 CIVIL ENGINEER Michael B. Schorah & Associates, Inc. Attn: Martha Carter 1850 Forest Hill Blvd, Suite 206 West Palm Beach, FL 33406 P: 561 - 968 -0080 • F:561- 642 -9726 TRAFFIC ENGINEER Kimley -Horn & Associates, Inc. Attn: Adam Kerr 4431 Embarcadaro Drive West Palm Beach, FL 33407 P: 561 - 840 -0874 F: 561- 863 -8175 General Project Description The subject property is a 1.85 acre property located on the east side of U.S. Highway 1, just south of the PGA Boulevard intersection. The property possesses a Commercial PUD zoning designation and consistent Commercial comprehensive land use designation. The parcel is surrounded by properties with compatible commercial land use and zoning designations with the exception of the property to the east, which is located within unincorporated Palm Beach County and holds the Twelve Oaks Condo community. The most recently approved site plan permitted a 77 room hotel and a +/- 1,700- square foot restaurant open to the public. The property was recently sold to Pinnacle Hospitality who would like to return the site to its original approval of straight hotel with out restaurant use. Pinnacle Hospitality, the applicant, is also proposing several upgrades to • the hotel property to improve the current conditions of the run -down business. Cotleur& Hearing Windsor Gardens Site Plan A_ ..;ndment 2.26.07 Justification Statement • The Applicant is proposing to make an amendment to the currently approved site plan for the 1.85 acre parcel. The modifications with the request include: 1. The elimination of restaurant use 2. The addition of thirteen (13) hotel rooms 3. An additional structure and courtyard on the ground floor to connect the existing buildings 4. Fagade improvements to existing buildings 5. Minor vehicular area modifications 6. A second exit to U.S. Highway 1 The overall square footage of the hotel structure is to remain the same; the applicant is eliminating hotel suites to attain the thirteen additional hotel rooms. The addition between the two existing structures will be for lobby and concierge space, an essential element of the hotel business. Tl raa that- was -prre.Yiously, fQj�.the public restaurant= is proposed to �e.�.Sed. as -a, breakfast bar and lounge area for hotel guests only, The new exit onto U.S. Highway 1 has been provided to alleviate the possible congestion provided by the elimination of the drive aisle between the existing buildings. Vehicular Circulation & Parking: The overall program of the site will remain consistent with the previous site plan approvals. The parking area has been modified insignificantly to accommodate improved ADA conditions, additional landscape, and code - abiding parking spaces (including previously approved waivers). The circulation between the two existing buildings on -site has been eliminated for the proposed lobby and courtyard area. A second exit has been • added to the north side of the site to alleviate the congestion that would possibly accumulate due to the proposed lobby and courtyard. The one -way exit has been preliminary approved by FDOT and will be formally applied for once site plan approval is issued by the City. The existing entrance /exit in the central area of the site is to remain, however the configuration of the traffic flow once inside the site has changed slightly due to the proposed structure. The proposed structure will include a new drop -off area for guests that will be covered and will have a by -pass lane to prevent stacking problems. This area will also be managed by the hotel to ensure that cars do not park or sit idle preventing traffic to move harmoniously. Architecture: The architecture of the new structure will be consistent with the character and architecture of the existing buildings on the site. The architectural treatments and colors to the new and existing structures are a large improvement to what existed prior. The addition will be most noticeable at the sites frontage and will provide a new central entry to the hotel. The structure will add significant presence to the U.S. Highway 1 corridor. 40 Cotleur& Hearing Windsor Gardens Site Plan A, ...ndment 2.26.07 Justification Statement • COMPLIANCE WITH SECTION 78- 49(b): AMENDMENTS TO APPROVED DEVELOPMENT ORDERS: MAJOR AMENDMENTS (1) Increase of intensity. Any change in nonresidential intensity which, in combination with prior minor amendments, cumulatively exceeds the limitations or standards listed below. An increase in hotel rooms is requested; however the elimination of restaurant use will negate increased effect by these additional rooms. a. Relocation. Any proposed relocation of the approved number of gross square footage which is equal to or greater than five percent of the approved gross square feet of all nonresidential structures. Not applicable b. Decrease in required parking. Unless otherwise provided in this chapter, any proposed decrease of the existing number of parking spaces which is the greater of five percent of the existing parking spaces or 20 parking spaces. Decreases in required parking otherwise requiring action by the planning, zoning and appeals board or the city council shall not be considered a major amendment for the purpose of this section. • Only four (4) parking spaces are eliminated from the approved site plan due to the use change. The proposed 99 parking spaces is what currently exists on site. c. Increase in the number of structures. Any proposed increase in the number of principal or accessory structures that changes the overall intent of the original approval. The additional structure proposed to connect the ground floor of the existing buildings will not change the intent of the original approval; it will improve the current site conditions by providing internal access from one building to the other. d. Any proposed reduction of heavily utilized parking spaces as determined by the growth management director. Not applicable (2) Increase in density. Any increase in the approved number of residential units. Not applicable (3) Increase in building height above the height permitted in the applicable zoning district. • Not applicable Cotleur& Hearing Windsor Gardens Site Plan i- ..— mdment 2.26.07 Justification Statement • (4) Utility facilities. Any addition or relocation of outdoor utility facilities, including, but not limited to, the following: chillers, air - conditioning units, above - ground fuel tanks including propane or natural gas, electrical equipment such as junction boxes, and ground- mounted service boxes for public utilities such as telephones and cable television, which are deemed to be substantial by the growth management director. This shall not apply to single - family lots or duplex lots. Not applicable (5) Boundary changes. Any proposed boundary change of the approved development plan. Not applicable (6) Traffic impact. Any increase in overall traffic impact, except as may be provided in this chapter. A traffic impact statement has been included within this application. The statement concludes that no significant traffic impact will be created due to the changes in use or the additional exit. (7) Character and appearance. Any amendment which would negatively impact the character or the appearance of an approved development. is The structural addition was designed to be completely consistent with the existing buildings on site and will not negatively impact the character or appearance of the development. (8) Amenities. Any amendment which would materially decrease the number or size of amenities in all or a portion of any residential or nonresidential development. The applicant is adding a courtyard amenity to the site with this application request. Amenities will not be decreased by any means. (9) Residential unit types. Any change in the approved mix of residential dwelling unit types that would require alterations of an approved plat. Not applicable (10) Architectural style. Any change in the approved architectural style of residential dwelling unit types or nonresidential structures which results in: a. An architectural style that is out of character with the approved or existing architecture (e.g., change from Mediterranean style to neo- classical). The architectural style for the addition is consistent with what currently exists on site. • b. New residential models that are substantially different from approved models. Cotleum Hearing Windsor Gardens Site Plan r_...:,ndment 2.26.07 Justification Statement - • Not applicable (11) Building materials. Any significant changes in exterior building materials that result in a downgrade as determined by the growth management director. The applicant has improved the building materials that were previously used for the existing buildings on site and has used these new materials for the addition as well. (12) Changes to phasing or conditions. Any changes to an approved development phasing plan or any condition of development approval. A change to the development order is being requested to amend the approved uses for the site from hotel and restaurant to hotel only. The applicant proposes to eliminate a# conditions from Resolution 44 2005 that directly relate to the previously approved restaurant use. The applicant also proposes a revision to the development order that would permit up to 90 hotel rooms. (13) Changes to developer's agreements. Any changes to an approved developer's agreement. Not applicable • Conclusion This request for a PUD major amendment is in harmony with the City's Comprehensive Plan and Zoning Code, and is consistent with the existing surrounding land uses and original land development approvals for the site. The request meets all adopted levels of service within the City. The Applicant looks forward to meeting with City representatives to discuss the revisions and improvements to the site plan and respond to any outstanding comments or issues that staff may have. • Cotleur& ®Hearing ES #2438 Michael B. Schorah and Associates, Inc. ENGINEERS *SURVEYORS *DEVELOPMENT CONSULTANTS WINDSOR GARDENS HOTEL WATER MANAGEMENT CALCULATIONS SUITE 206 1850 FOREST HILL BLVD. WEST PALM BEACH, FL 33406 PHONE (561) 968 -0080 FAX (561) 642 -9726 Land Uses Proposed Area Existing Area Net Change Building /Pool Area 0.46 acres Pavement Area 0.96 acres Green Area 0.43 acres Total Area 1.85 acres 0.41 acres 0.05 acres 1.05 acres -0.09 acres 0.39 acres 0.04 acres 1.85 acres 0.00 acres WWW.SCHORAH.COM Surface storage remains the same for all areas of the site except the proposed building addition and the proposed landscape courtyard area. Storage volumes for these areas are as follows: Proposed: Building Area = 0.05 acres el. 16.0 min. • Green Area = 0.04 acres el. 14.0 to el. 15.5 Surface Storage at elevation 16.0 = 0.04 ac. -ft. Soil Storage (> 4' above GWT) = 0.04 ac. x 10.9 in. x 0.75 = 0.33 ac. -in. = 0.03 ac. -ft. Total Storage Volume = 0.04 ac. -ft. + 0.03 ac. -ft. = 0.07 ac. -ft. Existing: Pavement Area = 0.09 acres el. 14.53 to el. 15.90 Surface Storage at elevation 16.0 = 0.04 ac. -ft. Soil Storage = 0.00 ac. -ft. Total Storage Volume = 0.04 ac. -ft. + 0.00 ac. -ft. = 0.04 ac. -ft. The overall pervious /impervious areas are consistent and the storage volumes for the proposed site development exceed that which currently exists on the site. Martha H. Carter, P.E. Florida Registration No. 47589 • Dated: D7 CIVIL - STRUCTURAL - DRAINAGE - HIGHWAYS - WATER a SEWER - SURVEY o` Al Holly Ln Reaon or W Monet Dr /10 N French Ue7arrir 2 Dens Passage Niki Jo Ln Palm Harbor Laurel Li Inland Cove I O� COtiCUr & Hearing \� Florida Blvd Atlantic Rd T d, r L 0. f m 'n d o- n CD 3 =1 N � m D CD co Carib Cir Bay Cir Azure Cir PROJECT SITE W, Rolling Green Rd 3 O s asi a Crafton Rd c; N Juno Isles Blvd Ardley Rd 0 N w Seminole Blvd Universe Blvd Pleasant Dr Ocala Rd Juno Rd Len Dr / a o qO c� yr CL w. Canal Rd ,❑ E c E U -J LL Carolind Dr n ` o Rca Blvd F 70 Oaks -a, Monet Rd McLaren\f2d C7r o Lake forth 0(p L tF Tall Oaks Or o (L Garden Ln o Burns Rd D 01 o O to O ads � U ; O Palm Ln 0 c6 03 U° �rlook O' � p Or fr . E C m Q 0 \ CD 01 y Ironwood Rd. Shore Rd N aO, w Marlin Rd .> 0. No►th m Beach Lighthouse Dr a Kingfish Rd d m lbls: InletRd \f Rd tlantic o �' CL ay W °. u bbflde D o v Q °_ Gu \\ G� E v. Z Guava St v W N E 1 inch equals 0.5 miles Map Document: (F:1AmMap_Pmjec1s106 -0620 WATERFORD MOTEUBASE.mxa) 212212007 - 3 34:04 PM palm Way? Nose m m CD Village Rd Location Map Waterford Hotel COtiCUr & Hearing Palm Beach Gardens, Florida 1934 Commerce Lane Suite 1 Jupiter, FL 33458 Phone: 561- 747.6336 Fax: 561- 747 -1377 v b KI t. i •$M a ray t . B .T 1 l b �p !. 4 `6 3 R t �• r Pat $ li► A a �Y *t�rs;�•.. a �Y ?R w g 1 e K A•. t! t SR•:r I_ � j �� rr►51. `�i� s.. , ,. 4t '� �q "R4.T�App!A�Mer D/ r h� P t ; Cotleur & Hearing is1934 Commerce Lane • Suite 1 • Jupiter, Florida To: Jackie Holloman Cc: Jim Orth From: Alessandria Kalfin Date: August 1, 2007 Landscape Architects I Land Planners I Environmental Consultants 33458 • Ph 561.747.6336 • Fax 561.747.1377 • Lic. #LC- C000239 Subject: Wyndham Garden Hotel (f.k.a. Waterford Hotel) Please accept the following responses to the LBFH comments from Jim Orth dated July 25th, 2007. 4. Not Satisfied. a. Not Satisfied. The applicant shall revise the walk width, which is shown on the engineering plan to be four (4') feet wide, to be a minimum five (5') foot clear walk, measured from the back of curb, for conformance to the requirements of Section 78- 230 of the LDR. • Response: The site plan, engineering plan and architectural site plan have been revised to reflect this change. Please see the revised plans included within this resubmittal. 17. Not Satisfied a. — d. Parking garage Response: Per the team lighting consultants correspondence with Jim Orth, today August 1 st, 2007, LBFH has agreed that Comment #17 pertaining to the garage photometrics does not apply to Site Approval, and shall be addressed during the hotel's interior renovation phase. Jim Orth has confirmed that the garage photometric plans will be addressed during the interior phase. CRY OF PAIM BCH GDNS •�lG - 2 2001 PLANNING & ZONING Did; Cotleur& ® Hearing Landscape Architecture Land Planners I Environmental Consultants 934 Commerce Lane • Suite 1 • Jupiter, Florida • 33458 • Ph 561.747.6336 Fax 561.747.1377 • Lic. #LC- C000239 July 20; 2007 Ms. Jackie Holloman Planning & Zoning Division City of Palm Beach Gardens 10500 North Military Trail Palm Beach Gardens, FL 33410 RE: Waterford/Wyndham Garden Hotel PUD Amendment Dear Ms. Holloman: We offer the following comment on your transmittal dated July 17, 2007 concerning the referenced project. The applicant needs to revise the landscape plans and provide a root •barrier at the backflow preventer and meter located in the southerly Seacoast easement. `L A 58" root barrier has been added to the plan, a minimum of 4' from the backflow -�C preventer. Please call if you require additional information. Sincerely yours, Cot�leur & Hearing, Inc. All Kalfin, Land Planner it A Cotleur & HearingLandscape Architects I Land Planners I Environmental Consultants • 1934 Commerce Lane • Suite 1 • Jupiter, Florida - 33458 - Ph 561.747.6336 • Fax 561.747.1377 - Lic. #LC- C000239 TO: Jackie Holloman FROM: Alessandria Kalfin DATE: July 13`h, 2007 FILE NO. 16792 SUBJECT: Waterford Hotel Response to LBFH 6.7.07 Comments PUDA- 07 -03 -05 4. Not Satisfied. While the applicant dimension the elements of the plan including; the radii of the entry rotary area, the entrance drive to the underground parking, etc. for conformance with Section 78 -46 of the LDR. However; • a. The applicant shall revise the walk width, which is shown on the engineering plan to be four (4') feet wide, to be a minimum five (5') foot clear walk, measured from the back of curb, for conformance to the requirements of Section 78 -230 of the LDR. Response: The sidewalk has been revised to a width of S feet from the back of curb on the engineering plans. b. The applicant shall dimension the sidewalk abutting the handicap stalls, on the east side of the building, for conformance with Section 78 -230 of the LDR. As the applicant proposes handicap ramps for this walk, modification of the width will be required to meet the five (5') foot minimum noted above. Response: The sidewalk has been dimensioned on the engineering plans as 5-feet. The site plan had previously dimensioned this sidewalk at 5-feet. c. The applicant shall revise the architectural plan (Sheet P2), landscape plan, engineering plan, site plan and photometric plan for consistency. The architectural plan, landscape plan and photometric plan show a walk along the rotary, north of the garage entrance, whereas the engineering plan and site plan do not propose a walk at this location. • Response: The site plan, landscape plan and engineering plan have been consistent in showing JUL 16 2007 Ms. Jackie Holloman Wyndham Gardens Hotel (f.k.a. Waterford Hotel) Response to LBFH June 13, 2007 Page 2 of 7 . a planted area to the north of the garage entrance. The architectural site plan and photometric plan have been revised to eliminate the walk and add the planting area. 5. Not Satisfied. While the applicant clarified the size of the loading area (Sheet 1 of 5), which does not scale to agree with the requirements of Section 78 -362 of the LDR. The applicant notes that the space was not constructed in compliance with the previous approval, which required the loading space size be 12' x 35' per the LDR. However, the applicant is requesting a waiver to permit the utilization of the current 10.5' x 32.5' loading space as shown. Response: The applicant acknowledges this comment. 7. Not Satisfied. The applicant shall revise the loading space sign (Sheet i of 5) to clearly indicate that it is a loading space, as shown in Figure 2B -16 of the MUTCD. However, a. While the applicant has indicated that a loading zone sign is required, the applicant shall specify the sign designation and/or provide a detail conforming to the MUTCD sign guidelines, either on the plan view or the detail page. Response: A detail conforming to the MUTCD sign guidelines have been added to the detail . page of the site plan. 17. Not Satisfied. The applicant provided a signed and sealed photometric plan for compliance with Ordinance 26, 2006 and the City's lighting policy, which amends Section 78 -182 and Section 78 -751 of the LDR. However, • a. The applicant shall provide certified test results that the parking garage meets the current code or a remediation plan, with a photometric plan, which meets current code. Response: The applicant has provided a revised photometric plan which provides test results for the existing parking garage which meets current code. 18. Not Satisfied. The photometric plan shall identify the proposed lighting levels, as noted in Table 1 of said Ordinance 26, 2006, of the drive lanes and parking stalls, portico, pedestrian use areas (including walks and open space, pool, deck, courtyard area) and the parking garage, etc. However, the applicant shall provide the following, for conformance with said Ordinance 26, 2006 and the City's lighting standards. a. The applicant shall provide lighting level data for the pedestrian use areas including; i. All walkways and pathways (to back of walk/path). FAProject DocumentsT6 -0820 Waterford HoteRMAJOR AMENDMEN iIRESPONSES1060820MA_2nd Response.doc Ms. Jackie Holloman Wyndham Gardens Hotel (f.k.a. Waterford Hotel) Response to LBFH June 13, 2007 Page 3 of 7 • ii. The accessible route from USH 1 to the entry and along the west side of the garage. Response: The applicant has added lighting level data for the pedestrian use areas which include all walkways and pathways as well as the accessible route from US] property boundary to the entry of the hotel. b. The applicant shall revise the numeric summary to indicate separate values for the pedestrian areas, in addition to the property line, parking area and pool area which are shown. Response: The numeric summary has been revised to indicate walkway areas . c. The applicant shall clarify the illumination proposed for the courtyard area. The applicant currently shows the existing lighting to be removed and discarded, indicating that no lighting will be provided for this area. Response:Per note 5 on the photometric plan, low voltage landscape lighting is proposed for the private, enclosed courtyard. d. The applicant shall clarify if the courtyard is to be accessible to the hotel • guests. Response: The courtyard will be accessible to the hotel guests by the walk located on the southwest corner of the courtyard. This has been noted on the site plan. e. The applicant shall provide lighting and associated light level data if the courtyard is to be utilized by guests. Response: The applicant has provided lighting in the courtyard and surrounding walkways. f. The applicant shall revise the engineering plan, site plan and landscape plan for consistency with the photometric plans as to the proposed location of lighting fixtures. Response: The engineering, site and landscape plans have been updated to reflect the most recent photometric plan revisions. 20. Not Satisfied. The applicant provided a sign to identify that the ingress traffic is to keep right at the rotary (Sheet 1 of 5). However, the following is noted; a. We suggest that the applicant consider relocating the "Do Not Enter" sign to • the rotary island for better visibility to entering traffic. F: \Project Documents\06 -0820 Waterford Hotel \MAJOR AMEN DMEMIRESPONSES %060820_MA_2nd Response.doc :7 Ms. Jackie Holloman Wyndham Gardens Hotel (f.k.a. Waterford Hotel) Response to LBFH June 13, 2007 Page 4 of 7 Response: The sign has been relocated to the rotary. 23. Not Satisfied. The applicant shall verify that the proposed CR -10 ramp (Sheet 1 of 3), for the front entry drop off area, conforms to the requirements noted in FDOT Index 304, specifically, it does not appear that the required four (4') foot landing will be provided, given the location of the building relative to the curb line. However, a. While the applicant revised the building plan to provide the required landing area for the FDOT Type CR -10 curb ramp, the applicant shall revise the plans for consistency. b. The architectural plan shows a drop curb and wide ramp for the accessible entry at the Portico, whereas the engineering plan and other plans show a FDOT Type CR -10 curb ramp for this location. Response: The architectural site plan has been revised to be consistent with the site and engineering plans. Waiver Requests • 1. Not Satisfied. The applicant is requesting a waiver from Section 78 -344 of the LDR regarding parking stall widths. Please note we remain in support of the City's LDR requirements. • Response: This waiver has been granted by previous approval and serves the existing conditions of the site. The applicant continues to request this waiver. 2. Not Satisfied. The applicant is requesting a waiver from Section 78 -153 of the LDR regarding setback requirements. Please note we remain in support of the City's LDR requirements. Response: This waiver has been granted by previous approval and serves the existing conditions of the site. The applicant continues to request this waiver. 3. Not Satisfied. The applicant is requesting a waiver from Section 78 -153 of the LDR regarding building height. Please note we remain in support of the City's LDR requirements. Response: This waiver has been granted by previous approval and serves the existing conditions of the site. The applicant continues to request this waiver. FAProject Documents \06 -0820 Waterford Hotel \MAJOR AMENDMEN RRESPONSES \060820_MA_2nd Response.doc Ms. Jackie Holloman Wyndham Gardens Hotel (f.k.a. Waterford Hotel) Response to LBFH June 13, 2007 Page 5 of 7 • 4. Not Satisfied. The applicant is requesting a waiver from Section 78 -186 of the LDR regarding landscape buffer for commercial parcel abutting residential parcel. Please note we remain in support of the City's LDR requirements. Response: This waiver has been granted by previous approval and serves the existing conditions of the site. The applicant continues to request this waiver. Additional Waiver Requests 6. The applicant is requesting a waiver from Section 78 -362 of the LDR regarding a 12' x 35' loading zone with a 12' x 35' maneuvering area. The applicant is proposing to utilize the existing 10.5' x 32.5' loading zone (as noted in Certification Comment #5). Please note we remain in support of the City's LDR requirements. Response: This waiver serves the existing conditions of the site. The applicant continues to request this waiver. Non - Certification Issues • NOTE: All engineering /infrastructure plans are considered conceptual during the planning and zoning review phase and are subject to further review during the final construction review. These non- certification comments shall be satisfied prior to construction plan approval and the issuance of the first land alteration permit. 1. Not Satisfied. The applicant shall dimension the engineering plan or provide a horizontal control plan, which provides "complete horizontal control of the project sufficient to construct the project and determine the dimensions of all site improvements" in accordance with Section 78 -448 of the LDR. The applicant is advised of the following; a. The applicant shall revise the label for the "20' R" of the south curb line of the rotary entry drive does not coincide with the location of the 20' radius. b. The applicant shall dimension the radius of the west curb on the south side of the rotary, entering the parking area, is not labeled. c. The applicant shall dimension the radius of the curb at the north handicap parking stall. Response: The applicant has labeled and dimensioned the requested areas on the revised plan. 6. Not Satisfied. The applicant shall identify all curb ramps with the appropriate FDOT Index 304 CR numbers for each location. The applicant shall identify the curb ramp numbers for • the handicap stall locations. The applicant is advised of the following; FAProject Documents \06 -0820 Waterford Hotel \MAJOR AMENDMENMESPONSES\O60B20_MA_2nd Response.doc • Ms. Jackie Holloman Wyndham Gardens Hotel (f.k.a. Waterford Hotel) Response to LBFH June 13, 2007 Page 6 of 7 a. The applicant shall clarify if the south access aisle for the handicap stalls has an existing or proposed curb ramp. If proposed the applicant shall so label with the FDOT Index 304 CR #. Response: The applicant has added a note to the plan to identify the proposed curb ramp with FDOT index 304 CR #. 13. Not Satisfied. Prior to the issuance of the first land alteration permit, the applicant shall provide a copy of the following approved permits, as applicable: d Not Satisfied. FDOT — Applicant has provided an application for the FDOT Driveway Connection Permit and indicates they will provide a copy of the permit upon receipt. Response: The application with FDOT has been revised; the north driveway will now be for emergency exit only. The plan has been revised to reflect this change. Once correspondence is received from FDOT it will be provided to the City. 14. Not Satisfied. The applicant shall provide a cost estimate for the project, including public • infrastructure and all landscaping and irrigation costs for review and approval by the City in order to establish surety. The cost estimate shall be signed and sealed by an engineer and landscape architect registered in the state of Florida. Surety will be based on 110% of the total combined approved cost estimates and shall be posted with the City, prior to the issuance of the first land alteration permit. r SUMMARY OF ENGINEER'S ESTIMATE of Probable Construction Costs for On -site and Off -site Public Improvements Grading & Paving $0.0 Sanitary Sewer $0.0 Water $0.0 Storm Water Maintenance $0.0 Signing & Pavement Markin $0.0 Subtotal $0.0 Landscaping Irrigation Subtotal Total 110 %Total Required Surety F: \Project Documents \06 -0820 Waterford Hote11MAJOR AMENOMENrRESPONSES l060820_MA_2nd Response.doc Ms. Jackie Holloman Wyndham Gardens Hotel (f.k.a. Waterford Hotel) Response to LBFH June 13, 2007 Page 7 of 7 • The applicant indicates that a cost estimate for public improvements, including landscaping and irrigation, was included in their submittal. However, it was not received with the materials provided for this review. 0 Response: The landscape and irrigation cost estimate will be submitted under separate cover before PZAB. 15. Not Satisfied. The applicant provided a cost estimate for the on -site project improvements, not including public infrastructure, landscaping and irrigation costs (which were previously submitted by the applicant) for review and approval by the City. The cost estimate is signed and sealed by an engineer and shall be posted with the City prior to the issuance of the first land alteration permit. SUMMARY OF ENGINEER'S ESTIMATE of Probable Construction Costs for On -site Non Public Im rovements Grading $58,735.0 Sanitary Sewer $0.0 Water $1,510.0 Storm Water Maintenance $5,450.0 Signing & Pavement Marking $6,778.0 otal $72,473.0 Response: The applicant is not proposing any public infrastructure. Cost estimate for landscape and irrigation will be provided under separate cover. Additional Non - Certification Items Based on Materials Received for this Review. 17. The applicant shall revise the plans to indicate an acceptable pipe material, such at RCP or FRCP for drainage pipes under all load bearing pavement areas, with the exception of exfiltration areas. Specifically, the line from the courtyard to the inlet in the parking area east of the building. Response: PBG Code 78- 524(2) states "All storm sewer pipe within public or private rights -of- jLaj shall be reinforced concrete pipe and comply with applicable FDOT standards." This pipe is in a private parking area, not a right -of -way. 18. The applicant shall modify the label on the site plan, referencing the paver area of the pool deck, for consistency with the engineering plan, which indicates that the paver deck is "existing ". isResponse: The plan has been modified to indicate the existing paver deck. F:%Project Documenls\06 -0820 Waterford Hotel \MAJOR AMENDMENT \RESPONSES \060820_MA_2nd Response.doc Cotleur& Hearing • 1934 Commerce Lane • Suite 1 • Jupiter, Florida • Officer Julius Barone Palm Beach Gardens Police Department 10500 N. Military Trail Palm Beach Gardens, FL 33410 Landscape Architects I Land Planners 1 Environmental Consultants 33458 • Ph 561.747.6336 • Fax 561.747.1377 • Lic. #LC- C000239 May 21st, 2007 SUBJECT: Response to DRC Meeting April 12, 2007 PUDA- 07 -03- 000005 — Wyndham Gardens (a.k.a. Waterford) Hotel PUD Amendment Dear Officer Barone: Police Department - CPTED Applicant shall provide a detailed Photometric Lighting Plan with types and location of lights before the issuance of a building permit. This is to include the existing underground parking garage. All lighting shall at minimum meet or exceed Palm Beach Gardens lighting codes. Response. A photometric lighting plan has been included with this resubmittal and has met the listed requirements. The existing underground parking garage has been omitted from the photometric plan per discussion with the City engineering department. The applicant is not proposing to change the existing garage. The existing lighting in the garage will remain the same. Therefore a photometric plan should not be required. 1. A combination of Metal Halide and High Pressure Sodium Vapor deluxe color lighting shall be used for all street and pedestrian walkways (12' light poles). Response: The photometric lighting plan as submitted complies w/ the applicable codes and requirements. • Lighting locations should not conflict with landscaping, (to include long term tree canopy growth). Response. The applicant has ensured that lighting and landscape do not conflict, up to long term tree canopy growth. Provide timer clock /photo cell lighting for nighttime use above or near entryways and all exits including emergency exits. Response: The applicant will provide timer clock/photo cell lighting for nighttime use above or near entryways and all exits including emergency exits. 2. Building lighting shall be around perimeter of all sides and on pedestrian sidewalk surrounding the building. Non - glare lighting luminaries shall be used. Response: Lighting for the building has been placed around the perimeter of all sides and on all sidewalks around the building. Non -glare lighting luminaries have been used. 3. Landscaping shall not obstruct view from windows or walkways. Response: The landscape plan has been designed to ensure views from windows or walkways are not obstructed. 4. Directory shall be placed at the ingress point and strategically place directory with arrow . indicator for building at vehicle driver sight level. Officer Julius Barone City of Palm Beach Gardens Wyndham Gardens Hotel May 21st, 2007 Page 2 of 3 • Response: Not applicable. A directory is not requested or required. 5. Commercial numbering system: Shall be illuminated for night time visibility, (photo cell) and not be obstructed by landscaping with an uninterruptible A.C. power source. • Shall be placed at front of building, twelve inch Arabic numerals. • Should have bi- directional visibility from the roadway. • Shall have roof numbers placed parallel to addressed street, visible only from air. Response: The numbering system will be illuminated for night time visibility and will not be obstructed by landscape and will have an uninterruptible A.C. power source. The numbering will be placed at the front of the building and will be 12- inches Arabic numerals. The numbering will be bi- directional qualities to be seen from the roadway. The applicant will place roof numbers on the building. 6. CPTED fencing (6 or 8 foot wrought — iron fencing) shall be placed on the North Side of property line or concrete wall shall be extended to complete the surrounding perimeter. Response: A wrought iron fence, 6 feet in height, has been added to the north property line on the site plan. II. Natural Surveillance 1. Provide landscaping that does not create hiding spaces. Response: The landscape plan has been carefully contemplated to ensure that hiding spaces are not created. • 2. Provide clearly marked transitional zones that indicate movement from public to semipublic through use of brick pavers. Response: Brick pavers have been used within the courtyard area to indicate a semipublic space. All other areas (parking area and drive aisles) have been paved and will be open to the public. • 3. Windows and exterior doors should be visible from parking area. Response: All windows and exterior doors will be visible from the parking area. 4. Parking areas should be visible from windows. Response: The entire outdoor parking area is visible from windows of the hotel. 5. Allow shrubbery to be no more than three feet high for clear visibility in vulnerable areas. Response: All shrubbery proposed on the landscape plan has been depicted at 3 -feet or less in vulnerable areas. III. All Structures should be target hardened, to include but not limited to: 1. Doors shall be equipped with metal plate over thresh- hold of the locking mechanism. Response: The applicant will equip doors with metal plate over thresh -hold of the locking mechanism where applicable. 2. Interior rear doors to office suites shall have 180 degree peephole viewers or a vision panel. Response: The interior doors to office suites will have a peephole or vision panel. FAProject Documents \06 -0820 Waterford Hotel \MAJOR AMENDMENT\RESPONSES \5.18.07 CPTED RESPONES.doc Officer Julius Barone City of Palm Beach Gardens Wyndham Gardens Hotel May 21st, 2007 Page 3 of 3 • 3. Case hardened commercial grade dead bolt locks shall be installed on all interior doors with minimum of one inch throw into the strike receiving the bolt. The cylinder shall have a cylinder guard and a minimum of five -pin tumblers. Response: Case hardened commercial grade dead bolt locks will be used on all interior doors with the applicable requirements listed here. 4. Door hinges shall be installed on interior side of door or non — removable hinge pins or a mechanical interlock to preclude removal of door from the exterior. Response: Door hinges will be installed on the interior side of doors to prevent external removal of doors. 5. Doors secured by electrical operation shall have a keyed- switch to open the door when in a closed position, or by a signal locking device. Response: The electrical glass doors will have a keyed- switch to open the door when closed. 6. Glazing in interior doors, or 40 inches within of any locking device shall be rated burglary resistant glazing. Response: Any interior door glazing will be burglary resistant. 7. Enhance natural surveillance of restrooms by placing them in central areas and reduce number of tenants sharing a common restroom. Install maze entrances; avoid double door entry systems. Response: Restrooms are not being proposed within the lobby addition. 8. It is strongly recommended a digital CCTV system be installed to monitor all pedestrian • activity including underground parking garage. Response: The applicant has installed a camera system to monitor all pedestrian activity on the site (including the garage). 9. Stairwells shall have shatter resistant mirrors at each landing and enclose or restrict access to areas beneath stairway at ground level. Response: Mirrors will be added in each stairwell. Areas under stairwells have been blocked. Please note, cameras are also located in stairwells. 10. All hatchway openings to roof shall be secured from inside with a slide bolt or slide bars. Outside hinges shall be equipped with non - removable pins. Response: Hatchway openings on the roof are secured from inside and outside hinges are equipped with non - removable pins. On behalf of the applicant, please accept these responses to your DRC comments. Please contact me with any questions directly at (561) 747 -6336 x 128. . Regards, Alessandria Kalfin Land Planner Cotleur & Hearing, Inc. FAProject Documents \06 -0820 Waterford Hotel\MAJOR AMENDMENT\RESPONSES \5.18.07 CPTED RESPONES.doc bc • INC. CONSULTING CIVIL ENGINEERS, SURVEYORS & MAPPERS CIVIL P AGRICULTURAL WATER RESOURCES ER & WASTEWATER TRANSPORTATION SURVEY & MAPPING GIS "Partners For Results Value By Design" 0 S.W. Corporate Pkwy. Palm City, FL 34990 (772) 286 -3883 Fax (772) 286 -3925 www.lbfh.com MEMORANDUM TO: Jackie Holloman FROM: Jim Orth, P.E. DATE: July 25, 2007 FILE NO. 16792 SUBJECT: Waterford Hotel PUD Review PUDA- 07 -03 -05 ip p4{ ;pi L &41 Or- PALM, �, 18l We have reviewed the following plans and information for the above referenced project received July 15, 2007: • Copy of Permit Submittal to FDOT dated July 16, 2007 prepared by Michael B Schorah & Associates, Inc. • Copy of Development Plan dated July 16, 2007 prepared by Michael B Schorah & Associates, Inc. In addition to the following plans and information received July 19, 2007: • Applicant's Response to our Prior Comment Memorandum of June 7, 2007, dated July 13, 2007 prepared by Cotleur & Hearing • Engineer's Cost Estimate for Non Public Improvements dated (signed) July 12, 2007 prepared by Michael B Schorah & Associates, Inc. • Conceptual Engineering Plan dated (signed) July 13, 2007 prepared by Michael B Schorah & Associates, Inc. • Development Plan (Sheet 1 of 3) • Paving & Drainage Details (Sheet 2 & 3 of 3) • Photometric Plan (Sheet E0.3 thru E0.6) dated (signed) July 13, 2007 prepared by International Consulting Engineers, Inc. • Site Plan dated (revised) July 13, 2007 prepared by Cotleur Hearing ■ Site Plan (Sheet 1 of 5) ■ Site Detail /Amenity Plan (Sheet 2 of 5) ■ Landscape Plan (Sheet 3 of 5) ■ Landscape Details (Sheet 4 & 5 of 5) ■ Site Plan Area Calculations (Sheet 1 of 1) • Preliminary Architectural Plan undated prepared by Ames Design International. • Site Plan (Sheet Pl) • Floor Plan (Sheet P2 & P3) • Building Street Elevations (Sheet P5) • Building Elevations (Sheet P6) • Floor Plan (Egress) (Sheet 6) PA\PBGMEM0\16792 \16792 - 20070725 - PUDA- 07- 03- 005.doc PINC. • • Waterford Hotel LBFH File No. 16792 We have the following comments: Page 2 of 10 • The applicant proposes to return the building, located on a 1.87 acre site south of PGA Blvd on the east side of USH 1, to its original configuration by removing the restaurant and increasing from 77 to 90 rooms. The applicant indicates that the work is to include: • Structural addition between exiting buildings to provide new entry, central lobby and drop off area. • Fagade improvements to existing buildings. • New courtyard to be located between existing buildings as site amenity. • Minor vehicle area modifications. • A second exit to USH 1. • The applicant has previously provided a Traffic Impact Analysis, dated February 2, 2007, prepared by Kimley Horn & Associates, Inc. which we forwarded to the City's traffic engineer and PBC Traffic Division for review. We previously forward their comments to the City on July 17, 2007. Certification Issues Comments 1 thru 3 Previously Satisfied. 4. Not Satisfied. The applicant dimensioned the elements of the plan including; the radii of the entry rotary area, the entrance drive to the underground parking, etc. for conformance with Section 78 -46 of the LDR. However; a. Not Satisfied. The applicant shall revise the walk width, which is shown on the engineering plan to be four (4') feet wide, to be a minimum five (5') foot clear walk, measured from the back of curb, for conformance to the requirements of Section 78 -230 of the LDR. The walk north of the fountain plaza (Sheet 1) is identified to be four (4') feet wide. The applicant shall revise the walk dimension. b. Satisfied. The applicant dimensioned the sidewalk abutting the handicap stalls, on the east side of the building, for conformance with Section 78 -230 of the LDR. c. Satisfied. The applicant revised the architectural plan (Sheet P2), landscape plan, engineering plan, site plan and photometric plan for consistency, along the rotary, north of the garage entrance. 5. Conditionally Satisfied. While the applicant clarified the size of the loading area (Sheet 1 of 5), which does not scale to agree with the requirements of Section 78 -362 of the LDR. The applicant notes that the space was not constructed in compliance with the previous approval, which required the loading space size be 12' x 35' per the LDR. However, the applicant is PAP13GMEMO \16792 \16792 - 20070725 - PUDA- 07- 03- 005.doc Waterford Hotel Page 3 of 10 LBFH File No. 16792 INS. requesting a waiver to permit the utilization of the current 10.5' x 32.5' loading 0 space as shown. We show this item conditionally satisfied, pending resolution of the applicant's request for a waiver. 6. Previously Satisfied. 7. Satisfied. The applicant has provided a detail conforming to the MUTCD sign guidelines, on the site plan detail page (Sheet 2 of 5). Comment 8 thru 16 Previously Satisfied. 17. Not Satisfied. The applicant provided a signed and sealed photometric plan for compliance with Ordinance 26, 2006 and the City's lighting policy, which amends Section 78 -182 and Section 78 -751 of the LDR. However, (a,. a. Not Satisfied. The applicant shall provide certified test results that the - +�Qr`0� parking garage meets the current code or a remediation plan, with a photometric otometric plan, which meets current code. P �Aa 5'&— i. The applicant shall revise the "Statistics" table to show both day and night lighting levels for the garage. • ii. The applicant shall provide separate lighting level data, in the "Statistics" table, for the following areas of the project; pedestrian areas, parking stall areas, drive aisles, ramps, stairwells, vehicle entrance area and pedestrian entry areas. The following data shall be specified; the minimum fc, maximum fc, average fc, max /min ratio, avg/min ratio, minimum average fc maintained, maximum average fc maintained, minimum initial fc. b. The applicant shall clarify whether calculations refer to "maintained" or "initial" footcandles c. The applicant shall clarify whether calculations refer to "horizontal" or "vertical" footcandles d. The applicant shall revise the "Statistics" table to agree with the information required by Ordinance 26, 2006 and the City's lighting standards, which are based on the IESNA design standards. Specifically: i. For the interior of the parking garage; 1) The applicant shall identify the minimum average maintained, which • shall not be less than 3.0 fc per Ordinance 26, 2006. PAPBGMEM0\16792 \16792 - 20070725 - PUDA- 07- 03- 005.doc Waterford Hotel Page 4 of 10 LBFH File No. 16792 INC. 2) The applicant shall identify the maximum average maintained, • which shall not be more than 50.0 fc per Ordinance 26, 2006. 3) The applicant shall identify the minimum initial fc required, which shall not be less than 1.0 fc per the City's lighting standard. This does not include other areas noted, such as within stairwells. c. The applicant shall revise the "Statistics" table for conformance with Ordinance 26, 2006 and the City's lighting standards. The applicant is advised that; i. During the daytime, the vehicular and pedestrian exits and entrances must maintain a minimum average of 50 fc. ii. Stairwells must maintain 10 fc minimum initial light level (Florida Building Code), as well as a minimum average of 20 fc 24 hours a day (City lighting standards). iii. Ramps, drive aisles, and all other areas of the garage must maintain a minimum average of 3.0 fc. d. The applicant shall identify the lighting levels for the walk areas for all public entrances of the parking garage and stairwells, which shall conform • to Ordinance 26, 2006 and the City's lighting standards. 18. Satisfied. The photometric plan shall identify the proposed lighting levels, as noted in Table 1 of said Ordinance 26, 2006, of the drive lanes and parking stalls, portico, pedestrian use areas (including walks and open space, pool, deck, courtyard area) and the parking garage, etc. However, the applicant shall provide the following, for conformance with said Ordinance 26, 2006 and the City's lighting standards. a. Satisfied. The applicant provided lighting level data for the pedestrian use areas including; i. All walkways and pathways (to back of walk/path). ii. The accessible route from USH 1 to the entry and along the west side of the garage. b. Satisfied. The applicant revised the numeric summary to indicate separate values for the pedestrian areas, in addition to the property line, parking area and pool area which are shown. c. Satisfied. The applicant clarified the illumination proposed for the • courtyard area. P:\PBGMEMO \16792 \16792 - 20070725 - PUDA- 07- 03- 005.doc lbf Waterford Hotel Page 5 of 10 LBFH File No. 16792 hC. L_J • • d. Satisfied. The applicant clarified that the courtyard is to be accessible to the hotel guests. e. Satisfied. The applicant clarified the illumination proposed for the courtyard area. f. Satisfied. The applicant revised the engineering plan, site plan and landscape plan for consistency with the photometric plans as to the proposed location of lighting fixtures. 19. Previously Satisfied. 20. Satisfied. The applicant provided a sign to identify that the ingress traffic is to keep right at the rotary (Sheet 1 of 5). However, the following is noted; a. Satisfied. The applicant relocated the "Do Not Enter" sign to the rotary island for better visibility to entering traffic. Comments 21 & 22 Previously Satisfied. 23. Satisfied. The applicant verified that the proposed CR -10 ramp (Sheet 1 of 3), for the front entry drop off area, conforms to the requirements noted in FDOT Index 304. a. Satisfied. The applicant revised the architectural plan for consistency with the engineering, site plan and landscape plan, regarding the curb ramp. Comments 24 thru 26 Previously Satisfied. Waiver Requests 1. The applicant is requesting a waiver from Section 78 -344 of the LDR regarding parking stall widths. Please note we remain in support of the City's LDR requirements. 2. The applicant is requesting a waiver from Section 78 -153 of the LDR regarding setback requirements. Please note we remain in support of the City's LDR requirements. 3. The applicant is requesting a waiver from Section 78 -153 of the LDR regarding building height. Please note we remain in support of the City's LDR requirements. 4. The applicant is requesting a waiver from Section 78 -186 of the LDR regarding landscape buffer for commercial parcel abutting residential parcel. Please note we remain in support of the City's LDR requirements. P:\PBGMEMO \16792 \16792 - 20070725 - PUDA- 07- 03- 005.doc Waterford Hotel Page 6 of 10 L LBFH File No. 16792 h 5. Previous Waiver Request Withdrawn by Applicant. The applicant is • requesting a waiver from Section 78 -80 of the LDR regarding requirement for topographic map with one (1') foot contours. Please note we remain in support of the City's LDR requirements. The applicant has provided a topographic map with spot elevations. Additional Waiver Requests 6. The applicant is requesting a waiver from Section 78 -362 of the LDR regarding a 12' x 35' loading zone with a 12' x 35' maneuvering area. The applicant is proposing to utilize the existing 10.5' x 32.5' loading zone (as noted in Certification Comment #5). Please note we remain in support of the City's LDR requirements. Non - Certification Issues NOTE: All engineering/infrastructure plans are considered conceptual during the planning and zoning review phase and are subject to further review during the final construction review. These non - certification comments shall be satisfied prior to construction plan approval and the issuance of the first land alteration permit. • 1. Satisfied. The applicant shall dimension the engineering plan or provide a horizontal control plan, which provides "complete horizontal control of the project sufficient to construct the project and determine the dimensions of all site improvements" in accordance with Section 78 -448 of the LDR. The applicant is advised of the following; a. Satisfied. The applicant revised the label for the "20' R" of the south curb line of the rotary entry drive does not coincide with the location of the 20' radius. b. Satisfied. The applicant dimensioned the radius of the west curb on the south side of the rotary, entering the parking area, is not labeled. c. Satisfied. The applicant dimensioned the radius of the curb at the north handicap parking stall. Comments 2 thru 5 Previously Satisfied. 6. Not Satisfied. The applicant shall identify all curb ramps with the appropriate FDOT Index 304 CR numbers for each location. The applicant shall identify the curb ramp numbers for the handicap stall locations. The applicant is advised of the following; • P:\PBGMEMO \16792 \16792 - 20070725 - PUDA- 07- 03- 005.doc hINC. U • Waterford Hotel LBFH File No. 16792 Page 7 of 10 a. Not Satisfied. The applicant shall clarify if the south access aisle for the handicap stalls has an existing or proposed curb ramp. If proposed the applicant shall so label with the FDOT Index 304 CR #. The applicant identifies the curb ramp to be a CR #3. However, the CR #3 has a back curb. As the accessible entry walk to the building is at this point, a CR #3 will not provide handicap accessibility to the building. The applicant shall revise the ramp designation to provide handicap accessibility. Comments 7 thru 11 Previously Satisfied. 12. Previously Satisfied. The applicant has indicated the structural numbers for the `Asphalt Section' details on the Engineering Detail Sheet in accordance with Section 78 -499 Table 41 of the LDR. The applicant provided a table indicating the layer, material, LBRIFBV, material thickness, FDOT layer coefficient; the SN for the pavement section, base section, and subgrade section; and the total SN for the total pavement section and the required SN in accordance with the FDOT Flexible Design Manual. a. Previously Satisfied. The applicant previously revised their SN data on the plan for consistency with the proposed SN of 4.52 as noted in the FDOT ROW — USH 1 table above. 13. Not Satisfied. Prior to the issuance of the first land alteration permit, the applicant shall provide a copy of the following approved permits, as applicable: a. Not Applicable. SFWMD — Applicant indicates that project fall under "No Notice" rule. PAPBGMEM0\16792 \16792 - 20070725 - PUDA- 07- 03- 005.doc hINC� U U • Waterford Hotel Page 8 of 10 LBFH File No. 16792 b. Not Applicable. NPBCID — Applicant indicates this project is not within NPBCID. c. Not Applicable. PBC - Applicant indicates this project is "Not Applicable." d. Not Satisfied. FDOT — Applicant has provided an application for the FDOT Driveway Connection Permit and indicates they will provide a copy of the permit upon receipt. e. Not Applicable. PBC Health Department/FDEP- Applicant indicates this project is "Not Applicable." f. Not Applicable. NPDES- Applicant indicates this project is "Not Applicable ", as construction activities of the project totals less than one (1) acre. 14. Not Satisfied. The applicant shall provide a cost estimate for the project, including public infrastructure and all landscaping and irrigation costs for review and approval by the City in order to establish surety. The cost estimate shall be signed and sealed by an engineer and landscape architect registered in the state of Florida. Surety will be based on 110% of the total combined approved cost estimates and shall be posted with the City, prior to the issuance of the first land alteration permit. SUMMARY OF ENGINEER'S ESTIMATE of Probable Construction Costs for On -site and Off -site Public Improvements Grading & Paving $0.0 Sanitary Sewer $0.0 Water $0.0 Storm Water Maintenance $0.0 Signing & Pavement Markin $0.0 Subtotal $0.0 Landscaping Irrigation Subtotal Total 110 %Total Required Surety The applicant indicates that there will be no public infrastructure and the landscape cost estimate will be submitted under separate cover. This item will remain unsatisfied until the landscaping cost estimate is received and reviewed by the City. 15. Satisfied. The applicant provided a cost estimate for the on -site project improvements, not including public infrastructure, landscaping and irrigation costs (which were previously submitted by the applicant) for review and approval by the City. The cost estimate is signed and sealed by an engineer and shall be posted with the City prior to the issuance of the first land alteration permit. P:\PBGMEMO \16792 \16792 - 20070725 - PUDA- 07- 03- 005.doc hINC, U • • Waterford Hotel LBFH File No. 16792 SUMMARY OF ENGINEER'S ESTIMATE of Probable Construction Costs for On -site Non Public Im rovements Grading $56,059.5 Sanitary Sewer $0.0 Water $1,840.0 Storm Water Maintenance $5,450.00 Signing & Pavement Marking $8,578. otal $71,927.5 16. Previously Satisfied. Page 9 of 10 17. Not Satisfied. The applicant shall revise the plans to indicate an acceptable pipe material, such at RCP or FRCP for drainage pipes under all load bearing pavement areas, with the exception of exfiltration areas. Specifically, the line from the courtyard to the inlet in the parking area east of the building. City policy requires RCP under all load bearing surfaces. The applicant shall revise the plans to so indicate. 18. Satisfied. The applicant modified the label on the site plan, referencing the paver area of the pool deck, for consistency with the engineering plan, which indicates that the paver deck is "existing ". Conditions of Approval 1. "Applicant shall copy to the City all permit applications, permits, certifications and approvals. " (City Engineer) 2. "Applicant shall provide all necessary construction zone signage and fencing as required by the City Engineer. " (City Engineer) 3. "Prior to construction plan approval and the issuance of the first land alteration permit, applicant shall provide a cost estimate and surety in accordance with LDR Section 78 -309 and 78 -461 and a cost estimate for on- site project improvements, not including public infrastructure, or landscaping and irrigation costs for review and approval by the City. The cost estimates shall be signed and sealed by an engineer and landscape architect registered in the state of Florida and shall be posted with the City, prior to the issuance of the first land alteration permit. " (City Engineer) 4. "The construction, operation and /or maintenance of any elements of the subject project shall not have any negative impacts on the existing drainage of surrounding areas. If, at any time during the project development, it is determined by the City that any of the surrounding areas are experiencing negative drainage impacts caused by the project, it shall be the applicant's responsibility to cure said impacts in a period of time and a manner acceptable to the City prior to additional construction activities. " (City Engineer) P:\PBGMEMO \16792 \16792 - 20070725 - PUDA- 07- 03- 005.doc Waterford Hotel Page 10 of 10 LBFH File No. 16792 INC. 5. "Prior to issuance of the first land alteration permit, applicant shall submit • signed/sealedldated construction plans (paving /grading /drainage and water /sewer) and all pertinent calculations for review and comment. (City Engineer) 6. "Applicant shall comply with any and all Palm Beach County Traffic Division conditions as outlined in PBC Traffic Division equivalency and concurrency approval letters. " (City Engineer) 7. "Prior to construction plan approval and the issuance of the first land alteration permit, applicant shall schedule a pre - permit meeting with City staff. " (City Engineer) 8. "Prior to the issuance of the first land alteration permit the applicant shall provide to the City letters of authorization from the applicable utility companies allowing landscaping and light poles to be placed within the utility easements. " (City Engineer) 9. "Applicant shall notify the City's Public Works Division at least 10 working days prior to the commencement of any worklconstruction activity within any public right -of -way within the City of Palm Beach Gardens. In the case of a city right -of -way, the applicant has at least five working days to obtain a right -of- way permit. Right -of -way permits may be obtained at the Building Division. • Failure to comply with this condition could result in a Stop Work Order of all worklconstruction activity within the public right -of -way and the subject development site. " (Public Works) The applicant is requested to return a copy of our comments with the applicant's acknowledgement of each comment and the response. Compliance will expedite the subsequent review. The applicant is reminded that all submittals are to be made to the City of Palm Beach Gardens Growth Management Department. JRO /mef cc: Todd Miller — Palm Beach Gardens (tmiller@pbgfl.com) • PAP13GMEMO \16792 \16792 - 20070725 - PUDA- 07- 03- 005.doc LbF hINC. CONSULTING CIVIL ENGINEERS, SURVEYORS & MAPPERS MEMORANDUM TO: Jackie Holloman FROM: Jim Orth, P.E. DATE: July 17, 2007 FILE NO. 16792 SUBJECT: Waterford Hotel Traffic Impact Analysis Palm Beach County Traffic Division and the City's traffic consultant, MTP Group, Inc., have completed their coordinated review of the Traffic Impact Analysis for the above referenced project prepared by Kimley Horn & Associates, Inc. dated February 2, 2007 and received March 22, 2007 pursuant to the Palm Beach County Traffic Performance Standards and the City of Palm Beach Gardens Land Development Regulations for the above referenced project. Their review concludes that the based on the information included in the traffic impact analysis, the project is in compliance with the City of Palm Beach Gardens Development Regulations. Additionally, CIVIL The build out date is December 31, 2008. AGRICULTURAL ATER RESOURCES WER & WASTEWATER A copy of Palm Beach County Traffic Division's comment memorandum, dated TRANSPORTATION April 20, 2007 is attached, along with a copy of MTP Group's coordinated SURVEY & MAPPING comment memorandum dated April 19, 2007. GIS If you have any questions or require additional information, please do not hesitate to contact me at (561) 799 -4129. JOR/mef "Partners For Results Value By Design" cc: Todd Miller — Palm Beach Gardens (tmiller @pbgfl.com) Maria Tejera — MTP Group — (mtejera @mtpgroup.net) Masoud Atefi — PBCTD (matefi @co.palm - beach.fl.us) OF PAL'1A B C H G )N �ITY 0 S.W. Corporate Pk r O 1 2� Palm City, FL 34990 (772) 286 -3883 Fax (772) 286 -3925 ��,'' I�y�� }!I� *y�; 1~�l6 .. t., www.lbfh.com PA\P13GMEM0\16792 \16792 - 20070717 - MTP comments to City.doc � G e�� �,AC$ C LORI�/ Department of Engineering and Public Works P.O. Box 21229 West Palm Beach, FL 33416•1229 (561)684.4000 Fax: (561)000.0000 www.pbcgov.com 8 Palm Beach County Board of County Commissioners ddie L Greene. Chairperson 0 Jeff Koons, vice Chair • Karen T. Marcus Warren H. Newell Mary McCarty Burt Aaronson Jess R. Santamaria County Administrator Robert Weisman 'An h-quul Opprrum'), rl / %irinnn i •e : tr'ni�n /:bip;or •�• " prin too on recycled paper April 20, 2007 Ms. Judy Dye Assistant City Engineer City of Palm Beach Gardens 3550 S.W. Corporate Pkwy. Palm City, FL 34990 RE: Waterford Hotel Restaurant Project #: 070332 TRAFFIC PERFORMANCE STANDARDS REVIEW Dear Ms. Dye: The Palm Beach County Traffic Division has reviewed the traffic statement for the proposed hotel expansion project entitled; Waterford Hotel Restaurant, pursuant to the Traffic Performance Standards in Article 15 of the Palm Beach County Land Development Code. The project is summarized as follows: Location: East of US -1 South of PGA Boulevard, Municipality: Palm Beach Gardens Existing Uses: 77 Rooms Hotel, and 1,710 SF Quality Restaurant (to be closed) — in place for over 5 years. Proposed Uses: Addition of 13 Rooms — total 90 Rooms Hotel New Daily Trips: Trip Reduction New PH Trips: 7 AM and Trip Reduction PM Build -out Year: 2008 Based on our review, the Traffic Division has determined that the proposed change does not have a significant impact on the adjacent roadway network, and therefore, meets the Traffic Performance Standards of Palm Beach County. The County traffic concurrency approval is subject to the Project Aggregation Rules set forth in the Traffic Performance St9 dards Orriinl ce If yo,-- hcvs un.r qucsti rely rd!ng this -+eter.nination. l.ea:.-. ._.n -.... n..-.. � •� y.,,,,,,.OriJ ��.yc:�vu�y i�n;i u'v.Cinuuu�,vi�, riGUOG contact me at 684 -4030. Sincerely, / 1 Masoud Atefi, MSCE TPS Administrator - ffic Division CC: Kimley -Horn & Associates, Inc. MTP Group File: General - TPS • Mun - Traffic Study Review F: \TRAFFIC \ma\Admin\Approvals \2007 \070332.doc 0 Memo to File To: Jackie Holloman, Planner Through: Mark Hendrickson, City Forester From: Ray Caranci, Forestry Technician Subject: PUDA- 03 -07 -05 Waterford Hotel Resubmittal2 Date: June 5, 2007 I have reviewed the Land Development Regulations for the above referenced petition and provide the following comments: 1. Several existing trees are not shown on the landscape plan that are directly affected by the proposed alterations to the paved areas. Please indicate and identify all trees that will be within the scope of construction, and indicate whether they will be removed or relocated. The mature royal palms at the front of the building and behind the monument sign are of special concern. There is also • one oak tree that is directly in the path of the proposed northern exit. Satisfied. 2. In accordance with section 78- 320(a) (4) c. of the LDR, non residential buildings shall have at least one shade tree or palm cluster installed for each 30 linear feet, or fraction thereof, of fagade width. Trees and palms shall be of an installed size relating to the height of the adjacent wall or fagade, as indicated in Table 30. Please revise the landscape plan to include the required number of trees. or palm clusters for the west fagade of the north building. We would suggest utilizing the existing mature Royal palms. Satisfied. 3. In accordance with Section 78 -315 (b) of the LDR, landscape islands are required for every nine parking spaces located in a row. There are existing diamond planters located around the parking lot edge that should be utilized at this time to fulfill this requirement. Also, there are three landscape diamonds abutting the rear of the pool area that should be shown on the plan with palms or shrubs indicated in them. Satisfied. 4. In accordance with Section 78 -305 (c) 7 d.[78 -287 (c)] of the LDR, landscaping requirements for signs, minimum widths of front and side landscaping should equal the height of the sign. Please provide details to verify the landscape area is adequate. Satisfied. is 5. The sizes of the Coconut palms do not meet the minimum required height of 8 • feet GW. Please revise the plan to increase their size to the minimum required. Satisfied. Given that these have been indicated as relocated existing palms. 6. Please indicate what will be covering the ground in the courtyard area. If it is to be sod, please label it as such. Satisfied. 7. Please provide a note on cleaning up or replacing any existing landscaping that is damaged or unhealthy. Mulch is required in all landscaped areas. Satisfied. Also, please understand that additional information may be requested, and staff may have additional comments as the review process continues. • is ii o> ftl G, y. 1] 0 Mz U11Y OF PALM;` K" GARDENFS'i 10500 N. MILITARY TRAIL PALM BEACH GARDENS, FLORIDA 334104698 FIRE RESCUE DEPARTMENT MEMORANDUM TO: Jackie Holloman, Planner DATE: July 18, 2007 APPROVED: FROM: Scott Fetterman, Deputy Chief RE: PUDA- 070 -3- 000005: Waterford/Wyndham Gardens Hotel Fire Rescue has reviewed the above referenced revised PUD Amendment petition and has no adverse comments or concerns. Thank you for your assistance and consideration in this matter. Please contact me if you have any questions or any future changes are proposed. I PALM BEACH GARDENS POLICE DEPARTMENT SPECIAL OPERATIONS BUREAU 0 INTEROFFICE MEMORANDUM TO: JACKIE HOLLOMAN, AICP PLANNER FROM: OFFICER JULES BARONE /OFFICER TARA HEADMAN SUBJECT: WATERFORD HOTEL PUD AMENDMENT 07 -03- 000005 DATE: JULY 18, 2007 The police department has reviewed the applicant's re- submittal package dated July 17, 2007. The police department has no adverse comments provided the applicant adheres to all the previously discussed CPTED requirements including a security site plan which shall be submitted to the police department prior to commencement of construction. • cc: Chief S. Stepp Files • .7 July 20, 2007 Ms. Jackie Holloman Planning & Zoning Division City of Palm Beach Gardens 10500 North Military Trail Palm Beach Gardens, FL 33410 RE: Waterford/Wyndham Garden Hotel PUD Amendment Dear Ms. Holloman: We offer the following comment on your transmittal dated July 17, 2007 concerning the referenced project. The applicant needs to revise the landscape plans and provide a root • barrier at the backflow preventer and meter located in the southerly Seacoast easement. Please call if you require additional information. Sincerely, SEACOAST UTILITY AUTHORITY Bruce Gregg Director of Operations M cc: R. Bishop J. Callaghan J. Lance J. Orth • 0 0 0 JIM M Fri ZS a. ■ a w j _m p ■ a / •�a i4 Y Z Wyndham Garden Hote /o� c N' mm � ♦ J o LI 88 Addition Renovation D a v. Vie' Palm 8 each Gardens, FL � m oQ > � y xxT� i� €tNssiom y"'�`mm nY m S n R S M �T " � W Y fv U.S. HIGHWAY 1 O . P IF3 n W —I• o `� J I� z `\o S z rncN C U.S.H /GH IAY1 - - - - - -_ Ai o he ��♦ - ♦ 3 //�� n z I 1 �N� �: � (��� ._� »a✓ v� . � III �o II _ y 9 cN - �' 0 L II - 1 L- N_ p g -81A a 4 f m g a p )Z v P m 1 ig o T�� __ N u m 9 ti lu ti ml li g ? SAC Ro oL'Z Gzi 7o Ac C � o Dr Z n - + r� L) ` y � 1 I�..- I T i Z II � o c II $ II ' NC V t Q AL 0 II -II OK �J i P c (2 �--V a' W" $��° �Ap s ?� 0 ` O W Q � >I 1 � ' � I I I I I S � I � i I IVO "5/'507 793,08' a n� 0 =z g �O ' m S Ch .0 -1 V <o Nm m0 V r -I<NmI- a 20 '� z z; mm� nO�D vD O (o�"^.Z1pc3 cam0 Or^mc O com O ccy xx5o 7pC D c �' (� T m O m C -Tn Z< D m o m O F m m D A m m f7 r C1 2 (� O rmo-C 2 rmnNrvF zN� o�> xczio ONnNm a �Om $rAS3 a OOm cszi Gl nCa�i X00 �a 1, m I ,mO -',O�Z A CD (n 2z i Zm rc- D 0 m m 0 2aC 602 In c- 10 c m m�L+'m�>"+ c� D An m ➢ m A D ZmG1 Yr'i �� q y_ Ne n i y z Fj D m W D O > 0 a A r2 a C so ca- -z o�m m _ N ; A O A Im T T VI y T N �' d zn6�z pz9' O 00000D oOOD n V, °rnli+0 vin Q m - N v vs ai C, om �T� I� ado m m O Z A N z C N" N 2 OmF mP 0 Wymllum Gardens Hotel N F D Az C - -- mT Ox N �� N yz < 0 y V F Q�0 in -- DQ' m m Qo m ¢!Nn In Ng� c mWo N z JwgW N Palm Beach Gardens, Florida ^' m jjrx A y � ODO A m y 3 I N c v F- mn r m'o n m ; � � N Ic 0 � _ IM M�-8 ZX �n1 NO pp N m ���p777 m � np np�p 0 0 C 4 V z it y O R S M �T " � W Y fv U.S. HIGHWAY 1 O . P IF3 n W —I• o `� J I� z `\o S z rncN C U.S.H /GH IAY1 - - - - - -_ Ai o he ��♦ - ♦ 3 //�� n z I 1 �N� �: � (��� ._� »a✓ v� . � III �o II _ y 9 cN - �' 0 L II - 1 L- N_ p g -81A a 4 f m g a p )Z v P m 1 ig o T�� __ N u m 9 ti lu ti ml li g ? SAC Ro oL'Z Gzi 7o Ac C � o Dr Z n - + r� L) ` y � 1 I�..- I T i Z II � o c II $ II ' NC V t Q AL 0 II -II OK �J i P c (2 �--V a' W" $��° �Ap s ?� 0 ` O W Q � >I 1 � ' � I I I I I S � I � i I IVO "5/'507 793,08' a n� 0 =z g �O ' m S Ch .0 -1 V <o Nm m0 V r -I<NmI- a 20 '� z z; mm� nO�D vD O (o�"^.Z1pc3 cam0 Or^mc O com O ccy xx5o 7pC D c �' (� T m O m C -Tn Z< D m o m O F m m D A m m f7 r C1 2 (� O rmo-C 2 rmnNrvF zN� o�> xczio ONnNm a �Om $rAS3 a OOm cszi Gl nCa�i X00 �a 1, m I ,mO -',O�Z A CD (n 2z i Zm rc- D 0 m m 0 2aC 602 In c- 10 c m m�L+'m�>"+ c� D An m ➢ m A D ZmG1 Yr'i �� q y_ Ne n i y z Fj D m W D O > 0 a A r2 a C so ca- -z o�m m _ N ; A O A Im T T VI y T N �' d zn6�z pz9' O 00000D oOOD n V, °rnli+0 vin Q m - N v vs ai C, om �T� I� ado m ° �Nm TT Wymllum Gardens Hotel �3 dS � _ E4;7Y��t Palm Beach Gardens, Florida g" jjrx 3 OCi LL 0 Ln —4 A m C C3 C o 1 .1YA X n • T— ADM jig, mA CP '4 or Waterford Hotel 6, 3 rn .3 1� LL 0 Ln —4 A m C C3 C o 1 .1YA X n • T— N ZZ � Fm- 61 as R f 0 — --- 1� i ---1 .X Ow � k O as Ij ADM jig, '4 or Waterford Hotel 6, 3 rn .3 1� Cn Palm Beach Gardens, Florida J� J N ZZ � Fm- 61 as R f 0 — --- 1� i ---1 .X Ow � k O as Ij ADM jig, '4 or Waterford Hotel 6, 3 rn .3 1� Cn Palm Beach Gardens, Florida J� n d ��e�� � y We•g�trrg � .. WWI x 8as33.ya €�as�a2�c�6$Lj�g� 1-.1114 i 11 i Jill F HM 91 g � 1 ° dj� € wwww ?gwwww+ q -• � 'yY ww�uiy ;uuNUU - nO,YOw "Y ~o 777 >y� Nil ° N. v r`4w 9 $Q� -- I �I I 4 ti I 1i. 1. YYYY ttYYYY YY MY T »t > T \ I o or op NMpoo �^�^oo �^oo �n NInM��lr in i>n NNNH i T� I c�S ' 2 � I $ I 5 &g �Y •� > ,•may- R ego R yy a vVV`JJJ a I: S LS n A R � H a \ g FF R� g� Nil Cu J11 o° coc� 9� d I II N � 0 r` ` V RCN U.S. H/GYMAY 1 M p 9 U.S. HIGHWAY O AWLJN L C v cn i 3 3�N �cn cn` �n > v >�5go T _b \ z> °s 015 o � 0 i m a >d n ' ; W ► a� Wyndham Gardens Hotel 0 ^, w� �� � 3� C° ° �' 3 � ,o � Yw�� Palm Beach Gardens, Florida DL 3D Ul to rzi Z Z n O :Z A b 1 A 2 z m W -0� m m �x D� C7R > DZ rC G1D `—�1 LO emu' n� mm D �D vJ 'arnn ii �I II N C)) T C vb • op. O � I I I I I I ti I I I I I I I D � cv'i, c`n C n) D cn (p 0?5 D �(n (P m `D �3D,GZl O Z3 n D O G) O z 4 $b ;Rg R mRm g g° 30 4 fgg£ qg�§ � 'i i $a2 09 18 IMP q 9 M H 14 fP a _ 29 Q A Q i 5a S �� o v € c� �o3a T R r � � 8 ,� � �s °� R T�- Samwi gi $ egg Po�Go "m4S �i� 4 4 $ �ej iE ^p� _� -2 jig �i m O I8 I; A Wynclham Garalens Hotel C, "T J8. 3 lV _3 R> 1 m '1 Ln o9 Palm Beach Gardens, Florida S CD v € -'� Y'bMg�� z N co d �a 00 �i -1P �.AEa Ill- III '11111 r 1P � i1.I _� O M.a a aF Q M M v O M q O z 0 M D rh Zi � E sL 1 1Tj : Ee e z R: rn � 15 Z � O O ti r D �7 O M M M M m D z z O �e S fiR n�ri n4�4 z n N Telc Ego —> gam. dR " " =x g 9A yt;x C .7 5�re as �o >11 ¢t` ix a �Cf a §Eat 5� i O y N T� N M M v Wynalliam Gardens Hotel s =� R3 � O M zJ n ..Q O z 0 M D F E 9x n N Telc Ego —> gam. dR " " =x g 9A yt;x C .7 5�re as �o >11 ¢t` ix a �Cf a §Eat 5� i O y N a1� F �+ 8� Wa:i Wynalliam Gardens Hotel s =� R3 � Palm Beach Gardens, Florida .._ ..Q a1� F �+ 8� Wynalliam Gardens Hotel s =� R3 � Palm Beach Gardens, Florida .._ �i -Jqj O m z D n m O z � m 0 u) n � D D � n M m O Cn U) O I � � I 'I I I 10 I o m I D I I I I AI a e R IF 4 : R O D r V) m D m D v m O v m O C n Jill, WyndhalV Gaalens Hotel 0 3s & R Palm Beach Gardens, Florida 3 = v e � C }rpp Ny�pP SrrE PLAN E�l 01 `]?, r v r . • PRELIMINARY DESIGN WYNDHAM GARDEN HOTEL ADDITION RENOVATION A .;PA�ES, LOT 7 PALM BEACH COUNTY FLORIDA loommolou 1 09 �p 4j IIIIIIIIO .... ......... . . ... .... . . .... FLOOR PLAN to PRELIMINARY DESIGN 117 7 F WYNDHAM GARDEN HOTEL ADDITION RENOVATION AMENS LOT 7 Ift PALM , rrrFwunau 8 EACH COUNTY FLORIDA mz oc FLOOR PLAN to PRELIMINARY DESIGN 117 7 F WYNDHAM GARDEN HOTEL ADDITION RENOVATION AMENS LOT 7 Ift PALM , rrrFwunau 8 EACH COUNTY FLORIDA mz IIIIIIII�, 'gj g, I_ j �Iro 1 I I II ,� II I II A i 1 n� �n Vt.:!• I, :1 n i rn (e1�7 Irt Ix t °- I Jill M i. 4 - N _ r Z ry III al 1 1 1 1 11 — O E n IL j LL L4 a � •II III I D i I IIII IIII IIII IIII i1 IIII IIII c a r a D � z PRELIMINARY DESIGN WINDSOR HOTEL ADDITION RENOVATION AMES LOT 7 DESIGN MFN.,HH4 PALM BEACH COUNTY FLORIDA • IIIIIIII� z� je D A d m . I W �BUII.DING ELEVATIONS 9 A II Ili Fits ;r I z m r F v• fit D L l T - PRELIMINARY DESIGN i WYNDHAM GARDEN HOTEL ADDITION RENOVATION AMA LOT 7 I DESIGN MPM�npvµ PALM BEACH COUNTY FLORIDA 7 iiiinnu BUILDING STREET ELEVA VI - 1 z z 3> iin 7Z01 m 11 4 TIONS PRELIMINARY DESIGN WYNDHAM GARDEN HOTEL ADDITION RENOVATION —A M�E S DESIGN LOT 7 PALM BEACH COUNTY FLORIDA Jh I 011110 Imp • • 11151 L-1 I IF1 PRELIMINARY DESIGN WYNDHAM GARDEN HOTEL ADDITION RENOVATION LOT 7 PALM BEACH COUNTY FLORIDA Date Prepared: March 4, 2005 0, ORDINANCE 13, 2005 2 3 4 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PALM 5 BEACH GARDENS, FLORIDA AMENDING ORDINANCE 53, 1988, 6 ORDINANCE 18, 1992, AND ORDINANCE 14, 1996 RELATING TO 7 THE ZONING FOR THE WATERFORD HOTEL PLANNED UNIT 8 DEVELOPMENT (PUD) TO TRANSFER THE SITE PLAN 9 APPROVAL AND RELATED CONDITIONS TO RESOLUTION 44, 10 2005; AND PROVIDING AN EFFECTIVE DATE. 11 12 13 WHEREAS, on February 16, 1988, the City Council adopted Ordinance 53, 14 1988, thereby approving the Garden Suites Planned Unit Development (PUD); and 15 16 WHEREAS, on August 6, 1992, the City Council adopted Ordinance 18, 1992, 17 thereby approving an amendment to the Comfort Inn PUD to allow for the construction 18 of a swimming pool building; and 19 20 WHEREAS, on November 21, 1996, the City Council adopted Ordinance 14, 21 1996, thereby approving an amendment to the Comfort Inn PUD to allow for the 22 construction of a two -story, 7,507 square -foot ancillary building; and 4 WHEREAS, the City has received a request (PUD- 04 -10) from Mr. Marty Minor 25 of Urban Design Studio, on behalf of Savol of Florida Inc., for approval of an 26 amendment to the Waterford PUD to allow for the inclusion of a 1,710 square -foot 27 restaurant; and 28 29 WHEREAS, the Growth Management Department has reviewed said application, 30 and has determined that it is more appropriate that the site plan approval and the 31 conditions related thereto be transferred to Resolution 44, 2005 of the City Council; and 32 33 WHEREAS, the City Council has considered the evidence and testimony 34 presented by the Petitioner and other interested parties and the recommendations of 35 the various City of Palm Beach Gardens review agencies and staff; and 36 37 WHEREAS, the City Council has determined that adoption of this Ordinance is in 38 the best interest of the citizens and residents of the City of Palm Beach Gardens. 39 40 41 NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY 42 OF PALM BEACH GARDENS, FLORIDA that: 43 44 SECTION 1. The foregoing recitals are hereby affirmed and ratified. 45 0 46 Date Prepared: March 4, 2005 Ordinance 13, 2005 eSECTION 2. Section 1 of Ordinance 53, 1988 is amended to read: The zoning 2 of the following described property known as the Waterford Hotel is hereby designated 3 as a A Planned Unit Development (PUD) Overlay with an underlying zoning of General 4 Commercial (CG -1): be and the same i6_ h8Feby Greated upen the lands known as 5 "GARDENS SLATES HOTEL" 15 16 LEGAL DESCRIPTION: 17 18 ALL THAT PORTION OF GOVERNMENT LOT 7 SECTION 4 TOWNSHIP 42 SOUTH 19 RANGE 43 PALM BEACH COUNTY FLORIDA LYING EAST OF THE EAST RIGHT - 20 OF -WAY LINE OF STATE ROAD NO. 5 (U.S. HIGHWAY NO 1), AS NOW LAID OUT 21 AND IN USE LESS THE NORTH 734.42 FEET THEREOF AND ALSO LESS THE 22 SOUTH 274.67 FEET THEREOF AND MORE PARTICULARLY DESCRIBED AS FOLLOWS: 4W4 25 COMMENCING AT THE INTERSECTION OF THE NORTH LINE OF SAID 26 GOVERNMENT LOT 7 AND THE EASTERLY RIGHT -OF -WAY LINE OF SAID STATE 27 ROAD NO. 5 THENCE SOUTH 16 051'25" WEST ALONG SAID RIGHT-OF-WAY,A 28 DISTANCE OF 612.69 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE 29 EAST HAVING A RADIUS OF 1,850.09 FEET AND A PARTIAL CENTRAL ANGLE OF 30 04 015'09" THENCE SOUTHWESTERLY ALONG THE ARC OF SAID CURVE,A 31 DISTANCE OF 137.31 FEET TO THE POINT OF BEGINNING THENCE CONTINUE 32 SOUTHERLY ALONG THE ARC OF SAID CURVE, WITH A PARTIAL CENTRAL 33 ANGLE OF 09 019'36, A DISTANCE OF 301.16 FEET TO A POINT ON A LINE LYING 34 274.67 FEET NORTH OF (WHEN MEASURED AT RIGHT ANGLES TO) AND 35 PARALLEL WITH THE SOUTH LINE OF SAID GOVERNMENT LOT 7• THENCE 36 SOUTH 86 052'35" EAST ALONG THE SAID PARALLEL LINE A DISTANCE OF 283.51 37 FEET TO A POINT ON THE EAST LINE OF SAID GOVERNMENT LOT 7• THENCE 38 NORTH 01 051'50" EAST, ALONG THE EAST LINE OF SAID GOVERNMENT LOT 7, A 39 DISTANCE OF 292.45 FEET TO A POINT ON A LINE LYING 734.42 FEET SOUTH OF 40 (WHEN MEASURED AT RIGHT ANGLES TO) AND PARALLEL WITH THE NORTH 41 LINE OF SAID GOVERNMENT LOT 7 THENCE NORTH 85 012'07" WEST ALONG 42 SAID PARALLEL LINE, A DISTANCE OF 251.91 FEET TO THE POINT OF 43 BEGINNING. 44 45 D io Mai 15 16 LEGAL DESCRIPTION: 17 18 ALL THAT PORTION OF GOVERNMENT LOT 7 SECTION 4 TOWNSHIP 42 SOUTH 19 RANGE 43 PALM BEACH COUNTY FLORIDA LYING EAST OF THE EAST RIGHT - 20 OF -WAY LINE OF STATE ROAD NO. 5 (U.S. HIGHWAY NO 1), AS NOW LAID OUT 21 AND IN USE LESS THE NORTH 734.42 FEET THEREOF AND ALSO LESS THE 22 SOUTH 274.67 FEET THEREOF AND MORE PARTICULARLY DESCRIBED AS FOLLOWS: 4W4 25 COMMENCING AT THE INTERSECTION OF THE NORTH LINE OF SAID 26 GOVERNMENT LOT 7 AND THE EASTERLY RIGHT -OF -WAY LINE OF SAID STATE 27 ROAD NO. 5 THENCE SOUTH 16 051'25" WEST ALONG SAID RIGHT-OF-WAY,A 28 DISTANCE OF 612.69 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE 29 EAST HAVING A RADIUS OF 1,850.09 FEET AND A PARTIAL CENTRAL ANGLE OF 30 04 015'09" THENCE SOUTHWESTERLY ALONG THE ARC OF SAID CURVE,A 31 DISTANCE OF 137.31 FEET TO THE POINT OF BEGINNING THENCE CONTINUE 32 SOUTHERLY ALONG THE ARC OF SAID CURVE, WITH A PARTIAL CENTRAL 33 ANGLE OF 09 019'36, A DISTANCE OF 301.16 FEET TO A POINT ON A LINE LYING 34 274.67 FEET NORTH OF (WHEN MEASURED AT RIGHT ANGLES TO) AND 35 PARALLEL WITH THE SOUTH LINE OF SAID GOVERNMENT LOT 7• THENCE 36 SOUTH 86 052'35" EAST ALONG THE SAID PARALLEL LINE A DISTANCE OF 283.51 37 FEET TO A POINT ON THE EAST LINE OF SAID GOVERNMENT LOT 7• THENCE 38 NORTH 01 051'50" EAST, ALONG THE EAST LINE OF SAID GOVERNMENT LOT 7, A 39 DISTANCE OF 292.45 FEET TO A POINT ON A LINE LYING 734.42 FEET SOUTH OF 40 (WHEN MEASURED AT RIGHT ANGLES TO) AND PARALLEL WITH THE NORTH 41 LINE OF SAID GOVERNMENT LOT 7 THENCE NORTH 85 012'07" WEST ALONG 42 SAID PARALLEL LINE, A DISTANCE OF 251.91 FEET TO THE POINT OF 43 BEGINNING. 44 45 D Date Prepared: March 4, 2005 Ordinance 13, 2005 •1 SECTION 3. Sections 2 through 8 inclusive of Ordinance 53, 1988; Sections 1 2 and 2 inclusive of Ordinance 18, 1992; and Sections 2 and 3 inclusive of Ordinance 14, 3 1996 are hereby transferred to Resolution 44, 2005. The remaining sections of 4 Ordinance 53, 1988, Ordinance 18, 1992, and Ordinance 14, 1996 shall be renumbered 5 accordingly. Any future amendments to the development plans and /or conditions of 6 approval shall be accomplished by Resolution of the City Council. 7 8 SECTION 4. This Ordinance shall become effective immediately upon adoption. 9 10 11 12 13 14 (The remainder of this page left intentionally blank) 15 16 17 18 19 20 21 22 a 3 4 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 046 3 Date Prepared: March 4, 2005 Ordinance 13, 2005 0 PASSED this P _day of mp-L , 2005, upon first reading. 2 3 4 PASSED AND ADOPTED this S"' day of _ , 2005, upon second 5 and final reading. 6 7 CITY OF P BEAC :'GARDENS 8 I 9 BY: _ i r i 7 19 10 os or 12 13 Eric in, i 15 ayor 14 i �� 16 Dav' evy, C cilmember 18 Cf 19 RaM. Valeche, C uncilmemb 20 21 Jody B melt, uncilmember 3 24 25 ATTEST: 26 27 28 BY: 29 Patricia Sn-ider, CMC 30 City Clerk 31 32 33 APPROVED AS TO FORM AND 34 LEGAL SUFFICIENCY 35 36 37 BY: i 38 hristine P. Tatum, City Attomey 39 40 41 42 43 44 FOR AGAINST ABSENT 0 5 6 G:\attorney _share \ORDINANCES \waterford hotel - ord 13 2005.doc LI �J C7 is Date Prepared: March 4, 2005 Revised Ap617, 2005 1 RESOLUTION 44, 2005 2 3 4 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM 5 BEACH GARDENS, FLORIDA APPROVING AN AMENDMENT TO 6 THE WATERFORD HOTEL PLANNED UNIT DEVELOPMENT 7 (PUD), WHICH IS LOCATED APPROXIMATELY 1 /10TH OF A MILE 8 SOUTH FROM PGA BOULEVARD ON THE EAST SIDE OF US 9 HIGHWAY ONE, TO ALLOW FOR THE INCLUSION OF A 1,710- 10 SQUARE -FOOT RESTAURANT INTO THE PUD, AS MORE 11 PARTICULARLY DESCRIBED HEREIN; PROVIDING FOR 12 WAIVERS; PROVIDING FOR CONDITIONS OF APPROVAL; AND 13 PROVIDING AN EFFECTIVE DATE. 14 15 16 WHEREAS, on February 16, 1988, the City Council adopted Ordinance 53, 17 1988, thereby approving the Garden Suites Planned Unit Development (PUD); and 18 19 WHEREAS, on August 6, 1992, the City Council adopted Ordinance 18, 1992, 20 thereby approving an amendment to the Comfort Inn PUD to allow for the construction 21 of a swimming pool building; and 22 23 WHEREAS, on November 21, 1996, the City Council adopted Ordinance 14, 24 1996, thereby approving an amendment to the Comfort Inn PUD to allow for the 25 construction of a two -story, 7,507- square -foot ancillary building; and 26 27 WHEREAS, on December 1, 2003, the Code Enforcement Special Master 28 determined that the existing restaurant at the Waterford Hotel was not an approved use, 29 and found the Waterford Hotel PUD in violation of City Code Sections 6646 and 78-49; 30 and 31 32 WHEREAS, the City has received a request (PUD- 04 -10) from Mr. Marty Minor 33 of Urban Design Studio, on behalf of Savol of Florida Inc., for approval of an 34 amendment to the Waterford PUD to allow for the inclusion of a 1,710- square -foot 35 restaurant; and 36 37 WHEREAS, the Growth Management Department has reviewed said application, 38 has determined that it is sufficient and is consistent with the City's Land Development 39 Regulations, and has recommended approval; and 40 41 WHEREAS, by adoption of Ordinance 13, 2005, the City Council determined that 42 the site plan approvals and related conditions for the Waterford Hotel PUD contained in 43 Ordinance 53, 1988, Ordinance 18, 1992, and Ordinance 14, 1996 shall be transferred 44 to this Resolution; and 45 46 11 • • Date Prepared: March 4, 2005 Resolution 44, 2005 1 WHEREAS, the City Council has considered the evidence and testimony 2 presented by the Petitioner and other interested parties and the recommendations of 3 the various City of Palm Beach Gardens review agencies and staff; and 4 5 WHEREAS, the City Council has determined that adoption of this Resolution is in 6 the best interest of the citizens and residents of the City of Palm Beach Gardens. 7 8 9 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY 10 OF PALM BEACH GARDENS, FLORIDA that: 11 12 SECTION 1. The foregoing recitals are hereby affirmed and ratified. 13 14 SECTION 2. The amended development plans for the Waterford Hotel PUD are 15 hereby APPROVED on the following described real property, subject to the conditions of 16 approval provided herein: 17 18 LEGAL DESCRIPTION: 19 20 ALL THAT PORTION OF GOVERNMENT LOT 7, SECTION 4, TOWNSHIP 42 SOUTH, 21 RANGE 43, PALM BEACH COUNTY, FLORIDA, LYING EAST OF THE EAST RIGHT - 22 OF -WAY LINE OF STATE ROAD NO. 5 (U.S. HIGHWAY NO, 1), AS NOW LAID OUT 23 AND IN USE, LESS THE NORTH 734.42 FEET THEREOF AND ALSO LESS THE 24 SOUTH 274.67 FEET THEREOF AND MORE PARTICULARLY DESCRIBED AS 25 FOLLOWS: 26 27 COMMENCING AT THE INTERSECTION OF THE NORTH LINE OF SAID 28 GOVERNMENT LOT 7 AND THE EASTERLY RIGHT -OF -WAY LINE OF SAID STATE 29 ROAD NO. 5, THENCE, SOUTH 16 051'25" WEST, ALONG SAID RIGHT -OF -WAY, A 30 DISTANCE OF 612.69 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE 31 EAST HAVING A RADIUS OF 1,850.09 FEET AND A PARTIAL CENTRAL ANGLE OF 32 04 015'09 ", THENCE, SOUTHWESTERLY ALONG THE ARC OF SAID CURVE, A 33 DISTANCE OF 137.31 FEET TO THE POINT OF BEGINNING, THENCE, CONTINUE 34 SOUTHERLY ALONG THE ARC OF SAID CURVE, WITH A PARTIAL CENTRAL 35 ANGLE OF 09 019'36 ", A DISTANCE OF 301.16 FEET TO A POINT ON A LINE LYING 36 274.67 FEET NORTH OF (WHEN MEASURED AT RIGHT ANGLES TO) AND 37 PARALLEL WITH THE SOUTH LINE OF SAID GOVERNMENT LOT 7; THENCE, 38 SOUTH 86 052'35" EAST, ALONG THE SAID PARALLEL LINE A DISTANCE OF 283.51 39 FEET TO A POINT ON THE EAST LINE OF SAID GOVERNMENT LOT 7; THENCE 40 NORTH 01 051'50" EAST, ALONG THE EAST LINE OF SAID GOVERNMENT LOT 7, A 41 DISTANCE OF 292.45 FEET TO A POINT ON A LINE LYING 734.42 FEET SOUTH OF 42 (WHEN MEASURED AT RIGHT ANGLES TO) AND PARALLEL WITH THE NORTH 43 LINE OF SAID GOVERNMENT LOT 7, THENCE NORTH 85 012'07" WEST ALONG 44 SAID PARALLEL LINE, A DISTANCE OF 251.91 FEET TO THE POINT OF 45 BEGINNING. 46 • • • Date Prepared: March 4, 2005 Resolution 44, 2005 1 SECTION 3. The City Council of the City of Palm Beach Gardens, Florida hereby 2 approves the following four waivers: 3 4 1. Section 78 -344, Construction and Maintenance, to allow for 53, 9.5 -foot 5 wide parking spaces. 6 7 2. Section 78 -153, Nonresidential Zoning District Regulations, to allow for a 8 41 -foot front building setback. 9 10 3. Section 78 -153, Nonresidential Zoning District Regulations, to allow for a 11 building height of 50 feet. 12 13 4. Section 78 -153, Nonresidential Zoning District Regulations, to allow for an 14 eight -foot wide landscape buffer adjacent to residential. 15 16 SECTION 4. Said Planned Unit Development is approved subject to the 17 following amended conditions, which shall be the responsibility of the applicant, its 18 successors, or assigns: 19 20 ,' 21 fees as here4naftF designated, 22 payments, 23 ($9,000.00) DGkLARS shall -be 24 paid to the ReGFeation Build D ng and Development Fund ar.Geunl ef the 25 . 26 (b) The total sum of TWENT4 SEVEN THOWDSAND THREE HUNDRED 27 ($27.300.90) DOLLARS shall be paid to the Read lirnpi:eyement Fk"W 28 of the City as follows; 29 30 TWO-11-IR-AND SIX HUNDRED FIFTY ($13,650.00) DOLLARS Ghall 31 be paid; 32 OGGUpanoy the sum of 33 , 34 DGLLARS shall be paid. 35 in the event that the Geurity of Palm BOaGh Ghall adopt aR OFdonanGe 36 37 38 39 fees imposed above by the Gity 6hall be applied ar. a rredit en aGr.Gu" 40 41 42 43 due to the City. 44 45 46 • • • Date Prepared: March 4, 2005 ResoluUon 44, 2005 1 2 3 Gity gRgi-ROOF and all etheF building F8qUiF8FAeRt6 Of the Palm Bea 4 5 Alec. 6 7 3. The building en the Site RlaR d96ignated a6 a bank now larated on the 8 e6 Fnay be Gontinued ar. a baRk faGility until May 1, 1991. Within 6i)d 9 ays upon twminafion Of 6a.d lea6e, andloF 6aid lea6e option, the 10 iuthody ingFe66 on the site and pFov*de 11 12 13 14 u6es of the StFUGtUFO WhiGh 6hall be peFmitted-. 15 16 , 17 . 18 19 the plan and drove in farility Femoved no later than three (3) yeaFs frGm 20 . 21 22 4. Signage, both temporwy and pemnanent, and any amendmentr. to the 23 24 25 26 Plan Review Committee rohall not bo required, noF 6hall a publiG heaFiAg OF 27 28 adoption of ruGh Re6olution. 29 30 31 the Gily a Unity of Title in requi6ito foFm to be appFaved by the City Aftorney 32 to the lands der.GFibed *n Exh4Nt "A," 33 34 6. A'! pharses of development in the neWly GFeated Planned Unit Development 35 , 36 37 apffOval of 6ub6equent QFdiRaRG,6. 38 39 40 hoW nGliva iss 41 42 43 prior to the i6suanr.o- Pf the first building pormit, 44 45 46 0 Date Prepared: March 4, 2005 Resolution 44, 2005 1 0. Signage infoFfning mote06ts of additional handiGap being 2 paFking spaGe6 3 4 5 10. The exi6ting vaGant one GteFy building on the be derneli6hed 6ite shall and 6 . 7 8 1. All mechanical louvers shall be painted to match the surrounding wall. 9 (Planning & Zoning) 10 11 2. Musical entertainment, including, but not limited to, bands instruments, and 12 speakers shall be prohibited in all outside areas on site. (Planning & 13 Zoning, Code Enforcement) 14 15 3, Outdoor seating for the restaurant shall be prohibited, no food and beverage 16 service shall be permitted in any outside area, and the existing outdoor 17 seating and food and beverage service operation shall cease immediateel 18 upon the adoption of this Resolution. (Planning & Zoning, Code 19 Enforcement) 20 21 4, The applicant shall reduce the number of hotel rooms to 77 within nine 22 months from the effective date of this Resolution. (Planning& Zoning) 23 24 5. Each hotel suite shall contain no more than one entrance /exit from the 25 common hotel corridor. (Planning & Zoning) 26 27 6. Within 45 days from the effective date of this Resolution, the applicant shall 28 convert the existing meeting room area to a multipurpose space to be 29 utilized for hotel guests. This multi - purpose space shall be limited to lobby 30 space, storage, an exercise area, or to address the needs of guests staving 31 at the hotel. No outside meetings, such as banquets or receptions, shall be 32 permitted on site. (Planning & Zoning, Code Enforcement). 33 34 7. The parking area below the ancillarVbuilding shall be 100% clear of all hotel 35 and restaurant storage, including the walled -in area located in the rear of 36 the underground parking area, immediately following the adoption of this 37 Resolution. The walled -in storage area shall be converted into two parking 38 spaces immediately following the adoption of this Resolution. (Planning & 39 Zoning, Code Enforcement) 40 41 42 43 44 45 46 • • • Date Prepared: March 4, 2005 Resolution 44, 2005 1 8. Within six months from the effective date of this Resolution, the applicant 2 shall construct two additional vertical feet to its existing concrete wall 3 located along its eastern boundary line. The existing concrete wall 4 separates the applicant's property from the Twelve Oaks Condominium 5 Association, Inc. The applicant shall apply for and obtain all necessary 6 permits. The two -foot addition shall be built and painted to match the 7 existing wall. 8 9 9. The applicant shall use its best efforts to secure all necessary consent and 10 permits to construct a fence to secure the approximately fifteen feet of 11 unsecured property along the southeast corner of the applicant's property to 12 prevent pedestrian traffic between its orwertv and the Twelve Oaks 13 Condominium Association, Inc. Said concrete wall or fence shall be built to 14 the same vertical height of the existing concrete wall located along its 15 eastern boundary line. Said wall or fence may include a lockable late. If 16 said wall is constructed of concrete, it shall match the existing_ concrete wall 17 and painted to match the existing wall. 18 19 10. The applicant shall prohibit swimming past dusk and use its best efforts to 20 prevent excessive noise between the hours of 9:00 p.m. and 8:00 a.m. 21 22 SECTION 5. Said Planned Unit Development shall be constructed in compliance 23 with the following plans, as amended herein, and on file with the City's Growth 24 Management Department: 25 26 1. Master Site Plan, Landscaping Plan and Elevation Plan, consisting of nine 27 (9) sheets and prepared by gbs & h Inc., dated December 13, 1988, and as 28 revised as of February 9, 1989, marked Job No. 88 -1002. , and attaGhed 29 heFetO ar. &Xhibit "13". "GARDENS SUITES NOTEL" shall be develope 30 aGGer4daRGe with said plans, "13 i 31 32 33 2. Master Site Plan prepared by Cotleur Hearing and gbs &h architects, dated 34 March 17, 1992, consisting of one (1) sheet. 35 36 3. North, West and East Elevations of the Pool Building, updated and prepared 37 by gbs &h architects, date stamped April 21. 1992, consisting of one (1) 38 page. 39 40 4. Floor Plan of the Pool Building, updated and prepared by gbs &h architects, 41 date stamped April 21, 1992, consisting of one (1) sheet. 42 43 5. November 13, 1996, Site Plan by Cotleur Hearing, Sheet 1 of 2. 44 45 6. November 13, 1996, Landscape Plan by Cotleur Hearing, Sheet 2 of 2. 46 • • r� Date Prepared: March 4, 2005 Resolution 44, 2005 1 7. November 11, 1996, Front Elevation by J.A.O. Architects and Planners, 2 Sheet A -1. 3 4 8. November 8, 1996, Right, Left and Rear Elevations by J.A.O. Architects and 5 Planners, Sheet A -2. 6 7 9. November 11, 1996, Parking Level Plan by J.A.O. Architects and Planners, 8 Sheet A -3. 9 10 10. November 11, 1996, First Floor Plan by J.A.O. Architects and Planners, 11 Sheet A-4. 12 13 11. August 8, 1996, Roof Plan by J.A.O. Architects and Planners, Sheet A -5. 14 15 12. August 8, 1996, Roof Plan by J.A.O. Architects and Planners, Sheet A -6. 16 17 13. November 11, 1996, Building Sections by J.A.O. Architects and Planners, 18 Sheet A -7. 19 20 14. Updated Lobby Renovation by J.A.O. Architects and Planners. 1 Sheet, 21 date stamped November 14, 1996. 22 — 23 15. Waterford Hotel Site Plan by Urban Design Studio. dated March 8. 24 2005, Sheet 1 of 5. 25 26 16. Waterford Hotel Landscape Plans by Urban Design Studio, dated October 27 15, 2004, Sheets 2 through 5. 28 29 SECTION 6. All future amendments to the Waterford Hotel PUD shall be 30 approved by Resolution. 31 32 SECTION 7. Said approval shall be consistent with all representations made by 33 the applicant or applicant's agents at any workshop or public hearing. 34 35 SECTION 8. This Resolution shall become effective immediately upon adoption. 36 37 38 (The remainder of this page left intentionally blank) 39 40 41 42 43 44 45 46 7 • • • Date Prepared: March 4, 2005 Resolution 44, 2005 PASSED AND ADOPTED this e4. day of (Aw-j '2005. 2 3 4 CITY OF PALM B C G E , FLORIDA 5 6 7 BY: 8 —6ij s ph R. Russo, Mayor 9 10 ATTEST: 11 12 13 BY: 14 Patricia Snider, CMC 15 City Clerk 16 17 18 APPROVED AS TO FORM AND 19 LEGAL SUFFICIENCY 20 21 22 BY: 23 Christine P. Tatum, City Attorney 24 25 26 27 VOTE: AYE NAY ABSENT 28 29 MAYOR R_USSO .i 30 31 VICE MAYOR JABLIN .� 32 33 COUNCILMEMBER LEVY ✓ 34 35 COUNCILMEMBERVALECHE ✓ 36 37 COUNCILM EMBER BARNETT / 38 39 40 41 42 43 44 45 46 47 \\Pbgsfile\ Attorney \attomey_share\RESOLUTIONS \waterford hotel - reso 44 2005 - revisions 4- 7- 05.doc 8 0 p r =ter � ra7 I I 7� o," °a 1 -o a cf o�Gfio aA V 1 p i •ItT - s_€ � s. fjp Y jE F _V � ` i' =tea__, -.. � .... .. ;:. .. mom.' ti ` D; N I-Zz,z0 uue" z i H >ZO F g' P�g 6E =xoz F[ In e OntCi.Z c o'. u a= zo` AIOA�Qxxjl mg HA oN m_9" �m�'S " "• $ Ill Watehrford Hotel Palim Beach Gardens, Florida Site Plan F n R s o s i DTgg M--7 i � T D M A s Gf m °m <3m Z1 D X333 Zmm w _ Na'm °� f -a a 3$ ' 2.g m 3 , 3 m m� m $ m a w a N 9 0 y m m aRN 0 °s °n 8oya,�m° - D _ vm�a�d H� uuQ n�N E � • � �.i,i .� _ � a V a I 0 p r =ter � ra7 I I 7� o," °a 1 -o a cf o�Gfio aA V 1 p i •ItT - s_€ � s. fjp Y jE F _V � ` i' =tea__, -.. � .... .. ;:. .. mom.' ti ` D; N I-Zz,z0 uue" z i H >ZO F g' P�g 6E =xoz F[ In e OntCi.Z c o'. u a= zo` AIOA�Qxxjl mg HA oN m_9" �m�'S " "• $ Ill Watehrford Hotel Palim Beach Gardens, Florida Site Plan F P R s o s i DTgg 7 IF-j • • I1 R ®IPHEIREI® -0 O m m j D O y A r _ n X > a O n y > 2 x Q m -� p i c v N > > N 3 T v N T T M 2 r M CE M G) V M T z 0 0 a r 2? T C c i m > y v m 0 x ; m n v a > O , D Z D ; y F m D A O d 7� 1-300� OL - 0 101 o� Go ) 1? '1000 7n b M 0 V r D M D r O C s I zr <O 4 8 A Palm Beach Gardens, Florida Landscape Improvement Plan it I l Mi V� On D v�o0 ccz 0yZ NTO I I I-n O C z —I D z D M D W r C 0 I f7f 7 7z 7 3a =: -: 1 ;fiiEj� 'go � November 15, 1996 . ORDINANCE 14, 1996 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PALM BEACH GARDENS, FLORIDA, AMENDING THE COMFORT INN PLANNED UNIT DEVELOPMENT APPROVED BY ORDINANCE 53, 1988, TO CONSTRUCT A TWO -STORY 7,507 SQUARE -FOOT ANCILLARY BUILDING; PROVIDING FOR THE REPEAL OF ALL ORDINANCES IN CONFLICT; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Palm Beach Gardens, Florida, previously approved Ordinance 53, 1988, creating the Comfort Inn Planned Unit Development; and WHEREAS, the City has received an application to amend the Comfort Inn Planned Unit Development; and WHEREAS, the City Council has determined that the amendment is consistent with the City's Comprehensive Plan. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF PALM BEACH GARDENS, FLORIDA. SECTION 1. The City Council of the City of Palm Beach Gardens, Florida, hereby approves an amendment to the Comfort Inn Planned Unit Development (PUD), authorizing to demolish an existing one -story 1,880 square -foot commercial building and the construction of a • two -story 7,507 square -foot ancillary building and other site changes upon the subject property. SECTION 2. The construction of the two -story building shall be in accordance with plans on file with the City's Planning and Zoning Department as follows: 1. November 13, 1996 Site Plan by Cotleur Hearing. Sheet I of 2. 2. November 13, 1996 Landscape Plan by Cotleur Hearing. Sheet 2 of 2. 3. November 11, 1996 Front Elevation by J.A.O. Architects and Planners. Sheet A -1. 4. November 8, 1996 Right, Left and Rear Elevations by J.A.O. Architects and Planners. Sheet A -2. 5. November 11, 1996 Parking Level Plan by J.A.O. Architects and Planners. Sheet A -3. 6. November 11, 1996 First Floor Plan by J.A.O. Architects and Planners. Sheet A-4. 7. August 8, 1996 Roof Plan by J.A.O. Architects and Planners. Sheet A -5. 8. August 8, 1996 Roof Plan by J.A.O. Architects and Planners. Sheet A -6. 9. November 11, 1996 Building Sections by J.A.O. Architects and Planners. Sheet A -7. 10. Undated Lobby Renovation by J.A.O. Architects and Planners. 1 Sheet. • • • • ORDINANCE 14, 1996 Page 2 11. March 14, 1996 Existing Building Elevations by J.A.O. Architects and Planners. Sheet A -8. 12. November 14, 1996 Conceptual Paving and Drainage Plan by Michael B. Schorah & Associates, Inc. 1 Sheet. SECTION 3. The amendment is approved subject to the following conditions: 1. A Boundary Plat shall be prepared, approved by City Council, and recorded prior to the issuance of the first building permit. 2. All mechanical louvers shall be painted to match the surrounding wall. 3. Signage informing motorists of additional handicap parking spaces being located in the parking garage shall be installed prior to the issuance of the Certificate of Occupancy. 4. The existing vacant one -story building on the site shall be demolished and removed within 90 days from approval hereof. SECTION 4. All Ordinances or parts of Ordinances in conflict are hereby repealed. SECTION 5. This Ordinance shall be effective upon passage. PLACED ON FIRST READING THIS ,d DAY OF JULY 1996. PLACED O EC D ADING THIS 0""bAY OF NOVEMBER 1996. PASSED A THIS /SfDAY OF NOVEMBER 996. 144A SEPH R. RUSSO C�Ot1NCI� BIND NROE VICE MAYOR LAUREN FURTADO CqVVCILMEMBER ERIC JAIJUN COUNCILMEMBER DAVID CLARK ATTEST: APPROVED AS TO LEGAL FORM LINDA V. KOSIER, CMC, CITY CLERK AND SUFFICIENCY BYE CI`CY ATTORNEY VOTE: AYE NAY ABSENT MAYOR RUSSO r VICE MAYOR FURTADO COUNCILWOMAN MONROE _ COUNCILMAN JABLIN COUNCILMAN CLARK .r/ July 14 1992 August 6, 1992 ORDINANCE 18, 1992 • AN ORDINANCE OF THE CITY OF PALM BEACH GARDENS, FLORIDA, AMENDING ORDINANCE 53, 1988, WHICH CREATED THE GARDENS SUITES HOTEL, NOW KNOWN AS "COMFORT INN ", A PLANNED UNIT DEVELOPMENT, AND AS SUBSEQUENTLY AMENDED BY CREATING A SWIMMING POOL BUILDING IN ACCORDANCE WITH PLANS AND SPECIFICATIONS CONTAINED HEREIN; AND, PROVIDING FOR THE REPEAL OF ALL ORDINANCES OR PARTS OF ORDINANCES IN CONFLICT HEREWITH; AND, PROVIDING FOR AN EFFECTIVE DATE HEREOF. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF PALM BEACH GARDENS, FLORIDA: Section 1. Ordinance 53, 1988, which created GARDEN SUITES HOTEL, now known as "COMFORT INN ", a Planned Unit Development and as subsequently amended is hereby further amended in accordance with the following plans and specifications: 1. Master Site Plan prepared by Cotleur Hearing and gbs &h architects, dated March 17, 1992, consisting of one (1) sheet. 2. North, West and East Elevations of the Pool Building, undated and prepared by gbs &h architects, consisting of one (1) page. 3. Floor Plan of the Pool Building, undated and • prepared by gbs &h architects, consisting of one (1) sheet. Section 2. The meeting facility shall be limited to hotel guests or in conjunction with hotel activities. Section 3. All Ordinances or parts of Ordinances in conflict herewith are hereby repealed. Section 4. This Ordinance shall be effective upon date of passage. PLACED ON F ST READING THIS _16TH _ DAY OF JULY 1992 LACED ON SEC D READING THIS Lr DAY OF ��fiitG'L� 1992. P SSED AND APP OVER THIS (0�' DAY OF Li 0 1992. MAYOR 7 1 �COUN/ LWOMA i VAC YOR COUNCIL N ATTEST: COUNCILMAN %i l l •1 "V, 'F'L) n: y QF11.1 • LIIfdA V. KOSIER, CITY CLERK AND =IJALaUFF C) ICIENCY VOTE: AYE NAY ABSENT MAYOR MARTINO �� •�' ' ' ' VICE MAYOR RUSSO COUNCILWOMAN MONROE COUNCILMAN KISELEWSKI k-11 W"10 6- ORDINANCE 53, 1988 • AN ORDINANCE OF THE CITY OF PALM BEACH GARDENS, FLORIDA, CREATING A PLANNED UNIT DEVELOPMENT ON CERTAIN LANDS LOCATED WITHIN THE CITY TO BE KNOWN AS "GARDENS SUITES HOTEL" WITH USES THEREOF AS DESIGNATED ON THE ATTACHED MASTER SITE PLAN, SAID LANDS BEING DESCRIBED IN EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF; PROVIDING FOR PAYMENT BY THE DEVELOPER THEREOF TO THE RECREATION BUILDING AND DEVELOP- MENT FUND ACCOUNT AND ROAD IMPROVEMENT FUND OF THE CITY AND METHOD OF PAYMENT; REQUIRING THAT THE LANDS DESCRIBED IN EXHIBIT "A" SHALL BE DEVELOPED IN ACCORDANCE WITH THE MASTER SITE PLAN, LANDSCAPING PLAN AND ELEVATION PLAN CON- SISTING OF NINE (9) SHEETS AND PREPARED BY GBS b H INC., DATED DECEMBER 13, 1988, AND REVISED ON 2/9/89, MARKED JOB NO. 88 -1002, AND ATTACHED HERETO AS EXHIBIT "B" ; PROVIDING THAT PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT THAT DEVELOPER POST EITHER A PERFORMANCE BOND, LETTER OF CREDIT OR ESCROW AGREEMENT TO GUARANTEE ALL ON -SITE ROAD IMPROVEMENTS, DRAINAGE, AND UTILITY IMPROVEMENTS; PROVIDING FOR A METHOD OF APPROVAL OF SIGNAGE; PROVIDING FOR UNITY OF TITLE; PROVIDING FOR METHOD OF AMENDMENT; PROVIDING THAT ANY ORDINANCE IN CONFLICT BE AND THE SAME IS HEREBY REPEALED; AND, FURTHER, PROVIDING FOR AN EFFECTIVE DATE HEREOF. • BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF PALM BEACH GARDENS, FLORIDA: Section 1. A Planned Unit Development be and the same is hereby created upon the lands known as "GARDENS SUITES HOTEL" located within the City of Palm Beach Gardens, Florida, and more particularly described in Exhibit "A" attached hereto and made a part hereof. the permitted usage shall be and the same is hereby designated as set forth in the Master Site Plan attached hereto and marked Exhibit "B ". In the event the sale of alcoholic beverages may arise in the use of the premises, all requests shall be filed with the City Clerk with such use to be determined by the City Council by a sub- sequent Resolution. The intervention of the Planning and Zoning Commission shall not be required nor shall the requirement that publi- cation in a newspaper of general circulation be required for such hearing. A variance to the distance requirements to the City • rr of Palm Beach Gardens Code between premises upon which alcoholic • beverages are sold is hereby granted. Section 2. Attached hereto and made a part hereof is a Master Site Plan, Landscaping Plan and Elevation Plan, consisting of nine (9) sheets and prepared by gbs & h Inc., dated December 13, 1988, and as revised as of February 9, 1989, marked Job No. 88 -1002, and attached hereto as Exhibit "B ". "GARDENS SUITES HOTEL" shall be deve- loped in accordance with said plans, and the conditions contained in that letter dated November 9, 1988, except for Item 6. is attached as Exhibit 9-1". Section 3. The Petitioner shall pay to the City of Palm Beach Gardens, Florida, impact fees as hereinafter designated, together with amounts of monies and time of payments: (a) The total sum of EIGHT THOUSAND ($8,000.00) DOLLARS shall be paid to the Recreation Building and Development Fund account of the City prior to the issuance of a Building Permit. (b) The total sum of TWENTY -SEVEN THOUSAND THREE • HUNDRED ($27,300.00) DOLLARS shall be paid to the Road Improvement Fund of the City as follows: 1. Prior to the issuance of a Building Permit the sum of THIRTEEN THOUSAND SIX HUNDRED FIFTY ($13,650.00) DOLLARS shall be paid; 2. Prior to the issuance of a Certificate of Occupancy the sum of THIRTEEN THOUSAND SIX HUNDRED FIFTY ($13,650.00) DOLLARS shall be paid. In the event that the County of Palm Beach shall adopt an Ordinance providing and requiring collection by the City of road impact fees imposed by the County for improvements made in munici- palities and the same shall be in effect prior to the issuance of a Building Permit, then the road impact fees imposed above by the City shall be applied as a credit on account of the County fees except IWM • as the project shall impact City local streets, such impact to be • determined In accordance with the requirements of the City's Ordinance pertaining thereto. Debits and credits shall be applied by the City in the determination of such fees due to the City. Section 4. No Building Permit shall be issued until the drainage and paving plans for development of the Planned Unit Development shall be approved by the City Engineer and all other building requirements of the Palm Beach Gardens Code and requirements of other governmental agencies shall be met. Section 5. The building on the Site Plan designated as a bank now located on the premises may be continued as a bank facility use until May 1, 1991. Within sixty (60) days upon termination of said lease, and /or said lease option, the Petitioner shall close the existing Southerly ingress on the site and provide landscaping in said ingress area in accordance with the Palm Beach Gardens Code. Further, upon termination of use as a bank, the drive -in facility portion of the said structure shall be removed prior to the following uses of the structure which shall be permitted. . Professional and business offices as setforthin Chapter 159.088, Paragraphs A (2) and (3) and the use as a bank, excluding drive -in facilities. The elevations of the bank building shall be modified in accordance with the plan and drive -in facility removed no later than three (3) years from effective date, or as setforth above, depending which event shall first occur. Section 6. Slgnage, both temporary and permanent, and any amendments to the landscaping plan approved hereby, in the event necessary, shall be reviewed and approved by the City Council by subsequent Resolution. The intervention or review of the - 3 - 0 • Planning and Zoning Commission or the Site Plan Review Committee shall not be required, nor shall a public hearing or publication in a newspaper of general circulation be required prior to the adoption of such Resolution. Section 7. Petitioner, prior to the issuance of the first Building Permit, shall deliver to the City a Unity of Title in requisite form to be approved by the City Attorney to the lands described in Exhibit "A ". Section 8. All phases of development in the newly created Planned Unit Development shall be completed within three (3) years from the effective date hereof, and the owner /developer may obtain extensions for good cause shown by approval of subsequent Ordinance. Section 9. All references to Petitioner and /or Developer, • together with all requirements provided herein, shall apply to and be binding upon its successors and assigns. ' Section 10. All Ordinances or parts of Ordinances in conflict herewith are hereby repealed. Section 11. This Ordinaance shall be effective upon date of passage. PLACED ON FIRST READING THIS 15TH DAY OF DECE ER, 1988. PLACED ON SEC -- READING THIS, 4'x.1. /i DAY OF ,�/ ��i;; �,� 1989. PASSED AN AD PTED'NTHIS 16 `i' DAY OF �/� �c :,ii . r.� � 1989. ' MAYOE --COUNCILWOMAN VICE -MAYOR COUNCILMAN ATTEST: COUNCILMAN � <_ .,.- -,'. f LINDA IND, CITY CLERK,�CMC • APPROV§O AS TO FORM AND LEGAL ICIENCY C� CITY ATTORNEY _.__ EXHIBIT "A" ALL THAT PORTION OF GOVERNMENT LOT 7, SECTION 4, TOWNSHIP 42 SOUTH, RANGE 43, • PALM BEACH COUNTY, FLORIDA, LYING EAST OF THE EAST RIGHT -OF -WAY LINE OF STATE ROAD NO. 5 (U.S. HIGHWAY NO. 1), AS NOW LAID OUT AND IN USE, LESS THE NORTH 734.42 FEET THEREOF AND ALSO LESS THE SOUTH 274.67 FEET THEREOF AND MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT THE INTERSECTION OF THE NORTH LINE OF SAID GOVERNMENT LOT 7 AND THE EASTERLY RIGHT -OF -WAY LINE OF SAID STATE ROAD NO. 5; THENCE, SOUTH 16'51'25" WEST, ALONG THE SAID RIGHT -OF -WAY LINE, A DISTANCE OF 612.69 FEET TO THE BEGINNING OF A CURVE, CONCAVE TO THE EAST, HAVING A RADIUS OF 1850.09 FEET AND A PARTIAL CENTRAL ANGLE OF 04'15'09 "; THENCE, SOUTHWESTERLY ALONG THE ARC OF SAID CURVE, A DISTANCE OF 137.31 FEET TO THE POINT OF BEGINNING; THENCE, CONTINUE SOUTHERLY ALONG THE ARC OF SAID CURVE, WITH A PARTIAL CENTRAL ANGLE OF 09'19'36 ", A DISTANCE OF 301.16 FEET TO A POINT ON A LINE LYING 274.67 FEET NORTH OF (WHEN MEASURED AT RIGHT ANGLES TO) AND PARALLEL WITH THE SOUTH LINE OF SAID GOVERNMENT LOT 7; THENCE, SOUTH 86'5235" EAST, ALONG THE SAID PARALLEL LINE A DISTANCE OF 283.51 FEET TO A POINT ON THE EAST LINE OF SAID GOVERNMENT LOT 7; THEN, NORTH 01'51'50" EAST, ALONG THE EAST LINE OF SAID GOVERNMENT LOT 7, A DISTANCE OF 292.45 FEET TO A POINT ON A LINE LYING 734.42 FEET SOUTH OF (WHEN MEASURED AT RIGHT ANGLES TO) AND PARALLEL WITH THE NORTH LINE OF SAID GOVERNMENT LOT 7; THENCE, NORTH 85'12'07" WEST ALONG SAID PARALLEL LINE. A DISTANCE OF 251.91 FEET TO THE POINT OF BEGINNING. SAID PARCEL CONTAINING 1.85 ACRES MORE OR LESS. SUBJECT TO EASEMENTS, RESERVATIONS, AND RIGHTS OF WAY OF RECORD. THE PROPERTY DESCRIPTION SHOWN HEREON IS AS FURNISHED, AND SAID LANDS HAVE NOT BEEN ABSTRACTED FOR RIGHTS OF WAY AND /OR EASEMENTS OF RECORD. ANY REPRODUCTIONS OF THIS SKETCH OF SURVEY ARE NOT VALID UNLESS SEALED WITH THE EMBOSSED SEAL OF THE CERTIFYING SURVEYOR. • r �J Major_ Projects Abacoa DRI Y Town of Jupiter Donald Rd A` EeppoiMS ' a Frenchman's Creek oar 1 W J, V 50 `.- C 43 roaoo.p cmm.ayux ronnm n am - rre�k tlgtll�vl ypfo�nl Parch �acel 7"o T IVIIraSO'� 31.01 avo avit 0 31.0 31 ' z F `} MC � W '' PGA Blvd � ioV BB .� `,.. 47 Q X1 5 Blvd S B U R A IVd cBurns Rd PGA National BallenlSles 1� rA N W G 1 -ni Noi 1 4s Q o 1\ � , f W E �� S Letters under Project Number are the Initials for the Project Planner P = Pending R = Returning for additional review 'DRC = Development Review Committee LPA = Local Planning Agency ® BOD = Build Out Date ALM BEACH GARDENS See Attachment for Approved projects within the city A Signature City 4,300 0 4,300 8,600 12,900 17,200 Feet 1 m im lako Park Numbering System does not indicate priority of Review Processing Important: The schedule listed below is Tentative. Please Contact Planning and Zoning to Confirm Schedule: 561 - 799 - 4243 Concurrency Concurrency DRC Concurrency NIIIIII Major Projects Submittal Date Certification DRC' Certification Planning &Zoning City Council Build out Date ( i) (Dec 31) 31 mark (P• December 25, 2000 January 3, 2003 December R 2004 January 24, 2006 Ill 6 131.07) Mardi 20, 2002 R e, oning from P DA to ° c '° -^ " Con- Landu.rerhmgrfrwn RHto MXD4'UD tact:Jin Gielda Land Design Mxn Workshop South; 561- 395 -6868 Residential High &Mixed Use Project, 176 multi-famly condo tax units, 39,167 sq If office, 24,512 sq It retail, 14,655 sq It restaurant, 21,600 sq It furniture store, 141,706 sgIL 4-story parking garage w 1409 spac es 38 (Pare:: March 28, 2003 April 18, 2005 May 13, 2004 September 23, 2003 Novem her 6,2007 TM AMXD) May 21, 2003 April 13, 2006 Al hargeMXDloRif MXD toRH.PH ixr G.: -. - ;:mrted Part t ° "d art rhange�nm MXU U� Puhhe Hearing VReadmg nership RH ReetoCC December 4,2003 Contact: Urban Design Studio; June 18, 2103 .tune 28, 2005 MXD to RH, PH 366 -1100 Workshop 2nd Readoig 10,000 sq If Office, 12,000 sq It Novem her 8, 200.5 Drugstore, 4,000 set itBank, Pubh,llearing Deeem her IK2007 15,000 sq fl Restaurant, Re, k) CC MXD to RH. PH 2087 11,600 sq It Retail, 252 Taw n January 24, 2006 2nd Readng house Units Rezoning to M XD June 15, 2006 Workshy RezontngtoMXD April 25, 2006 PH RezoningtoMXD July 20, 2006 Rec to CC Rezoningto MXU PH 43 nehman's Crossing December R 2004 July 25, 2006 BW :,od Rd & ALT A1A September 22, 2005 RezoningtoMXDt ne Xat;C"I) PUD Owner: H. ^.ompany Workshop Contact: Jennifer Morton, Land Design South, (561) 478- 2008 2008 8501 71,650sgIt, Neighborhood Commercial, 72 dw elhng units, 13,050 sq it Employment Center Dc. July 25, 2006 November 2, 2006 BW Ow Workshop I ea R-J.g Contact: LIDS 366 -1100 I'll Redesignate Commercial to De rmhrr 7, 2006 Mixed Use PUD 89,000 sq It .h:d Rmdm7; self storage building, two 7,500 sg4t restaurants, and a 3,100 sq PLl f t bank 48 December a 2005 TM Cortact: Kin betty Glas- Castro, (561) 8384542 180 Tow, nhouse units 49 Nc May 11, 2006 SM Ownei �mutn vdart Contact: Cotbur& Hering, 747 -6336 Redesignate Commercial to Residential High 158 multi- family dwelhng units TM Contact: Cotleur & Hearing, 747 -6336 Redesignate Residential Law to Residential Medium 83 multi- farrty dwelling units 51 Pa ardens August 23, 2006 JH W r: sfi. Ow net Palm Beach Acquisition Lk C' Contact: Jan Poison, Cotleur & Hearing, 747 -6336 Redesignate 495 978 acres From Residential- R R1 0, Com- mercial, & industrial To Industrial (121 acres),Com- mercial (40 acres) & Conserva- tion (335 acres Source Growth Management Department Palm Beach Gardens, FL Printed 11/292006 $8 00 per copy 60OZ' LC,•gw•o-(3 900Z44 uo[plosea sawoq wool 4Z 14W unulw.Wn 9 L PON lc I- qw -o.O GOOZ'991 uoryllos -a - ba l -pm-v­4. oa p u o0o tro 98 SOOT 4E 010 .. ffl U b.00O'ul )o U'bs 000'009 Pue eoJp p'Y 'bs 000'04Z . So0z Z9t.- Mlos-a S6oz'ZS l uOWVO"a 'Z[ a4un APwe1RF+W 09ZIna,ewwo0ll be ppp'pl M/ SOOZ ealeug,O BOOTIE I- glu•o•O SOOZ'9L l- Wrl-.a eaUo wuolssa)wdabs 000 09 Z SOOZ'LE ea 4-0 9ooZ n u-q wc-N 9OOZ'lc,-gwea-O SOOZ'c9 uomm— SOOZ'6l- �,.upo was OZ'uoid .u.xe =IS 95E'LSl Soot .91 ....po 9002 `I I uow Na exdt ..W. I.uoaasep,d U ba ZCfi'ZZ X �O SOOL-GL I uoTPNa -cll - -110 R ?P•W U ba 9516 -11--4d ., M •s010 U b. Zez'9 t 'A-w t :Z 6u!Ptne POOZ'9Luognl•••a •LOUb- OSO'ol'A,gcL L&WIn9 q '.a6u1Pl1ne 110 RuOI —J-d 400Z 'Z6 uoTlosea • J1O RUOlss.p,d U bs 'Pe- LOOZ IE,egw (] 400Z'EL ea,eug,O 006-01 mli U b. oS661 'Pelsa SZO n - - n '4oaVOY°u.O Pu.p.8 J. u b• fES 49 'qM- 1111-PS. SZZ :l !.,d ° pexltl LOOZ'lC- gw-o-O 4WZ'961 WWW. -a sw,n Alas) -mss OZZ rooz'fic •1•wwo syl.l N!w•r1U'w 6/z :w•hId earl P•nw 1 LODZ'IC-q---O tOOZ,9l.Z -.Trio 8 to U be pulslpl. ba 00005 We'.alpp'4 O0000l 1911.1111d ,•ws7 lb-Cl YOd $ f00Z• »rusu!WO 'Rgw p'U ba 000'051 :P.[wd -w1 P..W LOOZIC,•gw -o•O 4ppZ'ty• ulpo esllela,eluj Ubs OOS'Z'es1 RoIPeW 400z,Llzu -WIP-• 1 Uba OSS't I'RwI- wu- 3Ub- SLO'SI' -ads .1.xR- 11 Nis a ­p "r) N -op 0 U ba OOZ Lf :1,- wd0l-..P -all P-nW LOOZ'iC -q --0 0O0Z'6Z l uo0nPNa w'=IS OOD66E 'e JP j Pu 5 000'69 Jow-O • n P•-v4 iv�vawwo0 ­Id A-6­1 900Z'IC ,•qw...0 4OOZ'Sf l uopryos-a 6ugpne tn.a 11 bs 6£8 ifl loelad N•lea 'Ind 4­3 ..,,b .>fryI/,:.1 d 13x9 LO "K 1 -11 -d LODZ'LC,-gw -x0 EOOZ n l uolnoaea IRlea U b. 00091 PU.•oIUO Y b. 000'SOl .nobs I- .11ns.aR O sIV•8 0 -17. -J N 000'Ol wogs -v.luenw� LODZ'M l -q--O EOOZ'991 uo!" ' Pu•.!M. -5 N.)w bs 5Z6'E BOf R°°61 -1 •b• 699ZY to 01 I­d M•M iosll N COOZtz a F-P woes 1 ,.ow6 W-J wslbs SPED 'LS :w-!Old tq-a 6o0Z'9l k--r EOOZ'961 uopgo•-a w. lol.AeO opuoo Pun 991 (t 1'1 Z I -­d) 4 ..Purl -a w s9.ln Atus WM 991. LOOZ lc).gw.P-O EOOZ'L -m P10 poolPgyBIM.I i.1sN w000 O Rq waDs 5LE'6l u°PnO .W le spw6 s� � e7.U0 ss-ulsna l••l w.nb. SLE'6l root - L£,egw -o-O OOOZ'4.z,.ug,0 Atw•) MK- 06 .I."ll u.s H IOU Ic )-glue Q Z00Z'9/ _--q -0 Ioolp'y -wood I••1 w-nba Eovoc P-4-s".9 r BOOT lc ,"- -o-O ZOOZ ZE •1Ng1O s)-n Al.-=I MBulg EEE ­13 W-0 u -d PIO t spm 6uwl P.ISlss. 91l LOOT le ,egweoeO Zo9Z'E- ---P1O swn APw•l M6ua OOZ a>t"gy N1.••Iq.9 H q- 4-pr- O91 W.9 R•1 wslbs 09L'Z IN .anld 900Z'Ifngw 0 tGUZ'le --WPO IuuIMI.ea IN) wenb. OOO'S 13nd-11 -Au-g E) -olUO I -) --ba Op0'SZ axw n'il I---d eye wugss-)aId )N) -d- 000 OZ 6002 1E mgLu -O Coot 16 uww.a nu-up 1N1 waft 069'Lg w- w.wA-M 1--1 w.nbs 542 On w P,M-a 1-IUwp.roO j R-- p­4-%0- IN) wslbc 00O9Z 60OZ lE,.gw­0 COOZ l9uomlo u s°enarw.ol SZZ ".0 mog,.N 3 4002 lC I- gwea-O s)u..gsdy 966 d IOOZ OSuogllos•a .M-A u.y - - LOOZ IE,•gw -o-O -__- 100Z 4- --!FuO - wn5 -o--O OES ax,as °a a, u.wvway 9002 lC1 -qu- c 9OOZ'9fuowgoa-N 900Z' ►1-a,.ulplp s°v1oIF-nol A-IS C pu. Z S/Z:1 uldolel•O ROUeq"a 'i0�lt l•yd)uoldw.Ipnoy 8 m-n "-a0 A1PI•lgnW 95l LOOT Ie,egw -oeO ZOOZ'CS•-.u* -0 ..00 sa-.-S l -q wvnba W06 .b -IRA S V PP wa rO VIM Y 111111 d 1.lo,auau.0 1-6) wwlb. 961961 q.a loo Ppng uoiwg•s•1Y•ou•uN,O (%M pu. N°) ° rd s) .6.sll N,y q -go,d ,ohN .wpq u s. q- o d p.cea (uo6ppV d. V4 •u•Pmg 42-49 u6-dlo N13 ata uPAW %o fo,d -f-w i. Please Print Name: /I Address: City: Subject: COMMENTS FROM THE PUBLIC Request to Address City Council J Our Members of the public may address the City Council during the "Comments by the Public" portion of the agenda and during "Public Hearings ". This Request to Address the City Council must be delivered to the City Clerk prior to the commencement of the meeting. The time limit for each speaker is limited to three (3) minutes. COMMENTS FROM THE PUBLIC Request to Address City Council Please Print Name: ���l���G�� 7-4 Address: city: Subject: Members of the public may address the City Council during the "Comments by the Public" portion of the agenda and during "Public Hearings ". This Request to Address the City Council must be delivered to the City Clerk prior to the commencement of the meeting. The time limit for each speaker is limited to three (3) minutes.